Misplaced Pages

Toledo, Cincinnati and St. Louis Railroad

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from TC&StL) System map as of 1884
Toledo, Delphos & Burlington Railroad, 1881
Former railroad line
Toledo, Cincinnati and St. Louis Railroad
Overview
LocaleIllinois, Indiana and Ohio
Dates of operation1879–1885
Technical
Track gauge3 ft (914 mm)
Length780 mi (1,260 km)

The Toledo, Cincinnati and St. Louis Railroad ("TC&StL") was a 3 ft (914 mm) narrow-gauge railroad operating in Ohio, Indiana and Illinois. It began as a subsidiary of the 3 ft (914 mm) narrow-gauge Toledo, Delphos and Burlington Railroad ("TD&B"). The entire TC&StL system, principally linking Toledo, Ohio with Cincinnati, Ohio and East St. Louis, Illinois, was operational by March of 1883, consisting of about 780 miles of road. However, the railway quickly landed in bankruptcy, and was broken up.

History

The predecessor TD&B came about on May 23, 1879 from a merger of several other railroads. While originating in Delphos, Ohio, the line always had its eyes set on Toledo, Ohio as one terminus, and expected the other to be Burlington, Iowa.

A separate railroad which became important to the TD&B was the 4 ft 10 in (1,473 mm) Iron Railroad founded on February 2, 1848, and based in Ironton, Ohio. The TD&B wished to reach Ironton, which was a rail- and ingot-producing town, In 1881, the TD&B reached an agreement with the Iron Railroad to dual-gauge a segment of its line by laying a rail spaced to 3 ft (914 mm) narrow-gauge in-between the Iron Railroad's existing track. Both railroads merged later that same year, retaining the TD&B name.

However, the TD&B's intended western termination point changed in the spring of 1880 from Burlington to East St. Louis, and the TC&StL subsidiary was formed in February of 1881 to handle construction of the extension from Kokomo, Indiana to that destination. On February 23, 1882, the TD&B and the TC&StL were merged, with the enterprise continuing under the TC&StL name, since it was then more representative of the system. The extension was in operational shape by March 1, 1883, and express trains were linking the railroad's three principal cities of East St. Louis, Toledo and Cincinnati in the summer of 1883. This gave the railroad a total of about 780 miles of track.

Along the way, the TC&StL was a promoter of the Grand Narrow Gauge Trunk. If all required elements had fallen into place, this would have created continuous 3’ narrow-gauge tracks extending from Mexico City to the Great Lakes. A railroad called the Texas and St. Louis Railway was constructing narrow-gauge trackage from Gatesville, Texas to Bird's Point, Missouri, and that company already planned to extend southerly to Laredo, Texas, where not much more than a bridge or ferry would have been necessary to have joined it to the narrow-gauge rails of the National Railroad of Mexico which ran south from Nuevo Laredo, Mexico to Mexico City. Then, a new railroad would have been needed to fill the gap between the end of the Texas and St. Louis line in the north and a connection around St. Louis to the TC&StL, which would have provided the route into Toledo on Lake Erie. Representatives of the TC&StL and the Texas and St. Louis announced in January of 1881 their agreement to form such a linking railroad, to be called the Toledo, Texas and Rio Grande. While a company of that name was chartered in Illinois on June 8, 1882, financial issues with both sponsor railroads starting around the fall of 1882 quickly prevented any real progress on the plan. While the failure of the Grand Narrow Gauge Trunk and its sponsors did not by itself doom the narrow-gauge railroad movement in the U.S., this occurrence was seen as solid evidence that narrow-gauge lines were not competitive with standard railroads for general transport purposes, although they might still have uses in niche applications.

The financially troubled TC&StL system entered receivership later in 1883, and was split at foreclosure in 1884 and 1885 as follows:

References

  1. ^ Hilton, George (1990). American Narrow Gauge Railroads. Stanford University Press. p. 473-479. ISBN 0804723699.
  2. "D T & I RR in Lawrence Co., OH". 2016-01-30. Archived from the original on 30 January 2016. Retrieved 2022-09-13.
  3. History of the Detroit, Toledo and Ironton Railroad
  4. ^ Hilton, George (1990). American Narrow Gauge Railroads. Stanford University Press. p. 101-117. ISBN 0804723699.
  5. "St. Louis Southwestern Railway, "The Cotton Belt Route"". American-Rails, June 12, 2023. Retrieved October 8, 2023.
  6. Poor's Manual of Railroads. H.V. & H.W. Poor. 1884.


Stub icon

This United States rail–related article is a stub. You can help Misplaced Pages by expanding it.

Categories: