Misplaced Pages

TSHD Congo River

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Trailing Suction Hopper Dredger Congo River is the newest ship of the DEME fleet with the biggest hopper capacity: 30,190 m. DEME N.V. signed a contract with IHC Dredgers B.V. for the design, construction, and delivery of the ship.

Launching

The contract between DEME N.V. and IHC Dredgers B.V. was signed in December 2008. On 15 December 2009 the keel was laid, and on 8 July 2011 the ship was named during a formal ceremony in Zeebrugge.

Christening

Justine Henin, the olympic tennis champion, has been designated to be the godmother of the Congo River. The christening took place on 8 July 2011 in Zeebrugge.

Main characteristics

The main characteristics of the Congo River, construction year 2011.

Overall length 168.00m
Width 38.00
Depth 13.30
Draught 12.15
Hopper capacity 30,190m
Loading capacity 48,000t
Speed 16.60kn
Dredging depth maximum 36.00 / 56.00m

The hopper can be equipped with the Dracula system with a power of 27,677 kW. The Dracula system is used for the dredging of cemented sand with an UCS-value of 5 to 8 MPas.

New contract

The Congo River has been assigned to the Eko Atlantic city project in Nigeria.

References

  1. Dredgepoint ,.
  2. Christening.
  3. Link Congo River Archived 2012-08-16 at the Wayback Machine,.
  4. "CEDA DIGITAL LIBRARY - CEDA (Central Dredging Association)". www.dredging.org. Archived from the original on 2013-05-08.
  5. Link DEME project,.
Categories: