Misplaced Pages

Quebec City–Windsor Corridor (Via Rail)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Toronto-Sarnia train) Via Rail passenger train service area in the Canadian provinces of Quebec and Ontario
Quebec City–Windsor Corridor
A Via Rail train approaching Belleville station
Overview
OwnerCanadian National Railway, Canadian Pacific Kansas City, Metrolinx, Via Rail
LocaleQuebec City–Windsor Corridor
Termini
StationsToronto, Ottawa, Montreal, Kingston, Guelph, Kitchener, London
Websiteviarail.ca/corridor
Service
TypeInter-city rail
SystemVia Rail
Operator(s)Via Rail
Ridership4,782,493 (FY 2019)
History
Opened1856
Technical
Number of tracksmore than 2
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Operating speed160 km/h (100 mph)
Route map
The Corridor
Legend
km km
International
to Chicago (discontinued)
Windsor 359 290 Sarnia
000 000
Chatham 290 268
Wyoming
Glencoe 235 227 Strathroy
216 195 London
000 000
000 000
Ingersoll 185 160 St. Marys
Woodstock 171 143 Stratford
Brantford 128 101 Kitchener
Niagara Falls 132 000
Bayview Junction 059 079
Guelph
Grimsby 089 56 Aldershot
St. Catharines 113 050 Georgetown
Niagara Falls 132 34 Brampton
Niagara River 133 34 Oakville
Amtrak
Maple Leaf
to New York City
2 Bathurst Street
000 0 Toronto
000 000
000 021
Guildwood
51 Oshawa
101 Port Hope
113 Cobourg
163 Trenton Junction
182 Belleville
217 Napanee
254 Kingston
000 000
000 290
Gananoque
335 Brockville
380 Smiths Falls
430 Fallowfield
Cornwall 428 446 Ottawa
000 000
Ontario
Quebec
000 493
Casselman
533 Alexandria
Ontario
Quebec
475
569
 
Coteau Junction
476 Coteau
Ottawa
River
West Channel
East Channel
520 Dorval Montréal–Pierre Elliott Trudeau International Airport
539 Montreal Amtrak
000 000
000 000
St. Lawrence River
545 Saint-Lambert
Richelieu River
592 Saint-Hyacinthe
639 Drummondville
785 Charny
Saint Lawrence River
790 Sainte-Foy
811 Quebec City
km

The Quebec City–Windsor Corridor (French: Ligne de Québec à Windsor), also known as simply the Corridor, is a Via Rail passenger train service in the Canadian provinces of Quebec and Ontario. The Corridor service area has the heaviest passenger train frequency in Canada and contributes 67% of Via's revenue.

History

Prior to Via's formation in 1978, Canadian National Railway operated its passenger trains, branded Rapido, on the same tracks and Canadian Pacific Railway (now Canadian Pacific Kansas City) also offered limited service.

High-speed proposal

Main article: High-speed rail in Canada § Quebec City–Windsor

During the 1970s and early 1980s, CN and later Via Rail operated the Turbo Train on existing freight rail trackage. This equipment was later replaced by the Bombardier LRC (Light, Rapid, Comfortable) train sets. Beginning in the 1980s and through the 1990s, Via Rail, Bombardier and the provincial and federal governments studied the feasibility of establishing a dedicated high-speed passenger rail network linking Quebec City–Montreal–Ottawa–Toronto–Windsor similar to the French TGV as a means of reducing domestic air and highway travel between these destinations.

After a hiatus of ten years, a feasibility study on launching a high-speed rail service in the Corridor will be updated at the joint cost of the federal government, Ontario and Quebec. On November 14, 2011, the three governments officially released the final report of a high-speed rail study for this corridor.

2009–2010 improvements

In 2009–2010, Via used CA$300 million of government stimulus money to upgrade segments of the Corridor. Notable track improvements were 70 km (43 mi) of additional third main track in four segments, and a short segment of fourth main track, as well as additional yard tracks at three locations. Improvements were made to several stations along the line, with new station buildings constructed at Belleville and Cobourg, and additional platforms for existing stations at Brockville and Oshawa. The improvements were planned to reduce delays along the route and to allow for a reduction in travel time of up to 30 minutes from end to end. They were intended to allow Via to introduce two new round-trip trains from Toronto to both Montreal and Ottawa without requiring the acquisition of new equipment.

Service

Inter-city rail

Main article: List of Via Rail routes

Inter-city service along the Corridor is provided by several different routes connecting the different cities served by the service. There is no single route that travels the entire length of the Corridor from Windsor to Quebec City. Via runs a mix of local-service and express trains in the Corridor. The Corridor service area has the heaviest passenger train frequency in Canada, with 36 Via trains traversing the route daily. About 67% of Via's revenue comes from Corridor routes.

Via trains that start and end within the geographic region of the Quebec City–Windsor Corridor are branded as a part of the Corridor service. Other inter-city trains from outside the Corridor may have their terminus at stations in the Corridor, such as the Canadian and the Ocean, but are marketed by their respective train names and are not considered to be Corridor services.

The Maple Leaf, a through service from Toronto to New York City, operated jointly with Amtrak, is crewed by Via as trains 97 and 98 on Via schedules, between Toronto and Niagara Falls, and can be considered part of Corridor services as well. It is the only scheduled rail service from the Corridor line from Burlington to Niagara Falls.

Commuter rail

A GO Transit train on the main line in Toronto's west end

Two commuter rail agencies, GO Transit and Exo, share tracks with Via's Corridor trains. Both agencies are provincially funded and independent of Via.

Trackage

Most of the trackage that Via trains use along the Corridor is owned by the Canadian National Railway. Via owns three former freight lines long the Corridor, one from Smiths Falls to Coteau-du-Lac, Quebec, via Ottawa; one from Smiths Falls to Brockville; and one from Chatham, Ontario, to Windsor, Ontario. Via Corridor trains run on three segments of tracks owned by Metrolinx; one from Burlington, Ontario, to Pickering, Ontario; one from Toronto Union Station to Malton, Mississauga; and one from Georgetown, Ontario, to Kitchener, Ontario. The proposed High Frequency Rail plan calls for adding Corridor services between Toronto and Quebec City that run on newly constructed dedicated tracks.

Future

On July 6, 2021, Transportation Minister Omar Alghabra announced that the federal government would launch the procurement process to build a high-frequency rail corridor between Toronto and Quebec City by 2030. The cost of the project was expected to be between $6 billion and $12 billion. The plan is to have trains travel up to 200 km/h (125 mph) on a line that would run from Toronto to Quebec City through Peterborough, Ottawa, Montreal, Laval, and Trois-Rivières. As opposed to current operations along the Corridor, the trains would run on dedicated passenger tracks, improving service reliability since the trains would not have to compete with freight trains. Service reliability could increase to 95 percent, up significantly from its 2021 rate of 67 percent. Travel times are projected to decrease by 90 minutes on some routes, such as between Ottawa and Toronto. Ninety percent of the route is planned to be electrified. The timing of the announcement was criticized as political, since there was speculation of a federal election being held later in the year, which was later confirmed on August 15.

In July 2023, the government selected three consortia to proceed to the request-for-proposals stage:

On October 28, 2024, it was confirmed that High Frequency Rail would be built as fully high speed rail, with fully grade-separated trains capable of travelling up to 300 km/h (186 mph). The winning bid is expected to be announced in a few weeks time, with design of the system expected to take approximately four years.

See also

References

  1. "Annual Report 2019" (PDF). viarail.ca. Via Rail Canada. p. 9. Retrieved 13 September 2020.
  2. Greenaway, Norma (January 10, 2008). "Ontario-Quebec to study rapid rail link". National Post.
  3. "High-Speed Passenger Rail Study Released". Retrieved May 20, 2017.
  4. ^ Warwick, Peter (December 2009). "Via's bold Corridor plan". Trains Magazine. Kalmbach Publishing.
  5. ^ SUMMARY OF THE 2017 – 2021 CORPORATE PLAN AND 2017 OPERATING AND CAPITAL BUDGETS (PDF) (Report). Montréal: Via Rail. 2017.
  6. ^ Westoll, Nick (July 6, 2021). "Feds set to begin procurement process for Toronto-Quebec City high-frequency rail corridor". Global News. Toronto: Corus Entertainment. Retrieved 2021-08-16.
  7. ^ Boisvert, Nick (July 5, 2021). "Liberals announce plans for new 'high frequency' rail lines from Toronto to Quebec City". CBC News. Ottawa. Retrieved August 16, 2021.
  8. Johnston, Bob (March 2023). "VIA NEW TRAINS, NEW CHALLENGES". Trains (magazine). Vol. 83, no. 3. Kalmbach Media. pp. 22–31.
  9. Three consortia in running for Canada’s High Frequency Rail project International Railway Journal July 24, 2023
  10. "Cabinet green lights high-speed passenger rail line between Quebec City and Toronto". The Globe and Mail. 2024-10-28. Retrieved 2024-10-29.
  11. "MSN". www.msn.com. Retrieved 2024-10-29.

External links

Via Rail
Current routes
Former routes
Infrastructure
Categories: