Misplaced Pages

Transmetro

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Bus rapid transit system in Guatemala City, Guatemala
Transmetro
LogoLogo
A Transmetro bus in Guatemala CityA Transmetro bus in Guatemala City
Overview
OwnerGuatemala City
LocaleGuatemala City, Guatemala
Transit typeBus rapid transit
Number of lines8
Line numberLine 1, Line 2, Line 6, Line 7, Line 12, Line 13, Line 18, Route 5
Daily ridershipabout 120,000
Websitemuniguate.com/muni/transmetro/
Operation
Began operation3 February 2007
Operator(s)Municipalidad de la Ciudad de Guatemala (Municipality of Guatemala City)
Number of vehiclesAbout 300: ~13 bi-articulated buses, ~48 articulated buses, ~239 non-articulated buses
HeadwayAverage of 5 minutes during peak periods
Technical
Average speed60 km/h (40 mph)

Transmetro is a bus rapid transit system in Guatemala City, Guatemala. The first line opened on 3 February 2007. The fleet consists of modern Volvo buses made by Ciferal in Brazil. The buses have fixed stops and partly run on dedicated lanes, avoiding other traffic. Both stops and vehicles are guarded by municipal police. Service began in 2007 with a route between the City Hall (Municipalidad) and a market place at Centra Sur (Southern Transfer Station). The second route, Eje Central, started operations on August 14, 2010. This route serves the central corridor between 6th and 7th Avenue of Zones 1, 4, and 9.

Buses run down the middle of the street, are separated from other traffic, and stop at stations approximately every kilometre. The stations are in the middle of the street, near areas of heavy pedestrian activity. Platforms are elevated so as to be level with the floor of the bus. Passengers may access the station via stairways, street crossings, or in some places tunnels. Elevator access for the disabled is not presently available. However, individuals requiring accessible entry can cross the street to access transportation through gates painted with a wheelchair logo. Roofs in the stations are covered with a transparent plastic covering.

The buses are articulated Brazilian-made vehicles manufactured by Volvo and can carry approximately 100 passengers, including standing passengers.

Security is provided by Guatemala City's transit police, with officers in fluorescent yellow vests deployed at most stations on the route. Sometimes security personnel ride on the Transmetro.

History

In January 1999, mayor Fritz García Gallont proposed implementing the Transmetro BRT project. However, it would not be until January 2004 when then mayor Álvaro Arzú confirmed that he had considered the Transmetro as a solution to alleviate congestion in the city. By June of the same year, city council said the first phase would be completed by the end of the year. However, several construction delays would push back its completion date from late 2006 to early 2007. The opening date was pushed to February 2007 when phase one, named "Eje Sur" (South line), began revenue service in the city. When the buses started to operate on the southern line, regional buses or "chicken buses" were banned from entering the city from the south. The change effectively made travelling the CA1 much faster compared before the line began to work.

After a successful 3-years of operation on the initial line, a second line opened in August of 2010, named "Eje central" also known as "Corredor Central" (Central line, or also known as Central corridor). This second phase coincided with the revitalization project of 6th Avenue in the historic downtown, and received support from private sector developers.

A number of lines would be opened without the dedicated right of way, between 2014 and 2016. "Centro Historico" which operates in the Historic centre was the first of these new lines to open in 2014. The "Eje Nor-oriente" line began operation in 2014 to serve Zone 18 from the Atlantida neighbourhood and the Downtown core. At the same time, construction of stations was ongoing for the new line "Eje Norte". This line opened in April of 2015 and was later renamed line 6 after the Zone in which it terminates from the downtown core. In January of 2016 a new short line named "Hipodromo" opened to serve the Hipodromo neighbourhood and the downtown core. This line would also serve as a sister line to "Eje Central", and introduced express services to the UMG university campus.

Later in 2016, all lines were renamed after the zones they operate in or serve. Eje Sur was renamed Line 12 as it mainly operates in zone 12, Corredor Central was renamed Line 13 as it connects Zone 13 with the Downtown Core, Centro Historico was renamed Line 1 as it serves Zone 1 Downtown, Eje Norte was renamed Line 6 as it terminates in Zone 6, Eje Nor-oriente was renamed Line 18 as it terminates in Zone 18, and Hipodromo was renamed Line 2 as it serves Zone 2.

In 2017 a new line, named "Line 21" began operating as a pilot project to improve transportation to and from the USAC University campus. Although it was a temporary line, it was marked on the system map as the pink line.

2019 saw the opening of "Line 7", even though some stations were still under construction. Line 21 was made permanent at this time, after proving to be popular as a connection to Trebol station. It would not be until 2020 when all Line 7 stations are open to the public. At the same time, the new mayor announced plans to phase out cash-fares. This process would be completed in 2021 with the introduction of a new payment card named "Tarjeta Ciudadana" which became the default payment method, meaning cash payments were no longer accepted.

In 2023 several service changes were made to the network, including the official removal of all direct interchanges, with the exception of those on lines 6 & 18 and lines 1 & 2, as well as the addition of new stations on Lines 1, 2, 12, 13, and 18, and the discontinuing of line 21.

Transmetro bus entering a station

Fare payments

When the Transmetro first opened, it accepted only coins, as the fare was set at Q1.00. After the national government began service of the Transurbano, a local bus service similar to the ones in North American cities, it also began to accept the SIGA smart card which had to be tapped to a reader. Passengers must pay the fare each time they enter the Transmetro, which means a two-way trip costs Q2.00, regardless of how far one goes. In November 2015, payments by the SIGA smart card were no longer accepted because of a multitude of problems and disagreements.

A shift to contactless payment options was announced in early 2020. However, implementation of new fare gates, including accessible ones, was only completed at some stations on line 12 and 13. The modernization project, also included support for the SIGA smart card, which had been accepted until 2015. Additionally, the new gates would also feature support for NFC payments, as well as debit and credit cards. The gates received public support due to the COVID-19 pandemic, which discouraged many from the use of cash payments to reduce the risk of transmission.

In early February 2021, payment by coins was no longer accepted, and payment by the new Tarjeta Ciudadana (Citizen Card) became the default payment method. The card can be acquired at stations along line 12, line 13, and convenience stores that have been allowed to sell it across the city. After purchasing the card at a cost of GTQ.20.00, users will receive 5 free rides and can register their name on to it using a system similar to cards such as the SUICA card in Japan. As an additional incentive for riders to purchase the card, the card offers 4 free rides daily for users with a disability. Along with the introduction of the new payment system, fares remained the same for the existing lines but increased for "Rutas Express," regional express services between Mixco and Guatemala City, to GTQ2.00.

Routes

Map of Transmetro Network

Line 12 (Centra Sur)

Transmetro bus operating on Line 12

Line 12 starts from Zone 1 in Guatemala City, it runs through the Civic Centre, Bolivar Avenue, Trebol Station, Raul Aguilar Batres Way, and finally terminating at Centra Sur in Zone 12 of neighbouring Villa Nueva city. The line was certified as "Gold" under the BRT Standards in 2014. In the 2023 service update, all direct transfers were removed, meaning passengers traveling on the line can only connect to other lines by walking a short distance to nearby stations. Additionally, several stations in Zone 1 were closed, while Santa Cecilia station was added.

Branches

Route Destinations
L12 Paradas Continuas (local): Centra Sur / Plaza Barrios
L12 D Directo (express): Centra Sur to Trebol / Express: Trebol to Centra Sur.
L12 D Directo (express): Centra Sur to Plaza Amate via Trebol / Plaza Amate to Centra Sur via Trebol

(Rush hours only)

Stations

Connecting Lines Station name
L12 Centra Sur
L12 D
L12 D
L12 Monte Maria
L12 Javier
L12 Las Carchas
L12 El Carmen
L12 Reformita
L12 Mariscal
L12 Trebol
L12 D
L12 D
L12 Santa Cecilia
L12 Bolivar
L12 Don Bosco
L12 Plaza Municipal
L12 Plaza Barrios
L12 Plaza el Amate
L12 D
L12 Don Bosco
L12 Bolivar

Line 13 (Corredor Central)

Transmetro operating on Line 13

The second line to be opened, Corridor Central or Eje Central, runs through zones 4, 9, and 13 of Guatemala City. The buses are similar to the ones on Line 12, except for the Bi-articulated buses. The change in bus types was done to allow the line to travel through the historic centre as the streets are narrower compared to those of the CA1.

Another interesting difference between Line 12 and Line 13 is that, when Line 13 was still a proposal, the developer promised to revitalize the areas where the Line would eventually operate. This revitalization included new monuments, better sidewalks, improvement of street vendor spaces, and others.

Line 13 connects with Line 12 at "Plaza Barrios" and "El Calvario", creating seamless connections to the downtown and the southern areas of the city. Stations on this line are equipped with accessibility features such as braille that tells users the name of the stations and the connecting lines.

This line, as mentioned earlier, runs through the historic downtown, this means that during its journey it will pass by popular landmarks of the city such as the Torre del Reformador, the Acueducto de Pinula, the Bank of Guatemala, Civic Centre, and 6th Avenue, a popular pedestrian-only section of the city. The line was certified as "Silver" under the BRT Standards in 2014. In 2022, Line 13's Hangares Station became an interchange station with the inauguration of the TransPinula service. In the 2023 service update, Line 13 had its termini changed to Tipografia in the north and Hangares in the south after a number of stations closed, south of Plaza Argentina. Fuerza Aerea station was opened and all direct transfers were removed.

Branches

Route Destinations
L13 Tipografia / Hangares

Stations

Connecting Lines Station Name
L13 Tipografia
L13 El Calvario
L13 4 Grados Sur
L13 Exposicion
L13 Terminal
L13 Industria
L13 Tivoli
L13 Montufar
L13 Acueducto
L13 Fuerza Aerea
TP1
(TransPinula)
Hangares
TP2
(TransPinula)
L13
L13 Argentina Plaza
L13 Los Arcos
L13 Plaza España
L13 IGSS Zona 9
L13 Seis 26
L13 Torre del Reformador
L13 Plaza of the Republic
L13 Banco de Guatemala

Line 1 (Centro Historico)

L1 Transmetro departing Tipografia Station.

Line 1 works in mainly in Zone 1 of Guatemala's Downtown. This line was built soon after Line 13 began operations. The main goal of this line was to make the historic centre more accessible through safe and reliable public transportation. This line travels from 3rd Street in Zone 1, towards 18th Street in Zone 1, passing through 5th Street and 8th Street. This line started service on December 19, 2012.

In the 2023 service update, its southern terminus was changed from Tipografia Station to Centro Civico, and a new Sur 2 station was opened.

Branches

Route Destinations
L1 San Sebastian / Centro Civico

Stations

Connecting Lines Station Name
L1 Gomez Carrillo
L1 San Agustin
L1 Parque Centenario
L1 San Sebastian
L2
L1 Mercado Central
L1 Correos
L1 Beatas de Belen
L1 Paseo de las Letras
L1 Centro Civico
L1 Sur 2

Line 2 (Hipodromo)

Line 2 was another line that had some private sector support, the goal was to increase ease of travel between the Hipodromo district and the historic district. The colour for this route is similar to the one for Line 1, as they serve very similar areas. Line 2 also has an express service to provide direct connections between Zone 1, and the UMG university campus. The express service does not serve any other stations. In the 2023 service update, the express service was removed entirely, ending service to the UMG university campus. In place of the express service, San Jose de la Montaña station was opened near the campus.

Branches

Route Destinations
L2 Hipodromo del Norte / San Sebastian

Stations

Connecting Lines Station Name
L2 San Sebastian
L1
L2 Simeon Cañas
L2 Hipodromo del Norte
L2 San Jose de la Montaña
L2 Jocotenango

Line 6 (Norte)

L6 or Eje Norte, runs from 18th Street in Zone 1 to Cementos Progreso Stadium in Guatemala's Zone 6, on its journey, it passes by the popular Colon Park (Parque Colon). Its stations began construction in October 2014 and the route was fully functional by April 25 of 2015. A trip from one end to the other takes an average of 50 minutes.

Branches

Route Destinations
L6 Proyectos / FEGUA

Stations

Connecting Lines Station name
L6 FEGUA
L18
L6 Colon
L18
L6 Cerro del Carmen (Northbound)
L18
L6 Parroquia
L6 IGSS Zona 6
L6 Centro Zona 6
L6 Academia
L6 Cipresales (Northbound)
L6 Proyectos 4-4 (Northbound)
L6 Proyectos
L6 Proyectos 4-4 (Southbound)
L6 Cipresales (Southbound)
L6 Quintanal
L6 Corpus Christi
L6 Jose Marti
L6 Cerro del Carmen (Southbound)
L6 Santa Teresa
L6 Capuchinas
L18

Line 18 (Nor-oriente)

Centra Atlantida station. Northern terminus for Line 18 (local).

As its name in Spanish describes, this line travels to the North West corner of the city. Departing from Plaza Barrios-FEGUA Station at 18th Street in Zone 1, ti travels through very important, high traffic areas and sites of interest like Colon Park. This line began operating on April 25, 2014, and continues to be under construction specially in the northern segment of the route to improve road conditions and exclusive traffic lane. This line also has an express service which bypasses most stations and travels directly to Paraiso Station, stopping at San Rafael Station on the way. Geographically, Paraiso is further than Atlantida, making it the northernmost station in the system. In early 2020, Transmetro completed the newest terminal station at Atlantida, renaming the terminal to "Centra Atlantida". This new terminal also provides direct transfers to local Transurbano Routes in the 300 Series. In the 2023 service update, the express service was replaced with all-day local service, stopping at Centra Atlantida along the way. Additionally, FEGUA and Plaza Barrios were no longer noted as interchange stations, despite a walking connection remaining available to Line 12.

Branches

Route Destinations
L18 Centra Atlantida / FEGUA
L18S Centra Atlantida / San Rafael

Stations

Connecting Lines Station name
L18 FEGUA
L6
L18 Santa Clara
L6 Colon
L18
L6 La Merced
L18
L6 Cerro del Carmen (Northbound)
L18
L18 San Marin (Northbound)
L18 Victorias (Northbound)
L18 Portales
L18 Centra Atlantida (formerly Atlantida)
L18S
L18S San Rafael
L18S Paraiso
L18S San Rafael
L18S Centra Atlantida (formerly Atlantida)
L18
L18 Victorias (Southbound)
L18 San Martin (Southbound)
L6 Capuchinas
L18

Line 7

Archivo General Station for Line 7.

Line 7 began service in late 2019. The is intended to cover more suburban service, as well as provide more direct access to the USAC university campus. The line travels between Colon Station in Zone 1, through Zone 7, Zone 11, and terminates at the new USAC Periferico Station. Along the way, it makes direct transfers to Line 6 and 18, while also providing walking connections to Line 1 and 12. In the 2023 service update the line's termini were changed, and all direct transfers were removed, meaning passengers traveling on the line can only transfer by walking to a nearby station.

Branches

Route Detinations
L7 La Merced / USAC Periferico

Stations

Connecting Lines Station Name
L7 La Merced
L7 Cruz Roja
L7 Archivo General
L7 Santuario de Guadalupe
L7 Incienso
L7 Bethania
L7 4 de Febrero
L7 Villa Linda
L7 Ciudad de Plata II
L7 San Juan
L7 Roosevelt
L7 San Jorge
L7 Cejusa
L7 Rodolfo Robles
L7 Granai
L7 USAC Periferico
Same stations northbound to Incienso
L7 San Juan de Dios
L7 Pasaje Aycinena

Route 5

Line 5 was announced to be under development by the Municipality of Guatemala in March 2021. This line was slated to use a different rolling stock from the standard Marcopolo BRT, instead using a set of city-style buses which were to be 100% electric. While original design of this line was to provide a connection for West-end residents to Centra Atlantida station and Line 18, the routing was changed to operate entirely within Zone 5 through using Diagonal 14 for most of its route. The line started operations and was branded as being "operated by TUBus", in May of 2024. The line uses Diesel buses also used by TUBus routes but makes less frequent stops akin to the BRT service of Transmetro lines. Transfers to Line 6, 18, and 13 are only possibly by walking to the adjacent stations of Colon for lines 6 and 18, and Banco de Guatemala for line 13.

Branches

Route Destinations
R5 Parque Colón/Penitenciaría

Stations

Connecting Lines Station Name
R5 Parque Colón
R5 Matamoros
R5 Cipreses
R5 Jardines de La Asunción
R5 Arrivillaga
R5 Vivibien
R5 Mercado La Palmita
R5 Palacio De Los Deportes
R5 Penitenciaría
R5 Palacio De Los Deportes
R5 La Palmita
R5 Parque Navidad
R5 Arrivillaga
R5 Jardines de La Asunción
R5 Cipreses
R5 Matamoros



Proposed extensions

Line 17

Line 17, along with Line 5, was announced to be under development by the Municipality of Guatemala in March 2021. This line would use a different rolling stock from the standard Marcopolo BRT, instead using a set of city-style buses which are 100% electric. The goal of the line was to provide a connection for North-west and West-end residents to the Centra Atlantida station and Line 18. The line would also intersect with some Transurbano Routes and was expected to share some stations. This project was put on hold as the city moved forward with Line 15 instead. Since the announcement of TuBus operations by the city, this previously proposed line and its alignment will now be used for the route traveling between Centra Atlantida and Lomas del Norte in Zone 17.

Line 15

Line 15 was announced to be under development by the Municipality of Guatemala in July 2021 The project is to be launched alongside Line 5, leaving the previously announced Line 17 on hold. Line 15 will be 13.5 km in length, feature 14 stations, and connect with Line 13.

TuBus

TuBus was unveiled in March 2023 as part of the 16th anniversary conmemoration of Transmetro operations. The system is set to serve as an urban bus system, like the existing Transurbano, however, it will be operated entirely by the Guatemala municipality instead of SIGA. The system will also take over previously proposed Transmetro routes in Zone 17, as well as new alignments serving connecting to existing Transmetro routes.

Discontinued Lines

Line 21

Line 21 started as a pilot project to measure sustainability, and conduct a user needs assessment for service to the USAC university campus, in the southern end of the city. The project began as an Express service between the temporary Trebolito Station, which was close to the Trebol Station, and a temporary Station at the municipal office in Zone 21. The service become a permanent line which provides easier access to the university campus from Line 12. In 2019, the service was complemented by the opening of the Line 7 service which provides students with options for westbound service. The line was named after its southern terminus, located in Zone 21. In the 2023 service update, Line 21 was discontinued in its entirety.

Branches

Route Destinations
L21 Trebol / Nimajuyu

Stations

Connecting Lines Station Name
L21 Trebol
L12
L12 D
L12 D
L21 USAC Petapa
L21 Nimajuyu (formerly Alcaldia Auxiliar Z.21)

References

  1. "Implementan nomenclatura Braile en Paseo La Sexta y el Corridor Central del Transmetro". elPeriodico de Guatemala. February 4, 2011.
  2. ^ "Transmetro empieza a circular para la zona 6 – Prensa Libre" (in Spanish). 25 April 2015. Retrieved 2019-05-25.
  3. ":::... Tú eres la Ciudad - Municipalidad de la Ciudad de Guatemala, Cumple ...:::". 2014-10-03. Archived from the original on 2014-10-03. Retrieved 2019-05-25.
  4. ^ Guatemala, Informatica Municipalidad de (17 December 2020). "Mejor movilidad para todos los vecinos con la Tarjeta Ciudadana". www.muniguate.com (in Mexican Spanish). Retrieved 2021-02-23.
  5. ^ "ENERO 2023 MAPA DE LINEAS DE TRANSMETRO" (PDF) (in European Spanish). 20 February 2023.
  6. "Comuna habilita Transmetro | Siglo21.com.gt". 2012-12-21. Archived from the original on 2012-12-21. Retrieved 2019-05-25.
  7. "Transmetro utilizará sistema de tarjeta prepago, anuncia municipalidad capitalina – Prensa Libre" (in Spanish). 24 February 2020. Retrieved 2020-09-25.
  8. "Obtén tu Tarjeta Ciudadana en tan solo dos pasos". Aprende Guatemala.com (in Spanish). 2020-12-21. Retrieved 2021-02-23.
  9. ^ (February 06, 2022) Retrieved from https://en.wikipedia.org/BRT_Standard#Scored_BRT_corridors
  10. "Transpinula pone a funcionar sus primeras dos rutas". Retrieved 2023-04-02.
  11. "Habilitan servicio de Transmetro en Centro Histórico | Siglo21.com.gt". 2012-12-21. Archived from the original on 2012-12-21. Retrieved 2019-05-26.
  12. "El Transporte que Revoluciono Centroamerica" (PDF). 2014-11-29. Archived from the original (PDF) on 2014-11-29. Retrieved 2019-05-26.
  13. Redacción (18 February 2020). "Estación de Transmetro en la Atlántida atenderá hasta 60 mil personas cada día". centranews.com.gt (in European Spanish). Retrieved 2020-08-18.
  14. "Inauguran primera fase de Línea 7 del Transmetro que recorrerá de la Usac a la zona 1 – Prensa Libre" (in Spanish). 30 September 2019. Retrieved 2020-08-18.
  15. ^ Transmetro sigue innovando, 20 March 2021, archived from the original on 2021-12-15, retrieved 2021-04-06
  16. Dirección de Movilidad Urban Retrieved March 26, 2023
  17. Retrieved August 25, 2024
  18. ^ BuenaGente March 2023 Retrieved March 26, 2023
  19. Transmetro Guatemala facebook. Retrieved from https://www.facebook.com/transmetroguatemala/posts/4700105710018102 Retrieved 2021-07-08.
  20. ""Tu Bus": El nuevo sistema de transporte que llegará en mayo a la ciudad".
  21. "Servicio de Transmetro empieza a funcionar en la zona 21 este sábado – Prensa Libre" (in Spanish). 18 October 2017. Retrieved 2020-08-18.

External links

Guatemala City
Transport
Landmarks
Education
Lycée Français Jules Verne is nearby (Fraijanes) and serves area French families.
Categories: