This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Tufts Cove Generating Station" – news · newspapers · books · scholar · JSTOR (December 2009) (Learn how and when to remove this message) |
Tufts Cove Generating Station | |
---|---|
The Tufts Cove Generating Station viewed from the west | |
Tufts Cove Generating Station, Nova Scotia | |
Country | Canada |
Location | Tufts Cove, Nova Scotia |
Coordinates | 44°40′36″N 63°35′46″W / 44.6766°N 63.5960°W / 44.6766; -63.5960 |
Status | Operational |
Commission date | 1965 |
Owner | Nova Scotia Power |
Thermal power station | |
Primary fuel | Fuel oil (converted from Coal) |
Secondary fuel | Natural gas |
Power generation | |
Nameplate capacity | 500 MW |
External links | |
Commons | Related media on Commons |
[edit on Wikidata] |
Tufts Cove Generating Station is a Canadian electrical generating station located in the Dartmouth neighbourhood of Tufts Cove in Nova Scotia's Halifax Regional Municipality.
A thermal generating station, Tufts Cove was constructed in 1965 by Nova Scotia Light and Power Company, Limited, requiring the demolition of part of this historic neighbourhood to locate the facility on the eastern shore of Halifax Harbour. The plant replaced the Water Street Generating Station that had been opened by the Halifax Electric Tramway in 1902. Operated by Nova Scotia Power, a subsidiary of Emera Incorporated, the Tufts Cove Generating Station has a generating capacity of 415 megawatts. Tufts Cove #1 was installed in 1965 with dual fuel capability to burn No. 6 heavy fuel oil and coal mined by the Cape Breton Development Corporation. In 1972 Tufts Cove #1 was converted to fire only oil at the same time as Tufts Cove #2 (oil only) was commissioned. Tufts Cove #3 (also oil only) was commissioned in 1976. The sole reliance on fuel oil proved to be an unfortunate decision in the light of the record increase in oil prices throughout the 1970s. The plant property occupies almost 1,000 m (3,300 ft) of shoreline. A docking facility was constructed in 1976-1977 as well as a storage tank. The plant features three distinctive 152 m (500 ft) chimneys, one for each boiler which are tied with those at Lingan Generating Station and Trenton Generating Station as the tallest freestanding structures in Nova Scotia. In 2000, the Tufts Cove plant was re-fitted to burn either oil or natural gas.
Emissions from the station in the form of particulates are a frequent source of pollution complaints in the neighbourhood and region, and in the 1990s, NSPI funded a $32 million project to install filters to limit the escape of pollutants.
In 2003 and 2004, two 47.3 MW simple cycle natural gas fueled combustion turbine plants were commissioned. Due to low prices in recent years, the entire plant has run largely on natural gas, which has dramatically decreased its emissions profile. A sixth generating unit, a combined-cycle generator was completed in 2011. It uses the heat exhaust of the plant's two combustion turbines and additional natural gas duct firing to generate 50 MW of electricity.
The Halifax lateral of the Maritimes and Northeast Pipeline terminates on the property.
On February 14, 2021 5 workers were sent to hospital after a fire broke out in a potash container.
Cultural reference
The stacks of the Tufts Cove Generating Station are often visible in the background of outdoor location shots in the Canadian TV comedy series Trailer Park Boys.
See also
References
- Nova Scotia Light and Power Annual Report, 1965
- "Environment and Climate Change Canada - NPRI Data Search".
- "Tufts Cove Power Plant Chimney 1, Halifax". SkyscraperPage.com. Retrieved 2022-05-02.
- "Halifax fire, hazmat unit respond to fire at electrical generating station - Halifax | Globalnews.ca".
This article about a building or structure in Nova Scotia is a stub. You can help Misplaced Pages by expanding it. |