USNS Fall River in Hambantota on 7 March 2017 | |
History | |
---|---|
United States | |
Name | Fall River |
Namesake | Fall River |
Operator | Military Sealift Command |
Awarded | 12 October 2010 |
Builder | Austal USA |
Laid down | 20 May 2013 |
Launched | 16 January 2014 |
Sponsored by | Diane Bemus Patrick |
Christened | 11 January 2014 |
In service | 15 September 2014 |
Reclassified | T-EPF-4, 2015 |
Identification |
|
Motto | Fast, Fearless, Faithful |
Status | Active |
General characteristics | |
Class and type | Spearhead class Expeditionary Fast Transport |
Length | 103.0 m (337 ft 11 in) |
Beam | 28.5 m (93 ft 6 in) |
Draft | 3.83 m (12 ft 7 in) |
Propulsion |
|
Speed | 43 knots (80 km/h; 49 mph) |
Troops | 312 |
Crew | 41 |
Aircraft carried | Medium helicopter |
Aviation facilities | Helipad |
USNS Fall River (JHSV-4/T-EPF-4) is the fourth Spearhead-class expeditionary fast transport, which is operated by the United States Navy's Military Sealift Command (MSC). Fall River was built by Austal USA in Mobile, Alabama.
Capabilities
The EPF will be able to transport US Army and US Marine Corps company-sized units with their vehicles, or reconfigure to become a troop transport for an infantry battalion.
It will have a flight deck for helicopter operations and a loading ramp that will allow vehicles to quickly drive on and off the ship. The ramp will be suitable for the types of austere piers and quay walls common in developing countries. EPF will have a shallow draft (under 15 feet (4.6 m)).
Construction and career
On 23 March 2010, Secretary of the Navy Ray Mabus announced in Fall River, Massachusetts that the fourth Expeditionary Fast Transport will be named USNS Fall River. Because the ship will be operated by the Military Sealift Command and not the United States Navy itself, it will carry the USNS prefix instead of USS.
The ship was christened on 11 January 2014 by First Lady of Massachusetts, Diane Bemus Patrick, at Austal USA's Shipyard in Mobile, Alabama. The ship was launched seven days later on 16 January. Fall River completed acceptance trials on 25 July 2014. Following delivery and Final Contract Trials (FCT) later in the year, Fall River was accepted into MSC service on 15 September 2014.
References
- ^ "Fall River". Naval Vessel Register. Retrieved 25 August 2016.
- ^ Joint High Speed Vessel (JHSV), USN. Retrieved 12 March 2010.
- Joint High Speed Vessel (JHSV), globalsecurity.org. Retrieved 12 March 2010.
- Welker, Grant; GateHouse News Service (25 March 2010). "Navy names ship after Fall River in honor of city's service". Herald News. Fall River, Massachusetts. Retrieved 28 March 2010.
- SecNav: 4th JHSV will be Fall River (25 March 2010). "SecNav: 4th JHSV will be Fall River". Military Daily News. Archived from the original on 14 July 2011. Retrieved 28 March 2010.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - Ewing, Philip (25 March 2010). "SecNav: 4th JSHV will be Fall River – Navy News, news from Iraq". Navy Times. Retrieved 28 March 2010.
- Bowden, Michelle; austalusa.com (11 January 2014). "USNS FALL RIVER (JHSV 4) CHRISTENED - ONE OF SEVEN NAVY VESSELS CURRENTLY UNDER CONSTRUCTION AT AUSTAL USA". Austal USA Website. Mobile, Alabama. Archived from the original on 22 February 2014. Retrieved 11 January 2014.
- Bowden, Michelle; austalusa.com (16 January 2014). "AUSTAL LAUNCHES USNS FALL RIVER (JHSV 4). FIRST OF FOUR NAVY SHIPS TO BE LAUNCHED AT AUSTAL IN 2014". Austal USA Website. Mobile, Alabama. Archived from the original on 8 February 2014. Retrieved 17 January 2014.
- USNS Fall River (JHSV 4) Completes Acceptance Trials - Seapowermagazine.org, 1 August 2014
- Fourth Joint High Speed Vessel Delivers - News.USNI.org, 15 September 2014
External links
Media related to IMO 9677521 at Wikimedia Commons
Spearhead-class Expeditionary Fast Transport | |
---|---|
Flight I | |
Flight II | |
High Speed Vessels of the United States Navy | |
---|---|