Misplaced Pages

USS Napa (1864)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Torpedo boat of the United States Navy For other ships with the same name, see USS Napa and USS Nemesis.
The USS Napa and the USS Monadnock from an engraving published in "The Soldier in Our Civil War".The USS Napa and the USS Monadnock from an engraving published in "The Soldier in Our Civil War".
History
United States
NamesakeNapa County, California
OrderedApril 1863
Launched26 November 1864
CommissionedNever
FateBroken up, 1875
General characteristics
Class and typeCasco-class light-draft monitor
Displacement1,175 tons
Length225 ft (69 m)
Beam45 ft (14 m)
Draft9 ft (2.7 m)
PropulsionScrew Steamer
Speed9 knots (17 km/h)
Complement60 officers and enlisted
Armament1 × 11 in Dahlgren Smoothbore gun, 1 × spar torpedo
Armor10 in pilothouse, 3 in hull, 3 in deck

USS Napa was a Casco class twin-screw light draft monitor built during the American Civil War for operation in the shallow inland waters of the Confederacy. These warships sacrificed armor plate for a shallow draft and were fitted with a ballast compartment designed to lower them in the water during battle.

Construction

The single-turreted Napa was built by the Harlan & Hollingsworth Co., Wilmington, DE, and launched 26 November 1864. Though the original designs for the Casco-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban B. Stimers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time that the plans were put before the Monitor Board in New York City, Ericsson and Stimers had a poor relationship, and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Stimers had failed to compensate for the armor his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only 3 inches (76 mm). Stimers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by nearly two feet and the first few completed vessels had their turrets removed and a single pivot-mount 11 inch Dahlgren cannon mounted. These same few vessels had a retractable spar torpedo added as well.

Torpedo vessel conversion

As a result, Napa was converted to a torpedo vessel, 25 June 1864 and turned over to the government upon her completion 4 May 1865. Never commissioned, she was laid up at League Island, PA, until 1875 when she was broken up by John Roach at New York. While at League Island, her name was changed twice: to Nemesis, 15 June 1869; and back to Napa, 10 August 1869.

References

Public Domain This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

Casco-class monitors
List of monitors of the United States Navy
Categories: