Misplaced Pages

Union Hospital station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Railway station in Macau
Union Hospital
協和醫院
Entrance and exit signs of Union Hospital station.
General information
LocationEstrada do Istmo, Cotai, Macau
Line(s)TaipaSeac Pai Van
Platforms2 side platforms, 2 island platforms
Construction
Structure typeElevated
Other information
Station code ST18A 
History
OpenedTaipa line: 1 September 2024 (2024-09)
Seac Pai Van line: 1 November 2024 (2024-11)
Previous namesIsland Hospital
Services
Preceding station Logo of Macau Light Rapid Transit Macau Light Rapid Transit Following station
Lotustowards Barra Taipa line East Asian Gamestowards Taipa Ferry Terminal
Terminus Seac Pai Van line Seac Pai VanTerminus
Route map
(Up arrow Lotus)
Seac Pai Van Left arrow
(Down arrow East Asian Games)

Union Hospital station (Chinese: 協和醫院站, Portuguese: Estação Hospital Union) is the interchange station for the Taipa Line and the Seac Pai Van line of the Macau LRT, and also the terminal station for the Seac Pai Van line. It is located between the Rotunda Flor de Lótus in Cotai and Estrada do Istmo, connecting to the Macau Union Hospital. This station is an elevated station, with pathways for transferring between the Taipa Line and the Seac Pai Van line.

Layout

Taipa Line Platform

2/F Side platform; doors open on the left
Platform Floor Taipa to Taipa Ferry Terminal (East Asian Games)
Platform Floor Taipa to Barra (Lotus)
Side platform; doors open on the left
1/F Transfer Hall Seac Pai Van transfer corridor, to exits and entrances
Ground Floor Exits and entrances

Seac Pai Van Line Platform

2/F Side platform; doors open on the left
Platform Floor Seac Pai Van to Seac Pai Van (Terminus)
Island platform, doors will open on the left or right
Platform Floor Seac Pai Van to Seac Pai Van (Terminus)
Side platform; doors open on the left
1/F Tickets Level Customer service, ticket machine, Taipa transfer corridor, to exits and entrances
Ground Floor Exits and entrances

References

  1. "公告「C390B-輕軌石排灣線主體建造工程」公開招標" (in Traditional Chinese). 建設發展辦公室. Archived from the original on 2020-07-29. Retrieved 2020-07-29.

22°08′20″N 113°33′47″E / 22.138781°N 113.563169°E / 22.138781; 113.563169

External links

Macau Light Rapid Transit
Taipa line
Seac Pai Van line
Hengqin line
East line
  • Taipa Ferry Terminal
  • Zone E1 of New Area
  • South Zone A of New Area
  • Central Zone A of New Area
  • North Zone A of New Area
  • Pearl of the Orient
  • Border Gate
Italicised stations not yet operating
Categories: