(Redirected from Valle 1 and Valle 2) Two adjacent twin 50 MW solar thermal power plants
Valle Solar Power Station
Aerial photographs of the Valle Solar Power Station.Valle Solar Power Station (Valle 1 and Valle 2)
Official nameValle 1 y Valle 2 (Spanish)
CountrySpain
Locationnear San José del Valle, Cádiz
Coordinates36°40′N 5°50′W / 36.66°N 5.84°W / 36.66; -5.84
StatusOperational
Construction beganDecember 2009
Commission dateJanuary 2012
Construction cost€540 million (US$700 M)
OwnerTorresol Energy
Solar farm
TypeCSP
CSP technologyParabolic trough
Collectors2 × 624
Site resource2,097 kWh/m/yr
Site area4.6 km (2 sq mi)
Power generation
Units operational2
Nameplate capacity99.8 MW
Capacity factor37%
Annual net output340 GW·h
Storage capacity749 MW·he
External links
Websitewww.torresolenergy.com/TORRESOL/valle1-valle2-plants/en
[edit on Wikidata]

The Valle Solar Power Station is a two adjacent twin 50 MW solar thermal power plants (Arcosol-50, also Valle 1 and Termesol-50, also Valle 2, was Vallesol-2) in San José del Valle, Cádiz, Spain, near the border with the Arcos de la Frontera (north) and the Jerez de la Frontera (west) municipalities, in the comarca of the Campiña de Jerez (the Jerez countryside), a county with no administrative role.

The station generates power using parabolic trough technology. It became operational in January 2012. The Valle plant is owned by Torresol Energy, a joint venture between SENER (60%) and the Abu Dhabi Future Energy Company (40%). It was built by SENER between December 2009 and December 2011, at a cost of €540 million (US$700 million).

Construction on Valle 1 and Valle 2 began in December 2009 and was completed in December 2011. Roughly 4,500 workers dedicated over 2.7 million labor hours over the two years of construction until the plants were commissioned and connected to the Spanish national grid. Each 50 MWe has the capacity to supply 160 Gwh of safe, clean power per year, to supply 40,000 homes. Together they reduce CO2 emissions by 90,000 tons every year. Their molten salt storage system allows them to continue producing electricity even without solar radiation. In addition to providing a manageable source of clean power, they can also supply electricity to the power grid based on demand.

The power station consists of two adjacent plants, Valle 1 and Valle 2. Each one has a nameplate capacity of 50 MW, using SENER parabolic trough collectors creating solar fields of 510,120 square metres on a total surface area of 460 hectares (1,100 acres). Net electrical output for each section is expected to be 160 gigawatt-hours (GW·h) per year. Each plant will have a molten salt thermal storage system containing 28,500 tons of molten salt (60% sodium nitrate / 40% potassium nitrate), capable of storing enough heat to generate 750 MWh of electricity — enough to operate at full power for 7.5 hours without sunshine.

Valle 1 and Valle 2 use SENERtrough parabolic trough collector technology, which concentrates solar radiation into a central collector tube with circulating thermal oil. They also have high precision optical sensors which track the sun from east to west. The hot oil is used to vaporize water, which through expansion in a steam turbine, propels a power generator that sends power to the electrical grid.

See also

References

  1. ^ "Arcosol 50". SolarPACES. National Renewable Energy Laboratory (NREL), U.S. Dept. of Energy (DOE). 20 March 2017. Archived from the original on 4 December 2020. Retrieved 4 December 2020.
  2. ^ "Termesol 50". SolarPACES. National Renewable Energy Laboratory (NREL), U.S. Dept. of Energy (DOE). 20 March 2017. Archived from the original on 4 December 2020. Retrieved 4 December 2020.
  3. Planta de Generación Solar Termoeléctrica de 50 Mwe., Vallesol-2
  4. Documento de Síntesis del Estudio de Impacto Ambiental "Planta de generación solar termoeléctrica Vallesol 2"
  5. "Torresol Energy Constructing CSP Stations". Renewable Energy World. 17 June 2009. Retrieved 6 February 2012.
  6. "Torresol's Valle 1 & 2: Single tank thermal storage deployed". Archived from the original on 2014-11-02. Retrieved 2014-11-01.
  7. "Torresol Energy Launches Commercial Operations of Twin Solar Thermal Plants in Spain" (Press release). Torresol. 18 January 2012. Archived from the original on 29 January 2012. Retrieved 6 February 2012.
  8. "Torresol Energy Launches Commercial Operations of Twin Solar Thermal Plants in Spain". Archived from the original on 2014-11-02. Retrieved 2014-11-01.

External links

Solar energy in the European Union
Solar power by country
Solar thermal power stations
Photovoltaic power stations
Energy in Spain
Nuclear plants
Active
Cancelled
Closed
Wind farms
Fossil fuels
Solar power
Categories: