This article needs additional citations for verification. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "Vuhlehirska Power Station" – news · newspapers · books · scholar · JSTOR (March 2013) (Learn how and when to remove this message) |
Vuhlehirska power station | |
---|---|
Official name | Вуглегірська ТЕС |
Country | Ukraine |
Location | Svitlodarske, Donetsk Oblast |
Coordinates | 48°27′52″N 38°11′53″E / 48.46444°N 38.19806°E / 48.46444; 38.19806 |
Status | Operation suspended |
Commission date | 1972 |
Owner | Centrenergo |
Thermal power station | |
Primary fuel | Coal (4 power units) |
Secondary fuel | Natural gas |
Tertiary fuel | Mazut |
Power generation | |
Units operational | 7 |
Nameplate capacity | 3,600 MW |
External links | |
Website | Vuglegirska TPP |
Commons | Related media on Commons |
[edit on Wikidata] |
Vuhlehirska power station (also known as Vuhlehirska TES, Ukrainian: Вуглегірська ТЕС) is a fossil fueled thermal power station located in Svitlodarsk, Ukraine. It consists of 7 units with a total power output of 3,600 MW and was put in service between 1972 and 1977. The power station has 4 coal fired units which operate regularly as a base-load power source, and 3 gas fired boilers which are used as peaking units. The Vuhlehirska power station has a flue gas stack that is 320 meters tall (1050 feet), which is one of the tallest structures in Ukraine. Since August 1995 the power station is operated by Centrenergo. The power station has an outward appearance similar to that of the Zaporizhzhia thermal power station as they were both constructed in the early 1970s
History
On 29 March 2013, four power units of the station were destroyed as a result of a major fire in which one employee was killed, and eight injured workers were hospitalized.
According to information published in Compressor Tech magazine on 22 March 2022 during the Russian invasion of Ukraine, the pipeline was damaged by artillery shelling, but technicians were able to perform some light repairs on it. It was also reported that the war had disrupted its network in multiple spots.
On 26 July 2022, during an offensive in Eastern Ukraine, Russian, DNR and LNR forces took control over the power station completely.
See also
References
- (in Ukrainian) Oschadbank denied Centerenergo a loan to purchase fuel, Ukrayinska Pravda (17 August 2020)
- Углегорская ГРЭС // Советский энциклопедический словарь. редколл., гл. ред. А. М. Прохоров. 4-е изд. М., «Советская энциклопедия», 1986. стр.1376
- Vuglegirska TPP Archived 2016-01-15 at the Wayback Machine
- "One person killed, three injured in fire at Vuhlehirska Thermal Power Plant, says Emergencies Service". Interfax-Ukraine. 2013-03-29. Retrieved 2013-03-30.
- "Vuhlehirska TPP should be fully restored, says energy minister". Interfax-Ukraine. 2013-03-30. Retrieved 2013-03-30.
- "Russian invasion of Ukraine a gamechanger for European gas imports". compressortech2. 22 March 2022.
- Zinets, Natalia (28 July 2022). "Russia captures power station, redeploys troops toward southern Ukraine". Reuters. Retrieved 28 July 2022.
- "Russian forces take Vuhlehirska power station under total control". english.pravda.ru. 26 July 2022.
This article about a power station is a stub. You can help Misplaced Pages by expanding it. |
This article about a Ukrainian building or structure is a stub. You can help Misplaced Pages by expanding it. |