Misplaced Pages

Wiehltal bridge

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Motorway bridge in Germany
This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed.
Find sources: "Wiehltal bridge" – news · newspapers · books · scholar · JSTOR (November 2016) (Learn how and when to remove this message)
Wiehltal Bridge
Wiehltalbrücke
Coordinates50°58′29″N 7°29′25″E / 50.9747°N 7.4903°E / 50.9747; 7.4903
CarriesBundesautobahn A 4
CrossesRiver Wiehl
LocaleWeiershagen, Wiehl, North Rhine-Westphalia
Characteristics
Total length705 m
Width30.25 m
Height60 m
History
Construction end1971
Location

The Wiehltal Bridge is a highway bridge on the A 4 motorway between Cologne and Olpe over the Wiehltal valley at Engelskirchen (Oberbergischer Kreis), North Rhine-Westphalia, Germany.

Overview

The bridge is 30.25 m wide, 705 m long and has a bridge surface of 21,326 m. The highest point above ground is 60 m. It consists completely of a steelwork construction, whose rolling-element bearing rests on concrete pillars. In contrast to similar bridges, the roadways of both driving directions are carried by continuous elements. Construction of the bridge was completed in 1971.

Damage and closure

The burning remains of the tanker under the bridge

At 10:40 on 26 August 2004 a car collided with a tanker truck containing 32,000 liters of fuel on the Wiehltal Bridge. The guard rails were designed only to stop vehicles up to 13 tons and were unable to hold the truck, which fell 30 meters off the A 4 Autobahn and exploded. The truck driver was killed; the heat damage destroyed the load-bearing ability of the bridge and it had to be closed to traffic.

Provisional repairs were made in autumn 2004. Plans for a replacement bridge are expected to be formulated in the spring of 2005. Repairs are estimated at 32 million and replacement could cost up to €250 million, including the cost for disposing of the waste. This was by far the most expensive accident in the history of the Federal Republic of Germany.

Repair and reopening

The bridge was repaired and re-opened to traffic on 18 October 2007.

See also

External links

50°58′29″N 7°29′25″E / 50.97472°N 7.49028°E / 50.97472; 7.49028


Stub icon

This article about a North Rhine-Westphalian building or structure is a stub. You can help Misplaced Pages by expanding it.

Stub icon 1 Stub icon 2

This article about a bridge in Germany is a stub. You can help Misplaced Pages by expanding it.

Categories: