Xingye Donglu 兴业东路 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Platform | |||||||||||
Chinese name | |||||||||||
Simplified Chinese | 兴业东路站 | ||||||||||
Traditional Chinese | 興業東路站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | East Xingye Road (兴业东路), Shishan Nanhai District, Foshan, Guangdong China | ||||||||||
Coordinates | 23°05′33″N 113°01′22″E / 23.09245°N 113.022789°E / 23.09245; 113.022789 | ||||||||||
Operated by | Foshan Metro Operation Co., Ltd. | ||||||||||
Line(s) | Line 3 North section | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | F334 | ||||||||||
History | |||||||||||
Opened | 23 August 2024; 3 months ago (2024-08-23) | ||||||||||
Services | |||||||||||
| |||||||||||
Xingye Donglu station (simplified Chinese: 兴业东路站; traditional Chinese: 興業東路站; pinyin: Xīngyè Dōnglù Zhàn; Jyutping: Hingyip Dunglou Zaam) is a station on Line 3 of Foshan Metro, located in Foshan's Nanhai District. It opened on August 23, 2024.
History
When Line 3 was approved in 2012, this station was not included. In 2015, the planning of Line 3 was changed, and this station was added to the line, known then as Xingye Lu. In 2022 the station name was adjusted to Xingye Donglu.
The station officially started construction on December 17, 2016, completed the pouring of the first base plate on April 30, 2019, and the main structure was capped on April 27, 2021.
Station layout
The station has an island platform under East Xingye Road.
G | - | Exits A, C & D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 | - | Station Equipment |
L3 Platforms |
Platform 1 | 3 towards Foshan University (Kesheng Lu) |
Island platform, doors will open on the left | ||
Platform 2 | 3 towards Lianhe (Foshan West Railway Station) |
Exits
There are 3 entrances/exits, lettered A, C and D, which are located on the north and south sides of East Xingye Road.
Exit letter | Exit location | |
---|---|---|
A | Xingye Road | |
C | Xingye Road | |
D | Xingye Road |
References
- ^ 梁焯贤 (2019-12-28). "佛山地铁3号线、2号线一期站点详细位置公布!最新进展" [The detailed locations of Foshan Metro Line 3 and Line 2 Phase 1 stations have been announced! Latest progress]. Foshan News Network (in Simplified Chinese). Archived from the original on 2022-06-26. Retrieved 2024-08-22 – via Foshan Municipal People's Government.
- 李传智 (2024-08-20). "官宣!佛山地铁3号线在建段将于本周五开通" [Official announcement! The under-construction section of Foshan Metro Line 3 will open this Friday]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-08-20. Retrieved 2024-08-22.
- 刘佳伦 (2024-08-23). "佛山3号线开通首日,人气如何?南方+记者带你现场直击" [How popular is Foshan Line 3 on its first day of operation? Nanfang+ reporter takes you to the scene]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-08-23. Retrieved 2024-08-24.
- 李传智 (2013-06-07). "地铁三号线工程环评第二次公告发布:三号线将与7条地铁线换乘" [The second environmental impact assessment announcement for Metro Line 3 was released: Line 3 will transfer with 7 metro lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-25. Retrieved 2024-08-22 – via Sina Corporation.
- 李传智; 何超 (2015-07-22). "最长地铁线串起14条轨道线" [The longest subway line connects 14 rail lines]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2022-07-29. Retrieved 2024-08-21 – via Foshan Municipal People's Government.
- "【地铁3号线】荔村站、兴业路站施工,请注意绕行" [ Licun Station and Xingye Road Station are under construction, please take detours]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 2016-12-21. Archived from the original on 2022-07-29. Retrieved 2024-08-22 – via Official WeChat Account of Foshan Metro.
- "三号线|兴业路站首块底板顺利浇筑完成" [Line 3 - The first base slab of Xingye Road Station was successfully poured]. Foshan Railway Investment and Construction Group (in Simplified Chinese). 2019-04-30. Archived from the original on 2022-07-29. Retrieved 2024-08-22 – via Official WeChat Account of Foshan Metro.
- "三号线|实现第二十座车站主体结构封顶" [Line 3 - The main structure of the 20th station has been capped]. Official WeChat Account of Foshan Metro (in Simplified Chinese). 2019-12-26. Archived from the original on 2022-07-29. Retrieved 2024-08-22.
- "定了!佛山地铁3号线在建段8月23日开通运营,票价公布→" [It's settled! The under-construction section of Foshan Metro Line 3 will open on August 23, and the ticket prices will be announced →]. Zhujiang Times (in Simplified Chinese). 2024-08-20. Archived from the original on 2024-08-20. Retrieved 2024-08-22 – via Official NetEase account.
- "兴业东路". Foshan Metro (in Simplified Chinese). Foshan Metro.
External links
- Station information: 兴业东路