Reconstruction work on the Edinburgh-Galashiels-Tweedbank section of the railway is under way; {{As of|2014|alt=as of 2014}} this part of the line is scheduled to reopen on 6 September 2015.<ref>Network Rail Timetable, May 2015</ref><ref>{{cite web |url=http://www.transportscotland.gov.uk/project/borders-railway |title=Borders Railway |publisher=Transport Scotland |accessdate=2015-03-17 }}</ref> |
|
Reconstruction work on the Edinburgh-Galashiels-Tweedbank section of the railway is under way; {{As of|2014|alt=as of 2014}} this part of the line is scheduled to reopen on 6 September 2015.<ref>Network Rail Timetable, May 2015</ref><ref>{{cite web |url=http://www.transportscotland.gov.uk/project/borders-railway |title=Borders Railway |publisher=Transport Scotland |accessdate=2015-03-17 }}</ref> |
|
|
|
|
==Line characteristics== |
|
|
{{Unreferenced section|date=August 2014}} |
|
|
In its operational lifetime, the route was famous for its significant gradients and bleak moorland terrain, which made it arguably the most difficult line in the UK for ] crews to work over. From ], the climb started on the city outskirts, continued for several miles at a gradient of 1 in 80, with a summit at ] loop. It then descended at a similar rate to ], ] and ] before reaching ] and climbing for {{convert|12|mi|abbr=on}} at 1 in 80 through ] and ] to ]{{mdash}}the highest point on the line. After passing through ], the line descended at an unbroken 1 in 75 for over {{convert|8|mi|abbr=on}} through ] and Steele Road to ], after which came less-steep gradients into Carlisle. (Unfortunately, the map shows the line south of Hawick going by Ewesdale and Langholm ~ the direction that the unsuccessful Caledonian Railway route had planned.) |
|
|
|
|
|
==Historic exploration== |
|
|
{{refimprove section|date=August 2014}} |
|
|
Because the line was built by the North British Railway Company, it became part of the ] (LNER) at the ] in 1923. The two express trains from London traditionally ran via the ]'s ]; because the Midland became part of the ] (LMS) group, the daytime Waverley express and overnight ] trains were hauled by LMS locomotives to Carlisle, then by LNER locomotives to Edinburgh Waverley. |
|
|
|
|
|
The expresses were limited stop services; in the 1950s they travelled from Carlisle to Edinburgh in about two-and-a-half hours. Motive power was usually provided by a Gresley ] locomotive, a class unsuited to hill climbing. These locomotives had large ] and three ]; they were designed for long stretches at speeds above {{convert|80|mph|sigfig=2|abbr=on}} pulling heavy expresses. The Waverley express typically comprised eight coaches and the Waverley Route had a maximum speed of {{convert|70|mph|sigfig=2|abbr=on}}; many tight curves were limited to much lower speeds. On the climb from Newcastleton to Whitrope Summit, the train would slow to {{convert|30|mph|sigfig=1|abbr=on}} by Steele Road; the locomotive was worked flat out. |
|
|
|
|
|
Other passenger services{{mdash}}usually three per day{{mdash}}were also worked by A3s, although ] ]s were used regularly. There was a daily ] diagram between Edinburgh and Carlisle{{mdash}}a southbound, overnight freight service that returned with the early morning parcels train. ]s were used just before the line was ] to improve efficiency. Several local passenger services ran between Galashiels and Edinburgh{{mdash}}some via the Peebles loop{{mdash}}and between Hawick and Carlisle. These were commonly hauled by B1s, although V1 2-6-2 tank engines and D49 4-4-0s were occasionally used. After the end of the steam era, a variety of diesels{{mdash}}especially ] and ] Sulzer-engined diesels and ] Claytons on local stopping passenger services. Long-distance trains were often hauled by ] Peaks. |
|
|
|
|
|
] |
|
|
|
|
|
Freight workings were heavy and frequent, and were hauled by a multitude of classes of engines. The significant workings were pulled by ] ]s, ] ]s and A3s. V2s were used on the line for over 30 years. In the 1960s, once the short-lived ]s at Carlisle Kingmoor and Edinburgh Millerhill were opened, they worked hourly freight trains around the clock. Depending on the maximum speed of the freight working, a Carlisle to Edinburgh freight train could take between four and seven hours. There were also stopping freight trains from Hawick to Edinburgh and Hawick to Carlisle and back, each stopped to shunt at every station yard and took a full day to complete the return journey. These were usually hauled by ] ] locomotives and were later replaced with ]s. |
|
|
|
|
|
In the last years of its use, a daily ] (]) to ] freight train carried ] cars over the line on carflats. Because of the weight of the load, the service used a Gresley V2 and a ] ] locomotive, usually with the V2 on the front. |
|
|
|
|
|
|
==Line closure and beyond== |
|
==Line closure and beyond== |
|
{{refimprove|date=August 2014}} |
|
|
Passenger services on the Waverley Line were proposed for withdrawal as part of the ] of the 1960s. On 17 August 1966, British Railways gave formal notice to close the line from 2 January 1967; closure notices were posted at all stations on the line. 508 official objections against the closure were lodged within the required six weeks of the closure notice being issued. A reprieve was announced and the closure was frozen pending review; a public hearing was held in Hawick on 16 and 17 November 1967. On 15 July 1968, the Minister for Transport, Richard Marsh, gave the final order that the line would close on Monday, 6 January 1969. A public outcry ensued and a high-profile campaign to save the line followed. A petition was delivered to ] on 18 December 1968, but this did not prevent the closure of the line. |
|
|
|
|
|
The last passenger train (and the last train to traverse the entire route) was 1M82 21.56 Edinburgh Waverley - London St Pancras sleeper on 5 January 1969, which was hauled by ] D60 "Lytham St Annes". Emotions were running high along the route on the final weekend of passenger operations. Protesters were evident at most stations and the authorities, sensing the potential for trouble, sent a Clayton 'pilot' engine ahead of 1M82 under caution from Hawick to 'prove' the route south after a set of points at Whitrope was tampered with. At Newcastleton, the pilot engine found the line was blocked and the level crossing gates had been locked by protesters. The disturbances led to the arrest of the local minister, who was released after ] MP{{mdash}}who was travelling on the sleeper{{mdash}}negotiated with the police and addressed the protesters. This caused 1M82 to arrive two hours late in Carlisle. |
|
|
|
|
|
On the afternoon of 8 January at Riddings Junction, BR staged a tracklifting 'ceremony' for the press to split the London Midland and Scottish Regions, demonstrating their determination to dismantle the route. After the passage of 1M82, the line was formally closed to passengers and the line between Hawick and Longtown closed completely and came under engineers' possession for dismantling. The Up line between Lady Victoria Pit and Hawick was not used after 6 January. |
|
|
|
|
|
Contracts with the coal industry forced British Rail to freight traffic between Millerhill and Galashiels, and between St. Boswells and Hawick until Friday, 25 April 1969. This was a daily service carrying mainly coal traffic from Lady Victoria Pit and oil tank wagons to St Boswells. The signalling was drastically reduced after passenger closure with 'one train working' by 'telephone and notice board' over the down line from Lady Victoria Pit to Hawick. At that time, the {{Convert|42|mile|1078|yard|km}} block section between Lady Victoria Pit and Hawick over the down line was the longest on the British railway network. A signalman travelled with the daily train from Lady Victoria Pit south and returned to operate the still-open boxes and operate levers for sidings. |
|
|
|
|
|
On 28 April 1969 traffic was cut back to Lady Victoria Pit, which survived until December 1971 when the line was further cut back to Newtongrange at Butlerfield Washery, which in turn survived until June 1972. At the southern end of the route, the line between Carlisle Kingmoor and Longtown remained open to traffic until 31 August 1970, when it was cut back to Brunthill. {{As of|2014}} the section between Carlisle Kingmoor and Brunthill remains open and is used by periodic freight traffic although the remaining portion of the route is little more than a long siding. |
|
|
|
|
|
Tracklifting was temporarily halted in early 1969 while negotiations with British Rail were held to discuss the sale of infrastructure to a private consortium, The Border Union Railway Co. Options to keep the route open{{mdash}}such as singling large sections and reducing the number of signal boxes, and a 'basic' DMU service between Edinburgh from Hawick{{mdash}}were discussed, but these discussions were fruitless. British Rail ceased negotiations on 23 December 1969 and formally announced this to the press on 6 January 1970 after requesting interest payments to keep the infrastructure 'in situ' while funding for the approximately £750,000 capital required was sought. Local authorities were also approached to pay for a basic passenger train service; but this too received no support. |
|
|
|
|
|
There was a two-year moratorium on disposal of the land on the route, which was part of the closure process agreed to by the Minister. Until this point, tracklifting had been limited to 'singling' sections of line, but work to dismantle the railway recommenced in November 1969. An inspection saloon ran over the route on 1 April 1970 to allow contractors to bid for the demolition work. Track lifting started in earnest and trains could be seen dismantling the line. The Down line between Hawick and Longtown was lifted by April 1971, the Up line was lifted in February 1970, and the entire route between Longtown to Newtongrange was removed by early 1972. The final stretch between Newtongrange and Millerhill was closed on 28 June 1972 and was removed soon after. There exists photographic evidence of tracklifting at Eskbank in October 1972 and documentary evidence that track was still being lifted by September that year. By the end of 1972, only stubs at the north and south end of the route remained, and still exist {{As of|2014|alt=as of 2014}}. |
|
|
|
|
|
The last train to cross Hawick station viaduct did so on 18 April 1971. Hauled by D3880 (08713), it was lifting the line behind it. Hawick South signal box was demolished on 13 July 1972, while work on dismantling the station buildings and goods shed started on 20 January 1975. Demolition of the viaduct over the River Teviot commenced on 1 September 1975. After the closure and lifting of the line, the parcels office at Hawick and Galashiels remained open; British Rail carried parcel traffic by road for a few more years. In the late 1990s there was some discussion about reopening the southern section from Carlisle as far as Riccarton Junction. With the trees in the reforested areas of ] now approaching maturity, the network of minor roads and the local population were seen as vulnerable to, and unable to cope with, significantly increased logging traffic. Reinstating a single track railway was seen to provide transport capacity for heavy loads bypassing the villages, but the project was not pursued any further. |
|
|
|
|
|
Cut off from Edinburgh to the north and Carlisle to the south, those lacking a car had no option but to travel by bus. {{As of|2014}}, the main bus service to Edinburgh takes more time than a Victorian steam train and double the time of a commuter train in 1968. Without the new Borders Railway, commuters can spend up to 90 minutes travelling between Galashiels and Edinburgh.<ref></ref> |
|
Cut off from Edinburgh to the north and Carlisle to the south, those lacking a car had no option but to travel by bus. {{As of|2014}}, the main bus service to Edinburgh takes more time than a Victorian steam train and double the time of a commuter train in 1968. Without the new Borders Railway, commuters can spend up to 90 minutes travelling between Galashiels and Edinburgh.<ref></ref> |
|
|
|
|
Reconstruction work on the Edinburgh-Galashiels-Tweedbank section of the railway is under way; as of 2014 this part of the line is scheduled to reopen on 6 September 2015.
Cut off from Edinburgh to the north and Carlisle to the south, those lacking a car had no option but to travel by bus. As of 2014, the main bus service to Edinburgh takes more time than a Victorian steam train and double the time of a commuter train in 1968. Without the new Borders Railway, commuters can spend up to 90 minutes travelling between Galashiels and Edinburgh.
On 27 March 2010, it was announced that tendering was underway; three bids were received in June 2010. The winning bids were to be announced in September 2011. The final cost was estimated at between £235 million and £295 million. The tender process was scrapped on 29 September 2011 and the line will now be built by Network Rail. Network Rail began work on the Edinburgh-Tweedbank section on 6 November 2012. In 2012, the line was scheduled to reopen to passenger traffic in 2015. In December 2012, BAM Nuttall, a subsidiary of the Dutch Royal BAM Group, was appointed to build the 30-mile (50 km) stretch of track from Edinburgh to Tweedbank. The budget has risen from £295 million to £348 million and up to 500 jobs are expected to be created.
In 2011, a survey of Bowshanks tunnel north of Galashiels found that the site had become used as a temporary roost by Soprano pipistrelle and Mouse-eared bats. After agreement with and subsequent licensing from Scottish Natural Heritage, new wooden roosts were installed in trees either side of the tunnel and one-way flaps were installed inside the tunnel to allow the bats to leave before renovation work began. In 2013, concerns that the project was no longer economically viable were raised because of the failure of a local property boom, which meant a large drop in projected passenger numbers. A business case by consultants Ernst & Young said the economic spin-off would amount to half of the return on the current estimated outlay of £350 million. Scottish Government agency Transport Scotland said the project remained on course to generate benefits of up to 30% greater than its costs.