Misplaced Pages

New Technology Train: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 09:28, 16 May 2021 editMtaFireFighterTrain38 (talk | contribs)24 edits Undid revision 1023123330 by 2603:7000:DD01:90D:797D:533D:A52D:A3F8 (talk) that's sources was correct.Tags: Undo Mobile edit Mobile web edit Advanced mobile edit← Previous edit Revision as of 08:16, 15 June 2021 edit undoRgelu20 (talk | contribs)30 edits HistoryTags: Reverted Mobile edit Mobile web edit Advanced mobile editNext edit →
Line 47: Line 47:
On June 4, 2012, Bombardier was awarded the ] contract for 300 new B Division cars, to replace the 50 ] on the ] ({{NYCS trains|Jamaica east}}).<ref name=MTA-CapitalOversight-Oct2012/><ref name="MTA-CapitalOversight-Jan2016" /><ref name="R179StaffSummary-2012"></ref> In December 2012, preliminary designs began on the ] B Division contract, which entails 940 cars in order to expand the system fleet, and to replace the ] fleet, and the R44 fleet of the ]; both models were built in the 1970s.<ref name="MTA-CapitalOversight-Jan2016" /> Both the R179 and R211 orders are supposed to replace the 222 remaining ] cars, which were built in the 1960s and have run well past their expected lives, by the year 2022.,<ref name="MTA-ReviewAC-2015">{{cite web|title=Review of the A and C Lines|url=http://web.mta.info/nyct/service/pdf/AC_LineReview.pdf|publisher=]|access-date=January 19, 2016|date=December 11, 2015}}</ref><ref>{{cite web|last1=Rivoli|first1=Dan|title=Ancient subway trains on C and J/Z lines won't be replaced until 2022, documents say|url=http://www.nydailynews.com/new-york/ancient-subway-trains-won-replaced-2022-article-1.2323289|work=]|access-date=November 25, 2015|date=August 13, 2015}}</ref><ref name="AMNY-R179Arrive-Sep62016"/> however, in January 2020, it was decided that the R179 fleet was to replace all remaining R32s.<ref>{{Cite web|url=https://scontent-lga3-1.xx.fbcdn.net/v/t1.15752-9/93116117_242611760125712_5319767005589405696_n.jpg?_nc_cat=105&_nc_sid=b96e70&_nc_ohc=MO2jjGYsdKQAX-TH92X&_nc_ht=scontent-lga3-1.xx&oh=3fe159830d927100fb07a5d07129b94f&oe=5EC88183|title=Car assignments &ndash; effective April 27, 2020|last=Bechtel|first=Allyson|publisher=New York City Transit|date=April 24, 2020|archive-url=https://web.archive.org/web/20200426104745/https://scontent-lga3-1.xx.fbcdn.net/v/t1.15752-9/93116117_242611760125712_5319767005589405696_n.jpg?_nc_cat=105&_nc_sid=b96e70&_nc_ohc=MO2jjGYsdKQAX-TH92X&_nc_ht=scontent-lga3-1.xx&oh=3fe159830d927100fb07a5d07129b94f&oe=5EC88183|archive-date=April 26, 2020|access-date=April 25, 2020}}</ref> The first R188s entered service on November 9, 2013.<ref name="MTA-R188-Nov2013">{{cite web|url=http://www.mta.info/news/2013/11/18/new-subway-cars-being-put-test |title=MTA &#124; news &#124; New Subway Cars Being Put to the Test |publisher=New.mta.info |date=November 18, 2013 |access-date=August 24, 2014}}</ref> The R179 order fell significantly behind schedule,<ref name=MTA-CapitalOversight-Oct2012/><ref name="MTA-CapitalOversight-Jan2016" /> with first test train delivered in September 2016.<ref name="Photobucket 2016">{{cite web | title=Photo by David Paul Gerber | website=Photobucket | date=September 6, 2016 | url=http://s59.photobucket.com/user/Newkirk-Plaza-David/media/20160906_182710.jpg.html?src=pb | access-date=September 7, 2016}}</ref><ref name=":1">{{Cite web|url=http://www.amny.com/transit/new-mta-subway-cars-to-arrive-for-testing-will-replace-oldest-fleet-1.12276227|title=Exclusive: New subway cars to arrive for testing this week|access-date=September 7, 2016|date=September 6, 2016}}</ref><ref name="AMNY-R179Arrive-Sep62016">{{cite news|last1=Barone|first1=Vincent|title=New MTA subway cars to arrive for testing, will replace oldest fleet|url=http://www.amny.com/transit/new-mta-subway-cars-to-arrive-for-testing-will-replace-oldest-fleet-1.12276227|access-date=September 8, 2016|work=]|date=September 6, 2016}}</ref> On June 4, 2012, Bombardier was awarded the ] contract for 300 new B Division cars, to replace the 50 ] on the ] ({{NYCS trains|Jamaica east}}).<ref name=MTA-CapitalOversight-Oct2012/><ref name="MTA-CapitalOversight-Jan2016" /><ref name="R179StaffSummary-2012"></ref> In December 2012, preliminary designs began on the ] B Division contract, which entails 940 cars in order to expand the system fleet, and to replace the ] fleet, and the R44 fleet of the ]; both models were built in the 1970s.<ref name="MTA-CapitalOversight-Jan2016" /> Both the R179 and R211 orders are supposed to replace the 222 remaining ] cars, which were built in the 1960s and have run well past their expected lives, by the year 2022.,<ref name="MTA-ReviewAC-2015">{{cite web|title=Review of the A and C Lines|url=http://web.mta.info/nyct/service/pdf/AC_LineReview.pdf|publisher=]|access-date=January 19, 2016|date=December 11, 2015}}</ref><ref>{{cite web|last1=Rivoli|first1=Dan|title=Ancient subway trains on C and J/Z lines won't be replaced until 2022, documents say|url=http://www.nydailynews.com/new-york/ancient-subway-trains-won-replaced-2022-article-1.2323289|work=]|access-date=November 25, 2015|date=August 13, 2015}}</ref><ref name="AMNY-R179Arrive-Sep62016"/> however, in January 2020, it was decided that the R179 fleet was to replace all remaining R32s.<ref>{{Cite web|url=https://scontent-lga3-1.xx.fbcdn.net/v/t1.15752-9/93116117_242611760125712_5319767005589405696_n.jpg?_nc_cat=105&_nc_sid=b96e70&_nc_ohc=MO2jjGYsdKQAX-TH92X&_nc_ht=scontent-lga3-1.xx&oh=3fe159830d927100fb07a5d07129b94f&oe=5EC88183|title=Car assignments &ndash; effective April 27, 2020|last=Bechtel|first=Allyson|publisher=New York City Transit|date=April 24, 2020|archive-url=https://web.archive.org/web/20200426104745/https://scontent-lga3-1.xx.fbcdn.net/v/t1.15752-9/93116117_242611760125712_5319767005589405696_n.jpg?_nc_cat=105&_nc_sid=b96e70&_nc_ohc=MO2jjGYsdKQAX-TH92X&_nc_ht=scontent-lga3-1.xx&oh=3fe159830d927100fb07a5d07129b94f&oe=5EC88183|archive-date=April 26, 2020|access-date=April 25, 2020}}</ref> The first R188s entered service on November 9, 2013.<ref name="MTA-R188-Nov2013">{{cite web|url=http://www.mta.info/news/2013/11/18/new-subway-cars-being-put-test |title=MTA &#124; news &#124; New Subway Cars Being Put to the Test |publisher=New.mta.info |date=November 18, 2013 |access-date=August 24, 2014}}</ref> The R179 order fell significantly behind schedule,<ref name=MTA-CapitalOversight-Oct2012/><ref name="MTA-CapitalOversight-Jan2016" /> with first test train delivered in September 2016.<ref name="Photobucket 2016">{{cite web | title=Photo by David Paul Gerber | website=Photobucket | date=September 6, 2016 | url=http://s59.photobucket.com/user/Newkirk-Plaza-David/media/20160906_182710.jpg.html?src=pb | access-date=September 7, 2016}}</ref><ref name=":1">{{Cite web|url=http://www.amny.com/transit/new-mta-subway-cars-to-arrive-for-testing-will-replace-oldest-fleet-1.12276227|title=Exclusive: New subway cars to arrive for testing this week|access-date=September 7, 2016|date=September 6, 2016}}</ref><ref name="AMNY-R179Arrive-Sep62016">{{cite news|last1=Barone|first1=Vincent|title=New MTA subway cars to arrive for testing, will replace oldest fleet|url=http://www.amny.com/transit/new-mta-subway-cars-to-arrive-for-testing-will-replace-oldest-fleet-1.12276227|access-date=September 8, 2016|work=]|date=September 6, 2016}}</ref>


On January 19, 2018, the MTA Board suggested that Kawasaki Rail Car Corp., a subsidiary of ], be awarded the $3.7 billion base order for the first 535 new R211 cars. The cars are anticipated to be delivered from 2020 to 2023, with the option orders to be delivered by 2025. The R211 base order includes 20 R211T cars with ]s; 75 R211S cars for the Staten Island Railway, to be delivered near the end of the base order; and 440 cars similar to the R143/R160 series, operating in five-car units.<ref name=NYTimes-Next-Gen-Cars-2018/> The cars will be assembled at Kawasaki's factories in ], and ].<ref name="NYTimes-Next-Gen-Cars-2018">{{cite news |last=Maslin Nir |first=Sarah |date=January 19, 2018 |title=New York Set to Acquire the Next Generation of Subway Cars |url=https://www.nytimes.com/2018/01/19/nyregion/subway-trains-kawasaki-transportation.html |work=The New York Times |access-date=January 20, 2018}}</ref> The first test train is expected to be delivered in December 2020, with the production cars being delivered between 2021 and 2023.<ref>{{Cite web|author=Metropolitan Transportation Authority|title=Capital Program Oversight Committee Meeting|date=January 22, 2018|url=http://web.mta.info/mta/news/books/pdf/180122_1400_CPOC.pdf|access-date=January 19, 2018|pages=39–40|author-link=Metropolitan Transportation Authority}}</ref> On January 19, 2018, the MTA Board suggested that Kawasaki Rail Car Corp., a subsidiary of ], be awarded the $3.7 billion base order for the first 535 new R211 cars. The cars are anticipated to be delivered from 2020 to 2023, with the option orders to be delivered by 2025. The R211 base order includes 20 R211T cars with ]s; 75 R211S cars for the Staten Island Railway, to be delivered near the end of the base order; and 440 cars similar to the R143/R160 series, operating in five-car units.<ref name=NYTimes-Next-Gen-Cars-2018/> The cars will be assembled at Kawasaki's factories in ], and ].<ref name="NYTimes-Next-Gen-Cars-2018">{{cite news |last=Maslin Nir |first=Sarah |date=January 19, 2018 |title=New York Set to Acquire the Next Generation of Subway Cars |url=https://www.nytimes.com/2018/01/19/nyregion/subway-trains-kawasaki-transportation.html |work=The New York Times |access-date=January 20, 2018}}</ref> The first test train is expected to be delivered in December 2020, with the production cars being delivered between 2021 and 2023.<ref>{{Cite web|author=Metropolitan Transportation Authority|title=Capital Program Oversight Committee Meeting|date=January 22, 2018|url=http://web.mta.info/mta/news/books/pdf/180122_1400_CPOC.pdf|access-date=January 19, 2018|pages=39–40|author-link=Metropolitan Transportation Authority}}</ref> In late March 2021, TV station ] reported that delivery of the first cars had slipped further, with the arrival of the first cars delayed to June 2021.<ref>{{Cite web|title=Newest MTA Train Model Continues to Face Delays Amid COVID-19|url=https://www.ny1.com/nyc/all-boroughs/transit/2021/03/30/newest-mta-train-model-continues-to-face-delays-amid-covid-19|access-date=2021-04-02|website=www.ny1.com|language=en}}</ref>


==Design and features== ==Design and features==

Revision as of 08:16, 15 June 2021

The typical NTT car design for the A Division (top; an R142) and B Division (bottom; an R160)

New Technology Train (NTT) is the collective term for the modern passenger fleet of the New York City Subway that has entered service since the turn of the 21st century. This includes the current R142, R142A, R143, R160, R179, and R188 models and the planned R211 and R262 models. Two prototypes, the R110A and R110B, were used to test the features that would be found on all NTT trains today.

Sometimes referred to as New Millennium Trains, they are known for improvements in technology, energy efficiency, reliability, and comfort along with advanced passenger information systems. All of these trains are capable of operating with communications-based train control (CBTC)—which can allow for automatic train controls and compatibility with updated signal systems—and either already have CBTC or are scheduled to be retrofitted with the system. Much of the engineering and construction efforts for the fleet have been done by Kawasaki Heavy Industries and Bombardier Transportation, with Alstom also participating in the construction of the R160 fleet.

List of New Technology Trains

This is a list of all NTT trains operated by the New York City Subway, as well as future trains and retired trains of the MTA.

Current

  • R142 – Built by Bombardier Transportation. The first production model of NTT trains ever built. Built for the A Division. Entered service on July 10, 2000. Assigned to the 2, 4 and 5 routes. The R142s are similar to the R142As and the R188s.
  • R142A – Built by Kawasaki Rail Car Company. The second model of NTT trains. Used by the A Division. Also entered service on July 10, 2000, the same day the R142s entered service. 380 cars converted into R188s. 220 cars remain unconverted, and are currently assigned to the 4. The R142As are similar to the R142s and nearly identical to the R188s.
  • R143 – Built by Kawasaki Rail Car Company. The third model of NTTs and the first model of NTTs for the B Division, assigned to the L. Entered service on February 12, 2002. Equipped with CBTC, the first subway car to be equipped with this feature. The R143s are similar to the R160s and R179s.
  • R160 – Built by Alstom and Kawasaki Rail Car Company. Used by the B Division. The fourth model of NTT trains. There are two subtypes since these cars were built by two different manufacturers. R160As were built by Alstom, while R160Bs were built by Kawasaki. The R160Bs entered service on August 17, 2006, while the R160As entered service on October 17, 2006. Currently, the R160s are assigned to the E, F, J/Z, L, M, N, Q, R, and W routes. 17 four-car sets, have CBTC for the L. An additional 309 sets, configured in four and five-car sets, will be equipped with CBTC for the IND Queens Boulevard Line, which the E, F, M, and R routes run on. The R160s are similar to the R143s and R179s; none of them are interchangeable, however.
  • R179 – Built by Bombardier Transportation. The sixth model of NTT trains. Used by the B Division. The first car to be delivered, numbered 3014, arrived at 207th Street Yard on September 6, 2016. The R179s entered service on December 27, 2017. All cars were delivered by the end of December 2019. Currently, the R179s are assigned to the A, C, and J/Z routes. The R179s are similar to the R160s and R143s.
  • R188 – Built by the Kawasaki Rail Car Company. The fifth model of NTT trains. The R188s entered service on December 15, 2013. They are used exclusively on the 7 route of the A Division, and thus is grouped in eleven-car trains, and are CBTC equipped. The order consists of 380 converted R142A cars and of 126 identical newly built cars. The R188s are similar to the R142s in addition to being nearly identical to the R142As.

Future

  • R211 – To be built by Kawasaki Rail Car Company. Will be used by the B Division, as well as the Staten Island Railway. 20 cars are open-gangway experimental prototype cars. Will possibly also have Wi-Fi, security cameras, digital video screens, and electronic charging stations. The design of the R211 will be completely different compared to the design of the other NTT trains.
  • R262 – Will be used by the A Division. Will replace the R62 and R62A fleet, and include open gangways, communications-based train control, and ethernet systems. Manufacturer is to be announced.

Retired

  • R110A – Contract number was R130. Built by Kawasaki Rail Car Company and used mainly on the 2 route. Was a prototype train for the A Division that operated from 1993 to 1999. Used to test out new technology features that would be incorporated into the R142 car order. Was not intended for long-term production use. All B-cars of the set were converted into pump cars between 2013 and 2014. All A-cars set to be converted in the future.
  • R110B – Contract number was R131. Built by Bombardier Transportation and used mainly on the A route. Also ran on the C route for final years in service. Was a prototype train for the B Division that operated from 1993 to 2000. Designed to test various new technology features that would eventually be incorporated into the R143 car order and was also not intended for long-term production use. Five cars were sent away, while four cars remain at 207th Street Yard.

History

Two R110B cars, the B Division NTT prototype, stored at 207th Street Yard

The New Technology program emerged from modernization efforts by the Metropolitan Transportation Authority (MTA) beginning in 1982, when the subway "was on the verge of collapse". The New Technology program officially began in 1988, the first effort at a technologically advanced subway car since the R44 in the early 1970s. In 1989, the MTA awarded contracts for two prototype test trains: the R110A (contract R130) for the A Division built by Kawasaki Heavy Industries, and the R110B (contract R131) for the B Division built by Bombardier Transportation. The two New Technology test trains (NTTTs) began service in June 1993, testing features that would be implemented on future mass-production orders. Both trains were taken out of service by 2000, due to multiple issues with the trains.

In 1997, the first mass order of New Technology trains was placed for the R142 and R142A trains of the A Division (awarded to Bombardier and Kawasaki respectively), in order to replace the final 1,410 Redbird cars in operation. In 1998, a smaller contract of 212 cars, consisting of 100 in the base order and 112 in the optional order, was awarded to Kawasaki Heavy Industries, to build the R143 model for the B Division's BMT Eastern Division (primarily the BMT Canarsie Line's L train). The first R142s and R142As entered service beginning in July 2000. The R143s began operation in February 2002.

The interior of an R160 in 2010

In July 2002, the MTA awarded contracts to Kawasaki and Alstom Transportation for the R160 order for the B Division, with options for up to 1,700 cars to replace many 1960s- and 1970s-era cars. The first R160 train, built by Kawasaki under the contract R160B, began service on August 17, 2006, on the N. The initial 660-car base order was filled by October 2008, with a total of 1,662 cars delivered by May 6, 2010.

On May 5, 2010, Kawasaki was awarded the contract for the R188 A Division order, to provide 46 CBTC-ready 11-car trains for the IRT Flushing Line (7 and <7>​ trains). Unlike the other orders, the R188 constructed only 126 new subway cars, with the remaining 380 cars consisting of converted R142As.

On June 4, 2012, Bombardier was awarded the R179 contract for 300 new B Division cars, to replace the 50 R42s on the BMT Jamaica Line (J and ​Z trains). In December 2012, preliminary designs began on the R211 B Division contract, which entails 940 cars in order to expand the system fleet, and to replace the R46 fleet, and the R44 fleet of the Staten Island Railway; both models were built in the 1970s. Both the R179 and R211 orders are supposed to replace the 222 remaining R32 cars, which were built in the 1960s and have run well past their expected lives, by the year 2022., however, in January 2020, it was decided that the R179 fleet was to replace all remaining R32s. The first R188s entered service on November 9, 2013. The R179 order fell significantly behind schedule, with first test train delivered in September 2016.

On January 19, 2018, the MTA Board suggested that Kawasaki Rail Car Corp., a subsidiary of Kawasaki Heavy Industries, be awarded the $3.7 billion base order for the first 535 new R211 cars. The cars are anticipated to be delivered from 2020 to 2023, with the option orders to be delivered by 2025. The R211 base order includes 20 R211T cars with open gangways; 75 R211S cars for the Staten Island Railway, to be delivered near the end of the base order; and 440 cars similar to the R143/R160 series, operating in five-car units. The cars will be assembled at Kawasaki's factories in Lincoln, Nebraska, and Yonkers, New York. The first test train is expected to be delivered in December 2020, with the production cars being delivered between 2021 and 2023. In late March 2021, TV station NY1 reported that delivery of the first cars had slipped further, with the arrival of the first cars delayed to June 2021.

Design and features

Driver's cab of an R160A subway car on an N trainThe CBTC console (right) installed on an R188 car in 7 service

The NTT models utilize a common car design; stainless-steel car bodies with a black front fascia on the "A" (cab) cars, open lexan-glass windows on non-cab ends allowing passengers to see through to the next car, and electronic outer route signs, as opposed to the rollsigns used by previous models. Improvements to the conductors' interface include the addition of speedometers as well as electronic consoles that monitor mechanical problems that may occur on the train. The cars feature a white fiberglass interior with blue-gray plastic bench seats both to combat vandalism, along with bright fluorescent lighting and LED interior passenger information signs. The bench-style seats, designed with lumbar supports, also replaced the unpopular bucket-style seats used on rolling stock built in the 1970s and '80s, which were both uncomfortable for passengers and hard to clean. The trains utilize an airbag suspension (replacing conventional springs) for a more comfortable ride, and employ regenerative braking which converts the energy from brake application into electricity that is fed back into the third rail.

All NTT trains are capable of being equipped with communications-based train control (CBTC) technology, which is installed in the "A" cars behind the train operator's cab. Currently, only the R143s and R188s, as well as sixty-eight R160As, have been upgraded for automated service, on the L and 7 routes. Many, if not all of the remaining R160s will also be retrofitted with CBTC, as well as all existing cars in the R142 and R142A fleets and future cars in the R211 and R262 fleets.

Recorded announcements

The NTTs are the first rolling stock in the system to utilize pre-recorded train announcements, as opposed to live announcements from conductors. The recorded announcements are used for station information, closing doors, and other general messages. Station announcements rely on a wheel-rotation counter to make accurate stop announcements. The recordings began in the late 1990s and feature Bloomberg Radio on-air speakers, who volunteered at the request of their employer Michael Bloomberg, who would later become mayor of New York City. Voices include Diane Thompson (for the 1, 2, and 3 trains), Melissa Kleiner (original voice of the 4 and 5 trains outside of Manhattan), Jessica Ettinger Gottesman (current voice for the 4, 5, and 6 trains), Annie Bergen (for the 7 train and 42nd Street Shuttle), Catherine Cowdery (for the B, D, E, G, J, L, M, N, Q, R, (V discontinued), W, and Z trains), Kathleen Campion (for the A, C, and F trains, as well as the Franklin Avenue Shuttle and Rockaway Park Shuttle), and Charlie Pellett (for other announcements). Since 2018, Velina Mitchell has also done some of the announcements formerly performed by Pellett, particularly informational messages and station accessibility information.

Female voices are typically used for station, route, and transfer/connection announcements, although Pellett announces the majority of the transfers on the A Division instead of the female voices. Pellett's recordings are used for most of the remaining announcements, most notably "Stand clear of the closing doors, please" before train doors closing, but also for safety announcements such as "Please be careful of the gap between the platform and the train" before entering a station with curved platforms, and "If you see something, say something." With regards to why certain messages are voiced by males and others by females, MTA spokesperson Gene Sansone said in 2006, "Most of the orders are given by a male voice, while informational messages come from females. Even though this happened by accident, it is a lucky thing because a lot of psychologists agree that people are more receptive to orders from men and information from women." Manual announcements can still be made over the public address system by train operators and conductors.

In January 2020, as part of an agreement between the MTA and Comedy Central to promote actress Awkwafina's TV show Nora From Queens, the default pre-recorded announcements for the 7 train on the R188s were replaced with those from Awkwafina for one week. The announcements from Awkwafina featured jokes in addition to the standard station announcements. The agreement was the first time that the MTA has replaced train announcements as a form of advertising.

Electronic strip maps

Station indicator on a Lexington Avenue line 4 trainElectronic strip map on an R142 4 trainStation indicator on a Canarsie line L trainElectronic strip map on an R143 L train

The R142s, R142As, R143s, and R188s feature electronic "strip maps." These maps utilize a total of 63 amber LED lights, numbered 001–063, to display stops, with a plastic card on top showing the route, stations, and transfers. A light will flash when a stop is being approached, and while idle at that stop. Lights turned off to indicate a stop already reached, or a part of the route not serviced on that particular trip. LED arrows at either end of the map indicate the direction of service.

Electronic strip maps were first tested on the R110A and R110B in the 1990s. While an upgrade from static route maps, most of the strip maps can only facilitate one service and must be turned off when a train is used on another route. This problem is common on the 2 and 5 trains, which both use R142 cars based from the East 180th Street and 239th Street yards and have large amounts of route overlap on the IRT White Plains Road, Eastern Parkway, and Nostrand Avenue lines. The problem is also seen occasionally on the J/Z and L trains, which use R143 cars from the East New York yard that is shared by all three services. To solve this problem, the MTA began replacing the individual strip maps for cars assigned to these routes in 2016, with combined strip maps showing both services; the R143s would later be retrofitted with strip maps that also show all stops used by all three services beginning in late 2019.

FIND displays

The R160 FIND system on a Coney Island-bound F trainFIND system on an R160 F trainThe proposed to FIND system of the R211, simulating a Far Rockaway-bound A trainThe proposed FIND system of the R211 Mock-Up

The R160s and R179s, as well as the future R211s, employ an advanced alternative to strip maps, called the "Flexible Information and Notice Display," or "FIND." This includes an LCD screen displaying the route, route information, and advertisements, as well as a dynamic red, yellow, and green LED strip map that displays the next ten stations, plus five consecutive "further stops" to riders. There are three of these in every car. The display updates the stations at every stop, also giving the number of stops to each station listed. This allows for instant route or line changes with the correct information, which includes, but is not limited to, omitting certain stops (displayed as "Will not stop" in red).

The FIND systems used on the R179s are slightly different from those used on the R160s. The LCD displays where the route's emblem is displayed are slightly larger than those on the R160s. If the FIND has gone blank, the R179 FIND displays "Route change: this map is not in use", as opposed to the R160 FIND, which displays "Listen to train crew for announcement."

Incidents

On June 21, 2006, an eight-car R143 train overshot the bumper at the end of the tracks in the Canarsie Yard. Leading car 8277 suffered significant damage and was stripped of damaged parts before being sent to the Kawasaki plant in Yonkers to receive repairs. The other cars in the set suffered minor body damage and were moved to the 207th Street Yard and repaired. By 2016, car 8277 was finally recoupled with 8278-8280.

After Hurricane Sandy, R160B set 8738–8742 was damaged and required an extensive electrical reconstruction at Coney Island Shops. In March 2016, the set underwent pre-service testing and finally returned to service in fall 2016.

On March 27, 2020, a northbound 2 train with R142 consists 6346-6350 and 6366-6370 caught fire while traveling from 96th Street to Central Park North–110th Street, killing the operator and injuring 16 others. The fire erupted on board car 6347, damaging that car, as well as causing additional fire and smoke damage to the rest of the set, which has been taken out of service.

Since the delivery of the R179s, multiple issues have resulted in their temporary removal from service for investigations and repairs. By the start of December 2018, some R179s had to be taken out of service due to manufacturing defects such as doors, propulsion, and air compressors issues. In early January 2019, NYCTA President Andy Byford ordered more newer R179 cars to be removed from passenger service and the temporary suspension of the delivery of further cars until Bombardier corrected all defects found within them. Deliveries recommenced in February 2019. On May 10, 2019, it was found that there is a welding defect on the collision pillars of the R179, but not all trains on property at the time were pulled from service. Between January 8 and January 24, 2020, all cars in revenue were taken out of passenger service due to raised concerns that train doors could malfunction while the trains were in service, and that doors could potentially open up when the train was in motion, all taking place on the C train. Most recently, the fleet was sidelined between June 3, 2020 and September 23, 2020 after a set of R179s on the A train had its link bar break in service at Chambers Street station, causing the consist to be split into two. The entire fleet was subsequently pulled from service and underwent thorough safety investigations to address any in-service issues that do occur.

References

  1. ^ Sims, Calvin (May 9, 1990). "For This Project, Subway Cars Are the Stuff of Dreams". The New York Times. Retrieved January 24, 2016.
  2. ^ "New Technology Train Rolled Out This Morning Along the E Line". Metropolitan Transportation Authority. December 22, 2008. Retrieved December 7, 2015.
  3. "The MTA 2006 ANNUAL REPORT: Comprehensive Annual Financial Report for the Year Ended December 31, 2006 Comprehensive Annual Financial Report for the Year Ended December 31, 2006" (PDF). Metropolitan Transportation Authority. May 1, 2007. Retrieved December 28, 2015.
  4. ^ "New York City Transit and the Environment". Metropolitan Transportation Authority. Retrieved January 24, 2016.
  5. http://web.mta.info/mta/news/books/pdf/190122_1400_CPOC.pdf
  6. http://web.mta.info/mta/news/books/pdf/170724_1345_CPOC.pdf
  7. ^ "New York City Transit - History and Chronology". Metropolitan Transportation Authority. Archived from the original on January 8, 2014. Retrieved July 14, 2016.
  8. ^ Gene Sansone (October 25, 2004). New York Subways: An Illustrated History of New York City's Transit Cars. JHU Press. pp. 273–282. ISBN 978-0-8018-7922-7.
  9. ^ "New York subway orders". Railway Gazette International. June 1, 2003. Retrieved September 9, 2016.
  10. ^ "Capital Program Oversight Committee Meeting: October 2012" (PDF). Metropolitan Transportation Authority. October 2012. Archived from the original (PDF) on February 5, 2016. Retrieved July 14, 2016.
  11. ^ "MTA Capital Program Oversight Committee Meeting: January 2016" (PDF). mta.info. Metropolitan Transportation Authority. January 2016. Archived from the original (PDF) on January 29, 2016. Retrieved January 23, 2016.
  12. ^ Kennedy, Randy (July 31, 2002). "1,700 Subway Cars to Be Built Under Largest Such Contract in New York History". The New York Times. p. B3.
  13. ^ Chan, Sewell (November 30, 2005). "New Subway Cars Promise All Kinds of Information". The New York Times. Retrieved October 27, 2007.
  14. ^ "Subway contract won with help from Brazil". Railway Gazette International. January 1, 2003. Retrieved January 27, 2016.
  15. https://new.mta.info/document/13836
  16. ^ Lueck, Thomas J. (August 18, 2006). "City Subways Put New Cars Into Service as a Test Run". The New York Times. Retrieved January 24, 2016.
  17. ^ Barone, Vincent (September 6, 2016). "New MTA subway cars to arrive for testing, will replace oldest fleet". AM New York. Retrieved September 8, 2016.
  18. Metropolitan Transportation Authority (January 22, 2018). "Capital Program Oversight Committee Meeting" (PDF). p. 46. Retrieved January 19, 2018.
  19. https://m.facebook.com/BombardierRail/photos/a.902865919774651/2806951702699387/?type=3
  20. "Subdivision 'B' Car Assignments: Cars Required September 16, 2019" (PDF). The Bulletin. 62 (10). Electric Railroaders' Association: 16. October 2019. Retrieved December 5, 2019.
  21. ^ "MTA | news | New Subway Cars Being Put to the Test". New.mta.info. November 18, 2013. Retrieved August 24, 2014.
  22. "NYC, meet your (possible) subway cars of the future". am New York. January 25, 2016. Retrieved April 25, 2016.
  23. "Governor Cuomo Unveils Design of Reimagined MTA Subway Cars and Details Ambitious Plan to Enhance Subway Stations". July 18, 2016. Retrieved July 19, 2016.
  24. "MTA renderings" (PDF). www.governor.ny.gov. July 18, 2016. Retrieved July 18, 2016.
  25. ^ "Capital Program Oversight Committee Meeting" (PDF). Metropolitan Transportation Authority. January 2019. Retrieved January 18, 2019.
  26. ^ "Transit Cooperative Research Program Report 46: The Role of Transit Amenities and Vehicle Characteristics in Building Transit Ridership: Amenities for Transit Handbook and The Transit Design Game Workbook; PART 2: IMPACTS OF AMENITIES" (PDF). Washington, D.C.: Transportation Research Board, Project for Public Spaces, National Academy Press. 1999. Retrieved January 24, 2016.
  27. ^ Campanile, Carl (July 21, 1999). "NEW $2M SUBWAY CARS GET OFF ON THE WRONG TRACK; EXCLUSIVE". Daily News (New York). Retrieved September 9, 2016.
  28. "Capital Program Oversight Committee Meeting June 2014" (PDF). mta.info. Metropolitan Transportation Authority. June 23, 2014. Archived from the original (PDF) on March 16, 2016. Retrieved July 24, 2016.
  29. "Metropolitan Transportation Authority (MTA) Notice of Public Hearing and Description of Projects – Tuesday, August 23, 2016 4:30 P.M. – Request for Federal Financial Assistance Under the Federal Transportation Authorization For Federal Fiscal Year 2017 Capital Improvement Projects" (PDF). mta.info. Metropolitan Transportation Authority. July 28, 2016. p. 37. Archived from the original (PDF) on August 17, 2016. Retrieved August 23, 2016.
  30. Negron, Daniel (February 14, 2013). "Showing Image 138752". nycsubway.org. nycsubway.org. Retrieved July 24, 2016.
  31. Chan, Sewell (July 27, 2005). "Damaged Cars Hinder New York's Order for New Subways". New York Times. Retrieved August 30, 2009.
  32. "A Review of the Proposed Capital Program for the Metropolitan Transportation Authority" (PDF). Office of the New York State Comptroller. September 2009. Retrieved January 24, 2016.
  33. ^ Seaton, Charles (December 6, 2006). "New York City Bringing Rail Into the 21st Century". Metro Magazine. Retrieved January 27, 2016.
  34. ^ Pierre-Pierre, Garry (January 22, 1997). "After a Few Suggestions, City Presents Subway Cars With Seats of Amplitude". The New York Times. Retrieved January 24, 2016.
  35. "Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS); Chapter 2: Project Alternatives" (PDF). Metropolitan Transportation Authority, Federal Transit Administration, United States Department of Transportation. April 2003. Retrieved January 24, 2016.
  36. "Metro Business; Subway Job to Kawasaki". The New York Times. December 30, 1998.
  37. Siegal, Nina (October 1, 2000). "NEIGHBORHOOD REPORT: NEW YORK UNDERGROUND; 2 New Trains in the Subways: Catch Them if You Can". The New York Times. Retrieved January 24, 2016.
  38. "Kawasaki completes NYCT R143 order. (Market).(New York City Transit)(subway cars contract)". Railway Age. HighBeam Research. March 1, 2003. Archived from the original on February 20, 2016.
  39. ^ Press Release (July 31, 2002). "MTA NYC TRANSIT AWARDS NEW CAR CONTRACT". Metropolitan Transportation Authority. Archived from the original on February 3, 2006. Retrieved July 14, 2016.
  40. R179 Staff Summary
  41. "Review of the A and C Lines" (PDF). Metropolitan Transportation Authority. December 11, 2015. Retrieved January 19, 2016.
  42. Rivoli, Dan (August 13, 2015). "Ancient subway trains on C and J/Z lines won't be replaced until 2022, documents say". Daily News (New York). Retrieved November 25, 2015.
  43. Bechtel, Allyson (April 24, 2020). "Car assignments – effective April 27, 2020". New York City Transit. Archived from the original on April 26, 2020. Retrieved April 25, 2020.
  44. "Photo by David Paul Gerber". Photobucket. September 6, 2016. Retrieved September 7, 2016.
  45. "Exclusive: New subway cars to arrive for testing this week". September 6, 2016. Retrieved September 7, 2016.
  46. ^ Maslin Nir, Sarah (January 19, 2018). "New York Set to Acquire the Next Generation of Subway Cars". The New York Times. Retrieved January 20, 2018.
  47. Metropolitan Transportation Authority (January 22, 2018). "Capital Program Oversight Committee Meeting" (PDF). pp. 39–40. Retrieved January 19, 2018.
  48. "Newest MTA Train Model Continues to Face Delays Amid COVID-19". www.ny1.com. Retrieved April 2, 2021.
  49. "Feasibility Study of On-Car Regenerative Braking System (RBS) for Electric Rail Applications Final Report". ny.gov. New York State Energy Research and Development Authority. January 11, 2013. Retrieved January 24, 2016.
  50. "Volume 2, Part 3 - November 2008 MTA Financial Plan: Section IV-3 and section IV-12" (PDF). Metropolitan Transportation Authority. Retrieved July 19, 2016.
  51. "Capital Program Oversight Committee Meeting 7/24/2017" (PDF). Metropolitan Transportation Authority. July 24, 2017. p. 18. Retrieved October 28, 2017.
  52. "New York City Transit and Bus Committee Meeting October 2018" (PDF). mta.info. Metropolitan Transportation Authority. October 19, 2018. pp. 188–189. Archived from the original (PDF) on October 20, 2018. Retrieved October 20, 2018.
  53. ^ Biederman, Marcia (December 12, 2002). "For Subway Riders, a Sense of Place". The New York Times. Retrieved January 24, 2016.
  54. ^ "The voice behind the closing doors would like to clear something up". nypress.com. Straus News. March 18, 2003. Retrieved December 7, 2015.
  55. ^ "GUIDED BY SUBTERRANEAN VOICES". whosevoice.com. January 4, 2010. Retrieved December 7, 2015.
  56. Mauceri, Joe (May 16, 2018). "Meet the new voice of the NYC subway system". WPIX 11 New York. Retrieved February 16, 2019.
  57. Shaweddy, Vici (January 11, 2013). "Charlie Pellett - The Voice of New York Subway". Retrieved December 7, 2015.
  58. AM New York (September 25, 2006): "Voices Down Below", by Justin Rocket Silverman
  59. Goldbaum, Christina (January 16, 2020). "Awkwafina's Latest Role: Subway Announcer. New Yorkers Have Thoughts". The New York Times. ISSN 0362-4331. Retrieved January 17, 2020.
  60. "'Stop Manspreading!': Queens Native Awkwafina Takes Over 7 Train Subway Announcement". NBC New York. January 16, 2020. Retrieved January 17, 2020.
  61. "Queens-born actress Awkwafina will voice 7 train announcements for a week before her new show premieres". amNewYork. January 16, 2020. Retrieved January 17, 2020.
  62. "The MTA Is Now Turning Subway Announcements Into Ads, Starting With Awkwafina". Gothamist. January 16, 2020. Archived from the original on January 17, 2020. Retrieved January 17, 2020.
  63. ^ "New Interior Electronic Strip Maps Coming to Subway Cars on 2 5 Lines". Metropolitan Transportation Authority. February 12, 2016. Retrieved February 12, 2016.
  64. "JamaicaZ160". www.facebook.com. Retrieved September 26, 2020.
  65. Chan, Sewell (November 30, 2005). "New Subway Cars Promise All Kinds of Information". The New York Times. Retrieved October 27, 2007.
  66. Samuel, Jvoan (September 2016). "R179 interior of #3014 in 207th Street Yard". Retrieved September 10, 2016.
  67. "New York City Subway Car Update" (PDF). The Bulletin (April 2016). Electric Railroaders' Association. March 30, 2016. Retrieved March 30, 2016.
  68. "New York City Subway Car Update" (PDF). The Bulletin (April 2016). Electric Railroaders' Association. March 30, 2016. Retrieved March 30, 2016.
  69. Gomez (March 29, 2020). "Train that was set on fire at 110 st RIP Train Operator Goble 🙏🏾🙏🏾🙏🏾 @vinbarone @AliBaumanTV @KatieLusso @clauirizarry" (Tweet). Retrieved April 1, 2020 – via Twitter.
  70. Jose Martinez (March 27, 2020). "Photos obtained by @THECITYNY of this morning's fatal subway fire at the Central Park North-110th Street station the level of destruction" (Tweet). Retrieved March 27, 2020 – via Twitter.
  71. Rivoli, Dan (January 9, 2019). "NYC Transit's new subway cars suffering on the tracks, dozens pulled from rails". New York Daily News. Retrieved January 9, 2019.
  72. Bloomberg, BNN (January 24, 2019). "NYC transit chief slams Bombardier, halts deliveries: 'You have to hold their hands'". BNN. Retrieved January 27, 2019.
  73. "Exclusive: NYC Transit stops Bombardier deliveries until problems fixed". WSAU. Midwest Communications Inc. January 24, 2019. Retrieved January 27, 2019.
  74. Sagas, Second Ave (May 10, 2019). "Bombardier screwed up the rolling stock again. There's a welding defect in the R179 collision pillars. Byford has attestations from Bombardier and NYCT's independent engineering assessment that the trains are safe and within NYCT standards. Byford: "There are no safety risks."". @2AvSagas. Retrieved May 13, 2019.
  75. Goldbaum, Christina (January 8, 2020). "Subway Pulls 300 Cars Over Fears Doors Would Open Between Stops". The New York Times. ISSN 0362-4331. Retrieved January 10, 2020.
  76. "Transcript: New York City Transit President Andy Byford Issues Updated on R179 Suwbay Cars". mta.info. Metropolitan Transportation Authority. January 9, 2020. Retrieved January 9, 2020.
  77. Guse, Clayton. "Out with the new, in with the old as MTA puts 55-year-old cars on A, C, J and Z lines after contractor's latest train screw up". nydailynews.com. Retrieved January 10, 2020.
  78. "MTA | Press Release | NYC Transit | New York City Transit Interim President Sarah Feinberg Launches Investigation into Chambers Street Station Incident". www.mta.info. Retrieved June 3, 2020.
  79. Camacho, Hapul (June 3, 2020). "Sooo the whole back of this train DETATCHED". Twitter. Retrieved June 3, 2020.
  80. "MTA Pulls Subway Car Fleet Out of Service — Days Before NYC Reopens". NBC New York. Retrieved June 3, 2020.

External links

New York City Subway rolling stock
Current
A Division
B Division / SIR
Future
A Division
B Division
  • R268
Retired
(R-type)
IRT (A Division)
IND / BMT (B Division)
Retired
(private operators)
IRT (A Division)
Elevated
Subway
BMT (B Division) / SIR
Elevated
Subway
Experimental
Work trains
Never built
See also: R-type contracts
Category: