Misplaced Pages

Railway electrification in Great Britain: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editNext edit →Content deleted Content addedVisualWikitext
Revision as of 12:32, 1 October 2006 editPickle UK (talk | contribs)11,846 editsm minor structure change← Previous edit Revision as of 12:34, 1 October 2006 edit undoPickle UK (talk | contribs)11,846 editsm 650 to 850 V DC []Next edit →
Line 9: Line 9:
* ] / ] / ] - everything but a few freight branches, ], ], Uckfield branch of the ] and services through Salisbury. * ] / ] / ] - everything but a few freight branches, ], ], Uckfield branch of the ] and services through Salisbury.
* ] - ] to ] - A former main line taken over by the Underground and turned into a tube line. It was however isolated by the abandonment of the 1930s ] programme (and the development of the ]). Tube services were further truncated by the new ] in 1964 (which shortened the northern end of the line). The remainder was handed over to BR in 1975 in conjunction with electrification of ] to allow dual voltage (ie both 25Kv AC Overhead and Third Rail DC) commuter trains into London. A link with the ] was made to enable this. Presumably third rail was chosen as the tunnels were of too narrow a bore to allow overhead lines to be installed (as they are on the Snowhill, Thameslink route.) * ] - ] to ] - A former main line taken over by the Underground and turned into a tube line. It was however isolated by the abandonment of the 1930s ] programme (and the development of the ]). Tube services were further truncated by the new ] in 1964 (which shortened the northern end of the line). The remainder was handed over to BR in 1975 in conjunction with electrification of ] to allow dual voltage (ie both 25Kv AC Overhead and Third Rail DC) commuter trains into London. A link with the ] was made to enable this. Presumably third rail was chosen as the tunnels were of too narrow a bore to allow overhead lines to be installed (as they are on the Snowhill, Thameslink route.)
* ] (]) * ] (]) - A history can be found ]. See also
* ] ? * ] ?
* ] - 630V DC(de-electrified by BR in 1960 then turned into ] ) * ] - 630V DC(de-electrified by BR in 1960 then turned into ] )

Revision as of 12:34, 1 October 2006

40% (3,062 miles / 4,928 km) of the British rail network is electrified and 60% of all rail journeys are by electric traction (both by locomotives and Multiple Units).

Rail based (Third and Fourth rails)

650 to 850 V DC Third rail

An example of third rail

630 V DC Fourth Rail

The Tube's 4th rail system

The Watford DC Line between Queens Park and Harrow & Wealdstone is peculiar in that it is used by both Silverlink Metro trains, designed for 750V third rail, and Bakerloo Line trains designed for 630V third and fourth rail. Consequently the voltage is set at a suitable compromise value around 690V nominal, and the centre rail is at the same potential as the return running rail, whereas in normal London Underground usage the traction supply floats with the centre rail at nominally -230V and the outer rail at nominally +420V. giving 630V overall.

1200 V DC Side Contact rail

  • Manchester Victoria - Bury and (this system was abandoned when the line was converted to become part of the Manchester Metrolink)

Overhead

1500 V DC Overhead

Tyne & Wear Metro is the only current 1500 V DC system in the UK
  • Manchester-Sheffield-Wath line. Known as the Woodhead Route, the line was closed east of Hadfield in 1981 and the remaining section was converted to 25 kV AC in December 1984.
  • Shenfield Metro (Great Eastern Main Line) - converted to 25 kV AC, initially with some sections at 6.25 kV
  • Tyne and Wear Metro - largely over the "Tyneside electrics" routes which had been electrified using a third rail until the 1960s.
  • Newport - Shildon line (closed in the 1930s).

3500 V DC Overhead

  • Holcombe Brook Branch
  • Manchester Victoria - Bury (to Third Rail in 1918)

6600 V (6.6 kV) AC Overhead @25 Hz

6250 V (6.25 kV) AC Overhead @50 Hz

During the initial electrification of parts of the network to 25 kV AC overhead the initial solution to the limited clearance problems in suburban areas (due to numerous tunnels and bridges) - notably London and Glasgow - was to use the lower voltage of 6.25 kV AC Overhead. Latter technological improvements allowed these area to be converted to 25 kV AC Overhead.

25000 (25 kV) AC Overhead @50 Hz

The West Coast Main Line is electrified at 25 kV AC Overhead