Revision as of 19:43, 24 September 2023 editScope creep (talk | contribs)Autopatrolled, Extended confirmed users, Page movers, New page reviewers, Pending changes reviewers143,496 edits Link to Saint-Gilles prison← Previous edit |
Revision as of 19:43, 24 September 2023 edit undoScope creep (talk | contribs)Autopatrolled, Extended confirmed users, Page movers, New page reviewers, Pending changes reviewers143,496 edits link to Saint-Gilles prisonNext edit → |
Line 2: |
Line 2: |
|
{{infobox station|image=File:Albert-metro.jpg|coordinates={{coord|50.82139|4.34194|region:BE_type:railwaystation|display=inline,title}}|type=''Premetro'' station}} |
|
{{infobox station|image=File:Albert-metro.jpg|coordinates={{coord|50.82139|4.34194|region:BE_type:railwaystation|display=inline,title}}|type=''Premetro'' station}} |
|
|
|
|
|
'''Albert premetro station''' is a '']'' (underground tram) station located on the border between the municipalities of ] and ] in ], Belgium. The station is at the crossroad between the Avenue Albert/Albertlaan on the ] and the Chaussée d'Alsemberg/Alsembergsesteenweg between ] and ]. The station is the last stop south of the ], a tram tunnel crossing the ] from Albert to ]. It is on tram routes ] and ] and evening route ]. There is a connection at ground level with tram route ], as well as bus routes 48 and 54. |
|
'''Albert premetro station''' is a '']'' (underground tram) station located on the border between the municipalities of ] and ] in ], Belgium. The station is at the crossroad between the Avenue Albert/Albertlaan on the ] and the Chaussée d'Alsemberg/Alsembergsesteenweg between ] and ]. The station is the last stop south of the ], a tram tunnel crossing the ] from Albert to ]. It is on tram routes ] and ] and evening route ]. There is a connection at ground level with tram route ], as well as bus routes 48 and 54. |
|
|
|
|
|
As ] is built, Albert station will be reconfigured; tram routes 2 and 3 will terminate here.<ref>https://www.brusselstimes.com/342670/how-brussels-is-building-its-next-metro-line</ref> |
|
As ] is built, Albert station will be reconfigured; tram routes 2 and 3 will terminate here.<ref>https://www.brusselstimes.com/342670/how-brussels-is-building-its-next-metro-line</ref> |