Misplaced Pages

Ludington Pumped Storage Power Plant

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

This is an old revision of this page, as edited by Rmhermen (talk | contribs) at 00:56, 28 October 2015 (See also). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Revision as of 00:56, 28 October 2015 by Rmhermen (talk | contribs) (See also)(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Ludington Pumped Storage Plant
Generators of the power plant
CountryUnited States
LocationLudington, Michigan
Coordinates43°53′37″N 86°26′43″W / 43.893611111111°N 86.445277777778°W / 43.893611111111; -86.445277777778
StatusOperational
Construction began1969
Commission date1973
OwnersConsumers Energy
Detroit Edison
Tidal power station
Tidal range
  • 111 m (364 ft)
Power generation
Nameplate capacity1,872 MW
[edit on Wikidata]

The Ludington Pumped Storage Plant is a hydroelectric plant and reservoir in Ludington, Michigan. It was built between 1969 and 1973 at a cost of $315 million and is owned jointly by Consumers Energy and Detroit Edison and operated by Consumers Energy. At the time of its construction, it was the largest pumped storage hydroelectric facility in the world.

Characteristics

It consists of a reservoir 110 feet (34 m) deep, 2.5 miles (4.0 km) long, and one mile (1.6 km) wide which holds 27 billion US gallons (100 Gl) of water. The 1.3-square-mile (3.4 km) reservoir is located on the banks of Lake Michigan. Because impervious bedrock is more than 800 feet (240 m) below the reservoir, the builders had to line the reservoir with a layer of asphalt and clay to prevent water seeping into the ground.

The power plant consists of six reversible turbines that can each generate 312 megawatts of electricity for a total output of 1,872 megawatts. Water is delivered from the upper reservoir to the turbines by six penstocks each 1,100 feet (340 m) long that taper from 28 to 24 feet (8.5 to 7.3 m) in diameter.

At night, during low demand for electricity, the turbines run in reverse to pump water 363 feet (111 m) uphill from Lake Michigan into the reservoir. The plant takes advantage of the natural steep sand dune landform of eastern Lake Michigan. During periods of peak demand water is released to generate power. Electrical generation can begin within two minutes with peak electric output of 1872 MW achieved in under 30 minutes. Maximum water flow is over 33 million US gallons (120,000 m) per minute.

This process was designed to level the load of nearby nuclear power plants on the grid. It also replaces the need to build natural gas peak power plants used only during high demand. The Ludington Pumped Storage plant is connected to six 345-kV Transmission lines, all owned and maintained by METC, a subsidiary of ITC Holdings.

Awards and recognition

This project was given the 1973 award for "Outstanding Civil Engineering Achievement" by the American Society of Civil Engineers.

In 2013, the Pumped Storage Plant celebrated its 40th anniversary, receiving special recognition from both Lansing and Washington for "providing reliable and low-cost power" to Michigan and surrounding areas. Gov. Rick Snyder, Lt. Gov. Brian Calley, Sen. Goeff Hansen and Rep. Ray Franz were among those who signed a special tribute to the project, which was delivered by Rep. Franz personally. With this recognition came the start of its $800 million upgrade, announced previously in February 2007.

Upgrade

Consumers Energy discussed plans in 2008 to extend the life of the facility and upgrade the pumps to increase efficiency by up to 9%. Consumers Energy also planned to tap the wind power resources along the eastern Lake Michigan shore with wind farms. Because wind is an intermittent power source and may inconveniently deliver large amounts of power during periods of low electric demand, pumped storage facilities are desirable to have on the same grid with large-scale wind farms. The available pumped storage capacity, along with the wind characteristics, partly determine the maximum contribution wind power can make to the overall electricity use in a region.

Consumers Energy and Detroit Edison announced an $800 million upgrade on February 7, 2011. The six-year project would begin in 2013 and extend the plant's life by at least forty years and upgrade the generating capacity from 1,872 megawatts to 2,172 megawatts. Plans for the upgrade include replacing all six of the plant's turbines, which would increase the plant's total generating capacity by 15 percent, and efficiency by 5 percent. Upon completion, the plant will produce enough power for a community of 1.65 million (a quarter million increase).

See also

References

  1. Ludington Pumped Storage, ConsumersEnergy.com website.
  2. "Past Outstanding Civil Engineering Achievement Awards". American Society of Civil Engineers.
  3. ^ "Ludington Pumped Storage Plant Recognized For 40 Years Of Service To Customers And Michigan". PR Newswire.
  4. ^ Alexander, Dave (2008-04-12). "Shoreline generates interest in power". The Muskegon Chronicle. Retrieved 2008-10-03.
  5. "Consumers Energy, Detroit Edison announce $800 million upgrade of Ludington Pumped Storage Facility". Ludington Daily News. 2011-02-07. Retrieved 2011-02-08.

External links

Categories: