Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
You can help expand this article with text translated from the corresponding article in Greek. Click for important translation instructions.
Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Greek Misplaced Pages article at ]; see its history for attribution.
You may also add the template {{Translated|el|Αυτοκινητόδρομος 27 (Ελλάδα)}} to the talk page.
Within 2012 tenders were announced for the construction of the 14,5 km section from Florina up to the border crossing with North Macedonia as a motorway. Construction started in 2013 and finished in December 2015. The northern part from Florina to Niki was opened to traffic on 20 May 2016. The section from Ptolemaida to Florina is operational as an expressway (GR-3) and is planned to be upgraded to a motorway sometime until 2025.
Exit list
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. Please consult this guideline for information on how to create one. Please improve this article if you can. (November 2021)