Misplaced Pages

Beaver River Bridge

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Bridge in North Sewickley Township and Big Beaver
Beaver River Bridge
Construction as seen from Homewood in June 2024
Coordinates40°49′N 80°19′W / 40.81°N 80.32°W / 40.81; -80.32
Carries I-76 / Penna Turnpike
CrossesBeaver River
LocaleNorth Sewickley Township and Big Beaver
Official nameBeaver River Bridge
Other name(s)Beaver Valley Bridge
Characteristics
Total length1,546 ft (471 m)
Width56 ft (17 m)
No. of spans5
Clearance below170 ft (52 m)
No. of lanes4
History
Opened1952
Location

The Beaver River Bridge (also called "Beaver Valley Bridge") is a bridge that carries the Pennsylvania Turnpike across the Beaver River in North Sewickley Township, Pennsylvania. Built in 1951 and opened in 1952, the 72-year-old bridge is being replaced with the construction of a new span to its north. The Beaver River Bridge has a total length of 1,546 ft (471 m) and a clearance below of 170 ft (52 m) making it higher than the Delaware River Bridge's 160 ft (49 m) clearance on the PA Turnpike's eastern terminus in Bucks County, but lower than the Hawk Falls Bridge's 190 ft (58 m) clearance on the Pennsylvania Turnpike's Northeast Extension in Carbon County. The Beaver River Bridge is an example of a mid-20th century cantilever deck truss with preservation groups making efforts to save it from demolition as its structural style is becoming rare. About 20,000 vehicles travel across the bridge each day.

Replacement

In 2012, the Pennsylvania Turnpike Commission set aside nearly $300 million to replace the bridge, and began the design phase of its Milepost 12-14 reconstruction project. The project is a part of an ongoing project along the turnpike to widen the road to a minimum of 3 lanes in each direction with larger shoulders and medians. West of the Beaver Valley Interchange, three overhead bridges (a local road bridge and two Norfolk Southern Railway bridges) were replaced to support the widening of the turnpike between 2015 and 2016. Within the Beaver Valley Interchange, an aging ramp bridge was replaced with a temporary span.

The final design of the replacement bridges, completed by Hardesty & Hanover, are two parallel-running beam bridges. Each bridge will carry three 12 ft (3.7 m) travel lanes, one 12 ft (3.7 m) acceleration/deceleration lane for the nearby interchange, and 12 ft (3.7 m) medians and shoulders. The bridge will be 1,645 ft (501 m) long with 5 spans.

The adjacent Beaver Valley Interchange is being reconfigured to a partial cloverleaf interchange from the current trumpet interchange design. Formerly, the interchange had a toll booth in the middle, but was removed when this section of the Turnpike became free in the late 1990s. Additionally, a new bridge for the Pennsylvania Turnpike over PA 18 will be constructed shortly to the north of the existing bridge. The temporary bridge that was constructed for the trumpet interchange will be removed.

Construction began on the new bridge and interchange in January 2023 and is expected to conclude in November 2026.

Bridges of the Beaver River
Upstream
Fifth Avenue Bridge
PA 351
Beaver River Bridge
I-76 / Penna Turnpike
Downstream
Eastvale Bridge
PA 588

See also

References

  1. ^ "Pennsylvania Turnpike Beaver River Bridge". Archived from the original on July 30, 2016. Retrieved October 26, 2016.
  2. ^ Henry, Lowman (1997). "Over the River and Through Penn's Woods". Pennsylvania Turnpike Commission. Archived from the original on December 20, 2013. Retrieved November 8, 2016.
  3. ^ "Turnpike commission eying Beaver River Bridge replacement project". Archived from the original on February 24, 2013. Retrieved October 26, 2016.
  4. ^ "Mileposts 12-14 Total Reconstruction". PTC Construction Sites. Retrieved 2023-05-07.
  5. Fontaine, Tom (2012-02-23). "Turnpike's Beaver River Bridge slated for replacement in 2017". TribLIVE.com. Retrieved 2018-12-29.
  6. "Beaver River Bridge". H&H. 2021-05-13. Retrieved 2023-05-07.
  7. ^ www.shikunusa.com https://www.shikunusa.com/construction/projects/beaver. Retrieved 2023-05-07. {{cite web}}: Missing or empty |title= (help)
Pennsylvania Turnpike Commission
Completed highways
Partially completed highways
Tunnels and bridges
Aborted expansion plans
Historical structures
Tolling systems

40°48′42″N 80°19′08″W / 40.811541°N 80.318996°W / 40.811541; -80.318996

Categories: