Misplaced Pages

Borough Hall/Court Street station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Borough Hall station (IRT Broadway–Seventh Avenue Line)) New York City Subway station in Brooklyn "Borough Hall station" redirects here. For the NJ Transit station, see Glen Rock–Boro Hall station.

New York City Subway station in Brooklyn, New York
 Borough Hall/Court Street "2" train"3" train​​"4" train"5" train​​"R" train
New York City Subway station complex
Station statistics
AddressCourt Street between Joralemon Street & Montague Street
Brooklyn, New York
BoroughBrooklyn
LocaleDowntown Brooklyn, Brooklyn Heights
Coordinates40°41′37″N 73°59′25″W / 40.69361°N 73.99028°W / 40.69361; -73.99028
DivisionA (IRT), B (BMT)
LineBMT Fourth Avenue Line
IRT Broadway–Seventh Avenue Line
IRT Eastern Parkway Line
Services   2  (all times)
​   3  (all except late nights)​
   4  (all times)
​   5  (weekdays only)​
   N  (late nights)
   R  (all times)
​   W  (limited rush hour service only)
Transit
Levels3
Other information
OpenedJuly 1, 1948 (transfer)
AccessibleThis station is partially compliant with the Americans with Disabilities Act of 1990 Partially ADA-accessible (IRT local platforms and northbound IRT express platform only)
Traffic
20236,066,699 Increase 13.7%
Rank32 out of 423
Location
Borough Hall/Court Street station is located in New York City SubwayBorough Hall/Court Street stationShow map of New York City SubwayBorough Hall/Court Street station is located in New York CityBorough Hall/Court Street stationShow map of New York CityBorough Hall/Court Street station is located in New YorkBorough Hall/Court Street stationShow map of New York
Street map

Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times
Stops weekdays during the day Stops weekdays during the day
Stops late nights only Stops late nights only
Stops rush hours only Stops rush hours only
Stops rush hours in the peak direction only Stops rush hours in the peak direction only

The Borough Hall/Court Street station is an underground New York City Subway station complex in Brooklyn shared by the BMT Fourth Avenue Line, the IRT Broadway–Seventh Avenue Line and the IRT Eastern Parkway Line. The complex comprises three stations: Borough Hall on the IRT lines and Court Street on the BMT line. The stations are located under Court, Joralemon, and Montague Streets, next to Brooklyn Borough Hall, in the Downtown Brooklyn and Brooklyn Heights neighborhoods of Brooklyn. It is served by the 2, 4, and R trains at all times; the 3 train all times except late nights; the 5 train on weekdays; the N train during late nights; and limited rush-hour W trains.

The Borough Hall station of the Eastern Parkway Line was built for the Interborough Rapid Transit Company (IRT) as part of the city's first subway line. The station opened on January 9, 1908, when the original IRT was extended into Brooklyn. The Borough Hall station of the Broadway–Seventh Avenue Line opened on April 15, 1919, as part of the Dual Contracts. The Court Street station of the Fourth Avenue Line was built for the Brooklyn Rapid Transit Company (BRT; later the Brooklyn–Manhattan Transit Corporation, or BMT) as part of the Dual Contracts, and opened on August 1, 1920. Several modifications have been made to the IRT and BMT stations over the years, and they were connected within a single fare control area in 1948.

The Eastern Parkway Line station under Joralemon Street has two side platforms and two tracks on the same level. The Broadway–Seventh Avenue Line station under Brooklyn Borough Hall also has two side platforms and two tracks on different levels. The Fourth Avenue Line station has one island platform and two tracks. Part of the complex is compliant with the Americans with Disabilities Act of 1990. The original portion of the Eastern Parkway Line station's interior is a New York City designated landmark and listed on the National Register of Historic Places.

History

First subway

Planning for a subway line in New York City dates to 1864. However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act. The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer. The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900, in which it would construct the subway and maintain a 50-year operating lease from the opening of the line. In 1901, the firm of Heins & LaFarge was hired to design the underground stations. Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.

Several days after Contract 1 was signed, the Board of Rapid Transit Railroad Commissioners instructed Parsons to evaluate the feasibility of extending the subway south to South Ferry, and then to Brooklyn. On January 24, 1901, the Board adopted a route that would extend the subway from City Hall to the Long Island Rail Road (LIRR)'s Flatbush Avenue terminal station (now known as Atlantic Terminal) in Brooklyn, via the Joralemon Street Tunnel under the East River. Contract 2, which gave the IRT a 35-year lease, was executed between the commission and the Rapid Transit Construction Company on September 11, 1902. Construction of the Contract 2 tunnel began at State Street in Manhattan on November 8, 1902. and work on the Joralemon Street Tunnel began in 1903. By July 1907, the Borough Hall station was nearly completed except for the entrances.

Mosaic name tablet and cartouches on the Eastern Parkway Line platform
The Eastern Parkway Line station was the first of the complex's three stations to open.

The Borough Hall station opened on January 9, 1908, as the terminal for the extension of the IRT Lexington Avenue Line from Lower Manhattan. Borough Hall was the first underground subway station in Brooklyn; people waved flags throughout the borough to celebrate the station's opening, and officials celebrated the occasion with a parade and a banquet. Prior to the Borough Hall station's opening, the only rapid transit in Brooklyn had been the Brooklyn Rapid Transit Company (BRT)'s elevated lines, which operated only as far as the Manhattan ends of the Brooklyn Bridge. The opening of the station thus also alleviated congestion on lines that used the Brooklyn Bridge. A temporary switch was installed just west of the station, allowing trains to terminate on the southbound track until the line could be extended. An extension to Atlantic Avenue opened on May 1, 1908, completing the Contract 2 IRT line. Bronze bas-reliefs by William Ordway Partridge were installed at the Borough Hall station in early 1909 to denote the station's status as Brooklyn's first underground subway station.

To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening the platforms at stations along the original IRT subway. As part of a modification to the IRT's construction contracts made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $49.1 million in 2023) spent on platform lengthening, $500,000 (equivalent to $16.4 million in 2023) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent. The northbound platform at the Borough Hall station was extended 125 feet (38 m) to the east, while the southbound platform was extended 140 feet (43 m) to the east. During the construction of the platform extensions, the facade of Brooklyn Borough Hall began to crack because of vibrations from construction equipment. On January 23, 1911, ten-car express trains began running on the East Side Line, and the next day, ten-car express trains began running on the West Side Line.

Dual Contracts

After the original IRT opened, the city began planning new lines. One of these, the Centre Street Loop in Manhattan, was to connect the Brooklyn Bridge, Manhattan Bridge, and Williamsburg Bridge with a new tunnel under the East River. By 1910, the IRT's Borough Hall station was so crowded that residents of Brooklyn Heights, a residential neighborhood west of Borough Hall, wanted a stop to be added on the proposed Centre Street Loop within Brooklyn Heights. At the time, the line was supposed to have a station at Borough Hall, then slope downward under the East River. The Public Service Commission ultimately rejected a proposal for a Brooklyn Heights station because it would have required the tunnels to be built at an extremely steep slope of five percent.

IRT lines

A "3" train arriving at the Borough Hall station of the Broadway-Seventh Avenue Line.
The Broadway–Seventh Avenue Line platforms opened in 1919.

As part of the Dual Contracts, approved in 1913, the New York City Public Service Commission planned to split the original IRT system into three segments: two north-south lines, carrying through trains over the Lexington Avenue and Broadway–Seventh Avenue Lines, and an east–west shuttle under 42nd Street. This would form a roughly H-shaped system. The Broadway–Seventh Avenue Line would split into two branches south of Chambers Street, one of which would turn eastward through Lower Manhattan, run under the East River via a new Clark Street Tunnel, and connect with the existing Contract 2 IRT Brooklyn Line at Borough Hall. The IRT was authorized to construct a station at Borough Hall. The line's Borough Hall station was a two-level station, with a connection to the existing Eastern Parkway Line station; the double-deck arrangement was required because the eastbound track had to pass under the existing line. To minimize disruption at street level, the line was excavated using cast-iron tunneling shields, typically used for underwater tunnels, rather than via the cut-and-cover method used elsewhere in the system. Entrances were planned along Fulton Street (now Cadman Plaza West) at Montague Street and at Myrtle Avenue.

Construction of the Clark Street Tunnel began in 1914, but the section of the line under Fulton Street was delayed by disputes over the demolition of part of the Fulton Street elevated line. By January 1919, the tracks for the Broadway–Seventh Avenue Line were completed, but signals and station finishes were still being installed. The IRT decided to push forward the tunnel's opening after learning that BRT workers might go on strike. On April 15, 1919, the Clark Street Tunnel opened, and the Broadway–Seventh Avenue Line's Borough Hall station opened with it, extending West Side Line express trains from Wall Street on the other side of the East River to Atlantic Avenue. The connection doubled the number of IRT trains that could travel between Manhattan and Brooklyn, and it eased congestion in the Joralemon Street Tunnel, the only other tunnel carrying IRT trains between the two boroughs. Direct express service to Times Square was provided to the inhabitants of Brooklyn for the first time as a result; trains through the Joralemon Street Tunnel made express stops in Manhattan, skipping Times Square.

In 1920, a new entrance at the northwestern corner of Joralemon Street and Court Street was completed. That year, the Eastern Parkway Line was extended east of Atlantic Avenue. The Joralemon Street Tunnel services, which had previously served all stops on the Eastern Parkway Line, became express services, while the Broadway–Seventh Avenue Line services ran local on the Eastern Parkway Line. Although the Eastern Parkway Line's express tracks already existed, they previously had been used only for storage. The tracks were reconfigured so that Eastern Parkway express trains could no longer stop at the Hoyt Street station, the next stop east.

BRT line

Also planned under the Dual Contracts was the Broadway Line and Fourth Avenue Line of the BRT (after 1923, the Brooklyn–Manhattan Transit Corporation or BMT). Under the Dual Contracts, the Whitehall–Montague Street route was to be built, connecting the Broadway Line in Manhattan and the Fourth Avenue subway under the Flatbush Avenue Extension to the west of the DeKalb Avenue station. The BRT was authorized to construct a station on the Whitehall–Montague Street route at the intersection of Montague and Court Streets. The Court Street station was to be built at the eastern end of the Montague Street Tunnel, a pair of tubes carrying the BRT line under the East River. Because of the station's depth, there would be elevators ascending to Clinton Street at its western end. The eastern end was to contain stairs and escalators leading directly to Court Street and to the IRT Broadway–Seventh Avenue Line station. A ramp extending west to Henry Street was also proposed but not built. This ramp was proposed as a compromise when the Public Service Commission had rejected plans for a second station in Brooklyn Heights.

Construction of the Montague Street Tunnel's two tubes began in 1914. The north tube of the tunnel was holed through on June 2, 1917, followed by the south tube on June 20, 1917. Service via the Montague Tunnel began on August 1, 1920, with the opening of the Court Street station. The Court Street station was one of three subway stations to open in Brooklyn Heights; the other two were Clark Street on the IRT Broadway–Seventh Avenue Line and High Street on the Independent Subway System (IND)'s Eighth Avenue Line. The BRT, along with the IRT and the city government, shared control of the Borough Hall/Court Street station.

Later modifications

1920s to 1960s

A northbound R train leaving the Court Street BMT station

In 1922, the New York State Transit Commission directed its engineers to prepare plans for lengthening the platforms at 23 stations on the BMT's lines to accommodate eight-car trains. As part of the project, platforms would be lengthened to 530 feet (160 m). Though the Transit Commission ordered the BMT to lengthen these platforms in September 1923, no further progress was made until February 16, 1925, when the New York City Board of Transportation (BOT) commissioned its engineers to examine platform-lengthening plans for Court Street and eleven other stations along the Fourth Avenue Line. It estimated the project would cost $633,000 (equivalent to $10,998,000 in 2023). The New York City Board of Estimate appropriated $362,841 for the lengthening of the platforms at Court Street and five other stations in January 1926 and awarded the contract to Charles Meads & Company early the next month. The platform extension at Court Street opened on August 1, 1927.

The city government took over the BMT's operations on June 1, 1940, and the IRT's operations on June 12, 1940. As part of a Works Progress Administration program, the IRT entrance at Cadman Plaza and Montague Street was integrated into a neighboring park in late 1940. The New York City Board of Transportation also renovated the station's bathrooms in 1947 as part of a larger initiative to upgrade bathrooms throughout the subway system. Transfer passageways between the three stations were placed inside fare control on July 1, 1948. During the Cold War, the city government proposed constructing a passageway between the IRT's Borough Hall station and the IND's Jay Street–Borough Hall station under Myrtle Avenue, which would have doubled as an air-raid shelter. The passageway and other shelters in the New York City Subway system would have cost $15 million; the federal government would have paid half, and the city and state government would have paid the other half.

The Board of Transportation announced plans in November 1949 to extend platforms at several IRT stations, including the Eastern Parkway/Lexington Avenue Line platforms at Borough Hall, to accommodate all doors on ten-car trains. Although ten-car trains already operated on the line, the rear car could not open its doors at the station due to the short platforms. Funding for the platform extensions was included in the city's 1950 capital budget. During the 1964–1965 fiscal year, the IRT platforms at Borough Hall were lengthened to 525 feet (160 m) to accommodate a ten-car train of 51-foot (16 m) IRT cars. The work was undertaken by the Arthur A. Johnson Corporation. In the late 1960s, New York City Transit extended the Fourth Avenue Line platform about 85 feet (26 m) to the west, allowing it to accommodate ten 60-foot (18 m) cars.

1970s to 1990s

Mosaic name tablet

The Metropolitan Transportation Authority (MTA) had proposed renovating the Borough Hall station as early as its 1975–1979 capital plan. In 1976, with funding from the Exxon Corporation, the Broadway–Seventh Avenue Line station, as well as three others citywide, received new "artfully humorous graffiti" murals and artwork. Local designer Samuel Lebowitz received $5,000 to "improve the level of lighting in an exciting and light hearted way." Some "multicolored animated neon signs" were placed underneath transparent plastic screens; such signs included "an abstract eye that winks every five seconds" and another that looked to be "blow smoke rings." The agency closed one of the station's token booths in 1977 to save money, although the booth was reopened shortly afterward. In 1979, the New York City Landmarks Preservation Commission designated the space within the boundaries of the original Eastern Parkway Line station, excluding expansions made after 1904, as a city landmark. The station was designated along with eleven others on the original IRT.

A renovation of the Eastern Parkway Line station took place in the early 1980s as part of the MTA's Adopt-a-Station program. MTA chairman Richard Ravitch announced in October 1981 that these platforms would be renovated with funding from the Subway Committee for the Brooklyn Downtown Commercial Crescent, a local civic group. The Brooklyn Union Gas Company raised $25,000, while other businesses raised another $25,000; the Urban Mass Transportation Administration (UMTA) provided a matching grant of $50,000. The MTA also provided $3.5 million for the project as part of its 1980–1984 capital program. In 1982, the UMTA gave a $66 million grant to the New York City Transit Authority, part of which was allocated for the renovation of several subway stations, including Borough Hall's IRT platforms.

Work on the project had begun by 1983 but had fallen behind schedule two years later. One of the issues was that the MTA had wanted to save the original tiles in the Eastern Parkway Line station, a designated New York City landmark, but the agency could not get the tiles to stick to the wall. New tiles had to be imported from Czechoslovakia, and some tiles were stolen before they could be installed. Some newly-renovated parts of the station were already deteriorating by 1987, such as tiled floors that had come loose. Other parts of the renovation had been conducted haphazardly, such as the uneven installation of gray wall tiles, as well as a ceiling that had been repainted above the platforms but not the tracks. At that point, it had taken nearly as long to renovate the station as to construct the original line. The New York City Transit Authority eventually filed a lawsuit to compel the renovation contractor to complete the project. The rest of the complex was also slated to be renovated, but the improvements were temporarily delayed in 1987 because of the poor quality of the Eastern Parkway Line station's renovation. MTA officials diverted funding for the other platforms' renovations in December 1989 to cover a budget shortfall.

In the early 1990s, the BMT station's columns were repainted "Newport green" to match the mosaic tiles as part of a systemwide repainting program. Workers were installing elevators at the Borough Hall IRT stations by 1992, as part of the MTA's plan to make dozens of "key stations" accessible to passengers with disabilities. The work was finished by the next year. Most of the IRT portion of the complex became wheelchair-accessible, except for the eastbound Eastern Parkway Line platform. The subway entrance at Clinton Street was converted into a part-time entrance in 1994, after the removal of high entry-exit turnstiles at the entrance. The escalators to the BMT station were replaced in 1997; the repair project was delayed by two months after several dozen escalator steps were stolen. Even after the repairs were completed, the escalators continued to experience periodic outages.

2000s to present

The original Eastern Parkway Line station's interiors were listed on the National Register of Historic Places in 2004. In June 2018, part of the Eastern Parkway Line station's ceiling collapsed, injuring a passenger. The collapse of the 100-year-old ceiling necessitated $8.3 million in emergency repairs. Prior to the ceiling collapse, neither the MTA nor the New York City Department of Transportation had identified the Borough Hall station as a "priority" station requiring renovation. An internal report, released in late 2019, found that the staff sent to inspect the station verified the defect existed in 2017, but underestimated its severity due to a lack of expertise in terracotta ceilings, nor was the issue escalated to engineers who were familiar with terracotta. The MTA report suggested that special care be taken in the inspection of the thirteen subway stations that have terracotta ceilings due to the different properties when compared to concrete or steel.

The IRT station's existing elevators were closed for replacement for several months starting in July 2020. The two elevators at the western end of the BMT's Court Street station were also replaced starting in 2022, requiring the closure of the exit at Clinton Street; this was part of a program to replace elevators across the subway system. In November 2022, the MTA announced that it would award a $106 million contract for the installation of additional elevators at the Borough Hall station complex. The project would make the Eastern Parkway Line platforms fully accessible. The contract included one elevator from the mezzanine to either of the Eastern Parkway Line platforms, as well as one elevator from the mezzanine to the street. As of March 2023, work was scheduled to begin in the middle of that year and be completed in 2025. New York City councilmember Lincoln Restler founded a volunteer group, the Friends of MTA Station Group, in early 2023 to advocate for improvements to the Borough Hall station and four other subway stations in Brooklyn. The BMT elevators at Clinton Street reopened in June 2023. The BMT platform also received structural and visual upgrades, which were completed in January 2024.

Service history

IRT stations

Initially, the Eastern Parkway Line station was served by express trains along both the West Side (now the Broadway–Seventh Avenue Line to Van Cortlandt Park–242nd Street) and East Side (now the Lenox Avenue Line). The express trains, running to Atlantic Avenue, had their northern terminus at 242nd Street or West Farms (180th Street). Lenox local trains to 145th Street served the station during late nights. The Lexington Avenue Line north of Grand Central–42nd Street opened on August 1, 1918, and all Eastern Parkway Line services were sent via the Lexington Avenue Line. The Broadway–Seventh Avenue Line's Brooklyn branch carried the express services to 242nd Street or via the Lenox Avenue Line when the Clark Street Tunnel opened in 1919 (express service to 242nd Street was eliminated in 1959). To the south, trains ran to Flatbush Avenue or Utica Avenue starting in 1920 and to New Lots Avenue starting in 1924.

The IRT routes were given numbered designations in 1948 with the introduction of "R-type" rolling stock, which contained rollsigns with numbered designations for each service. The 2, 3, 4, and 5 trains were given their present designations at that time. The Broadway–Seventh Avenue Line services became the 2 and 3, and the Lexington Avenue/Eastern Parkway Line services became the 4 and 5.

BMT station

The Court Street BMT station opened when the Montague Street Tunnel opened on August 1, 1920, Broadway Line trains to Brooklyn could either use the tunnel, stopping at Court Street and five other stations in Lower Manhattan and Downtown Brooklyn, or use the Manhattan Bridge, which skipped all of these stations. Initially, Court Street was served by Fourth Avenue Line local trains (labeled as the BMT 2), Brighton Beach Line express trains (the BMT 1), and some rush-hour West End Line trains (the BMT 3). Brighton express trains were later rerouted to the Manhattan Bridge, while Brighton locals started using the tunnel. After the BMT Nassau Street Line was completed in 1931, West End trains via the Montague Street Tunnel started using the Nassau Street Line instead of the Broadway Line in Manhattan.

The opening of the Chrystie Street Connection in 1967 resulted in drastic changes to the services that stopped at the Court Street station. The RR (later the R) and the QJ began using the Montague Street Tunnel, running via Court Street; the QJ was replaced by the M in 1973. After the Manhattan Bridge was closed for repairs in 1986, all off-peak N trains began running through the Montague Street Tunnel and serving Court Street. Starting in December 1988, N and R trains ran through the tunnel and the Whitehall Street station at all times. When the Manhattan Bridge reopened in February 2004, the R train began serving the station at all times except late nights, while the N train only served the station at night. The M train stopped serving the station when it was rerouted to Midtown Manhattan in 2010. When the Montague Street Tunnel closed for repairs in August 2013, weekday R service was divided into two segments; the Court Street station was the northern terminus of the Brooklyn segment. The R train did not serve the station on weekends, and the N train did not stop there at all, until regular service resumed in September 2014.

Station layout

Ground Street level Exit/entrance
Mezzanine Fare control, station agent
Disabled access Elevator in front of Supreme Court Building at Court Street and Montague Street for "2" train "3" train and northbound "4" train "5" train
Basement 2
Upper IRT platforms
Northbound local "2" train toward Wakefield–241st Street (Clark Street)
"3" train toward Harlem–148th Street (Clark Street)
Side platform Disabled access
Side platform Disabled access
Northbound express "4" train toward Woodlawn (Bowling Green)
"5" train weekdays toward Eastchester–Dyre Avenue or Nereid Avenue (Bowling Green)
Southbound express "4" train toward Crown Heights–Utica Avenue (New Lots Avenue late nights) (Nevins Street)
"5" train weekdays toward Flatbush Avenue–Brooklyn College (Nevins Street)
Side platform
Basement 3
Lower IRT
platform
Southbound local "2" train toward Flatbush Avenue–Brooklyn College (Hoyt Street)
"3" train toward New Lots Avenue (Hoyt Street)
Side platform Disabled access
Basement 4
BMT platform
Northbound "R" train toward Forest Hills–71st Avenue (Whitehall Street–South Ferry late nights) (Whitehall Street–South Ferry)
"N" train toward Astoria–Ditmars Boulevard late nights (Whitehall Street–South Ferry)
"W" train toward Astoria–Ditmars Boulevard (select weekday trips) (Whitehall Street–South Ferry)
Island platform
Southbound "R" train toward Bay Ridge–95th Street (Jay Street–MetroTech)
"N" train toward Coney Island–Stillwell Avenue late nights (Jay Street–MetroTech)
"W" train toward 86th Street (select weekday trips) (Jay Street–MetroTech)
Metrically accurate station map showing tracks, platforms, mezzanines, stairs, elevators, escalators, exits, ticket machines, gates, benches, and trashcans.

The complex is composed of three stations that are all connected within a single fare control area. The IRT Eastern Parkway Line station has two tracks and two side platforms and runs east–west under Joralemon Street. The IRT Broadway–Seventh Avenue Line station has two tracks and two side platforms that are stacked above each other, and it runs roughly northwest to southeast under Cadman Plaza and Borough Hall. The BMT Fourth Avenue Line station has two tracks and one island platform running east–west under Montague Street. Both Broadway–Seventh Avenue Line platforms are fully accessible under the Americans with Disabilities Act of 1990 (ADA). The northbound Eastern Parkway Line platform is ADA-accessible via the passageway connecting with the northbound Broadway–Seventh Avenue Line platform. However, the southbound Eastern Parkway Line platform and the Fourth Avenue Line platform are not ADA-accessible. Accessibility for the southbound Eastern Parkway Line platform was proposed in February 2019 as part of the MTA's "Fast Forward" program.

At the mezzanine level are three overpasses above the center of the Eastern Parkway Line platforms. The outer two overpasses have two fare control areas, one each on the north and south sides. The middle overpass is a passageway connecting the unpaid areas on the north and south sides, and has no access to the platforms. The central mezzanine has two bronze plaques commemorating the subway's arrival in Brooklyn: a plaque to the PSC on the west and a plaque celebrating the station's opening on the east. These plaques, measuring 6 by 2 feet (1.83 by 0.61 m), were designed by Partridge and originally placed on the southbound platform. The plaques are installed within mosaic tablets with swag and floral designs. A fourth overpass is at the extreme west end of the Eastern Parkway Line platforms. The eastern end of the northbound Eastern Parkway Line platform has a passageway leading to the southern end of the northbound Broadway–Seventh Avenue Line platform.

At the northern end of the Broadway–Seventh Avenue Line station is another mezzanine above the upper platform level, leading to exits on Court Street as well as to the Fourth Avenue Line platform. An escalator leads from the lower platform level to the mezzanine. The unpaid areas are on the southeastern side of this mezzanine.

Staircases throughout the station have signs instructing passengers to keep to one side when going up or down.

The Fourth Avenue Line platform is the deepest in the complex, under both sets of IRT platforms. Two stairs rise from the eastern end of the Fourth Avenue Line station to an intermediate mezzanine, where escalators and stairs lead to a mezzanine above the Broadway–Seventh Avenue Line platforms. There is another exit at the extreme western end. A stair rises to a landing above the platform, where two elevators go up to the western BMT mezzanine. The mezzanine has a part-time turnstile bank and customer assistance booth. Full height turnstiles provide entrance/exit from the mezzanine at all times.

Exits

The main fare control for the IRT Broadway–Seventh Avenue Line and BMT Fourth Avenue Line platforms is at the west end of the platforms. Outside fare control, two staircases ascend to the southeast corner of Court and Montague Streets, and a staircase and elevator ascend to Columbus Park, the entrance plaza of Brooklyn Borough Hall, on the east side of Court Street. The design of the elevator resembles that of the ornate entrance kiosks in the original IRT subway. These entrances also serve the U.S. Bankruptcy Court within the Federal Building and Post Office to the north, as well as a New York Supreme Court courthouse to the east. Historically, there was also an exit to a bank on the northern side of Montague Street.

The main fare control for the IRT Eastern Parkway Line platforms is at the center of the station and is staffed. On the northbound side, the overpasses have full height turnstiles leading to two staircases, one each flanking Brooklyn Borough Hall's main entrance on the northeast corner of Court and Joralemon Streets. The stairs flanking Borough Hall retain cast-iron hoods atop granite bases, which are part of the original design. The Borough Hall station is one of two stations to retain such hoods, the other being the Wall Street station in Manhattan. On the southbound side, the overpasses have small turnstile banks, leading to a token booth and two staircases, going up to the southeast corner of Court and Joralemon Streets. The banisters on these staircases are made of concrete since they are outside the Brooklyn Municipal Building. The mezzanine has a large set of doors leading into the Municipal Building (this entrance was closed in February 1996 due to security concerns), and a now-defunct bank teller window. On the northwest corner of the mezzanine, a passage led to Borough Hall.

The secondary fare control area for the IRT Eastern Parkway Line is at the extreme west end and is unstaffed. Outside fare control, there is a token booth. Past the booth, one stair each goes up to the northwest and southwest corners of Court and Joralemon Streets. Prior to 1961, there were two additional entrances to the southwest corner of the intersection. These entrances are within one block of the Generoso Pope Athletic Complex of St. Francis College.

The unstaffed fare control area for the BMT Fourth Avenue Line is at the extreme west end. Outside fare control, one stair each goes to the northwest and southwest corners of Livingston and Court Streets. The northwest staircase has an antique "SUBWAY" white and green globe sign since it is in the front yard of St. Ann's and Holy Trinity Church (the mezzanine has a mosaic sign with the church's name on it). The southwest staircase is next to the basement entrance of a daycare. The First Unitarian Church of Brooklyn, Brooklyn Historical Society, Brooklyn Trust Company Building, and Saint Ann's School are located within one block of these entrances.

Elevator kiosk, serving the IRT Broadway–Seventh Avenue Line and the northbound platform of the IRT Eastern Parkway Line.Entrance in front of Brooklyn Borough HallFormer entrance to the Brooklyn Municipal Building

IRT Broadway–Seventh Avenue Line platforms

 Borough Hall "2" train"3" train
New York City Subway station (rapid transit)
Northbound R62 3 train arriving
Station statistics
DivisionA (IRT)
Line   IRT Broadway–Seventh Avenue Line
Services   2  (all times)
​   3  (all except late nights)
StructureUnderground
Levels2
Platforms2 side platforms (1 on each level)
Tracks2 (1 on each level)
Other information
OpenedApril 15, 1919; 105 years ago (1919-04-15)
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible
Opposite-
direction
transfer
Yes
Services
Preceding station New York City Subway New York City Subway Following station
Clark Street2  ​3 via 135th Street Hoyt Street2  ​3 via Franklin Avenue–Medgar Evers College
Track layout

Legend
to Clark Street
Superimposed tracks
(right track above left)
to Hoyt Street
Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times
Stops weekdays during the day Stops weekdays during the day
Stops weekdays and weekday late nights Stops weekdays and weekday late nights

The Borough Hall station on the IRT Broadway–Seventh Avenue Line is a double-level station with two tracks in a split platform configuration. Southwest of each track is a side platform; northbound trains use the upper level while southbound trains use the lower one. The 2 train stops here at all times, while the 3 train stops here at all times except late nights. On both routes, the Borough Hall station is located between the Clark Street station to the north and the Hoyt Street station to the south.

At the eastern end of both platforms, a staircase from the lower level goes up to the upper level, near the passageway to the northbound IRT Eastern Parkway Line platform. At the western end of both platforms, a staircase from the lower level goes up to the upper level before another staircase goes up to a mezzanine. The lower level also has an up-only escalator that bypasses the upper level, leading directly to the mezzanine. An elevator connects both platforms to the upper mezzanine.

East of the platforms, the southbound Broadway–Seventh Avenue Line track crosses diagonally about 18 feet (5.5 m) below both of the Eastern Parkway tracks, then curves eastward and slopes up to the level of the Eastern Parkway Line near Smith Street. Both become the local tracks for the line. The Broadway–Seventh Avenue Line's connection to the Eastern Parkway Line was built as part of the original subway line but was not used until the opening of the Clark Street Tunnel. The local tracks of the line were originally planned to travel north under what is now Cadman Plaza West to the Brooklyn Bridge.

Both platforms have their original IRT trim line and name tablets reading "BOROUGH HALL" in a serif lettering style. Tablets showing images of Borough Hall are located at regular intervals on the trim line. Dark blue I-beam columns line both platforms at regular intervals with alternating ones having the standard black station name plate in white lettering.

IRT Eastern Parkway Line platforms

 Borough Hall "4" train"5" train
New York City Subway station (rapid transit)
View from northbound platform
Station statistics
DivisionA (IRT)
LineIRT Eastern Parkway Line
Services   4  (all times)
​   5  (weekdays only)
StructureUnderground
Platforms2 side platforms
Tracks2
Other information
OpenedJanuary 9, 1908; 116 years ago (1908-01-09)
AccessibleThis station is partially compliant with the Americans with Disabilities Act of 1990 Partially ADA-accessible; rest of station currently undergoing renovations for ADA access (northbound only; southbound accessibility under construction)
Opposite-
direction
transfer
Yes
Services
Preceding station New York City Subway New York City Subway Following station
Bowling Green4  ​5 via 138th Street–Grand Concourse
Express
Nevins Street4  ​5 via Franklin Avenue–Medgar Evers College
Track layout

Legend
to Bowling Green
to Nevins Street
Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times
Stops weekdays during the day Stops weekdays during the day

Borough Hall Subway Station (IRT)
U.S. National Register of Historic Places
New York City Landmark No. 1096
MPSNew York City Subway System MPS
NRHP reference No.04001022
NYCL No.1096
Significant dates
Added to NRHPSeptember 17, 2004
Designated NYCLOctober 23, 1979

The Borough Hall station on the IRT Eastern Parkway Line has two tracks and two side platforms on the same level. The 4 train stops here at all times, while the 5 train stops here at all times except late nights and weekends. On both routes, the Borough Hall station is located between the Bowling Green station to the north and the Nevins Street station to the south.

The platforms were originally 350 feet (110 m) long, like at other Contract 2 stations, but were lengthened to 520 feet (160 m) by 1964. Two staircases from each platform lead to each of the two overpasses at the center of the station, while one staircase from each platform leads to the overpass at the extreme west end. The eastern end of the northbound platform connects with the passageway leading from the northbound Broadway-Seventh Avenue Line platform. The original portion of the station is a New York City designated landmark and is listed on the National Register of Historic Places.

East of this station, the two tracks become the express tracks of the IRT Eastern Parkway Line and the two tracks of the IRT Broadway–Seventh Avenue Line become the local tracks. Originally, a set of switches between Borough Hall and Hoyt Street connected the express tracks to the local tracks. The roof of the tunnel above the switches was supported by girders weighing 18 short tons (16 long tons; 16 t) and measuring 52 feet (16 m) wide. The switches have since been removed.

Design

As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method. The tunnel is covered by a U-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than 4 inches (100 mm) thick. Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The platforms contain green I-beam columns, spaced every 15 feet (4.6 m). Additional columns between the tracks, spaced every 5 feet (1.5 m), support the jack-arched concrete station roofs. The ceiling height varies based on whether there are utilities in the ceiling. There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.

The walls along the platforms consist of a pink marble wainscoting on the lowest part of the wall, with bronze air vents along the wainscoting, and white glass tiles above. The platform walls are divided at 15-foot (4.6 m) intervals by green and rose pilasters, or vertical bands, with brown and buff-colored swags. In the original portion of the station, each pilaster is topped by blue, green, and yellow faience plaques with the letters "BH". White-on-green tile plaques with the words "Borough Hall", containing red, green, blue, buff, violet, and pink mosaic borders, are also placed on the walls. The platform extensions contain similar decorative elements. The ceilings contain plaster molding. At the extreme east end of the platforms, where the platforms were extended, the walls have a brown trim line on beige tiles with "BOROUGH HALL" in white sans serif lettering.

BMT Fourth Avenue Line platform

 Court Street "R" train
New York City Subway station (rapid transit)
Platform view
Station statistics
DivisionB (BMT)
LineBMT Fourth Avenue Line
Services   N  (late nights)
   R  (all times)
​   W  (limited rush hour service only)
StructureUnderground
Platforms1 island platform
Tracks2
Other information
OpenedAugust 1, 1920; 104 years ago (1920-08-01)
AccessibleThe mezzanine is compliant with the Americans with Disabilities Act of 1990, but the platforms are not compliant ADA-accessible to mezzanine only; platforms are not ADA-accessible
Opposite-
direction
transfer
Yes
Services
Preceding station New York City Subway New York City Subway Following station
Whitehall Street–South FerryN  R  ​W toward Forest Hills–71st Avenue
Local
Jay Street–MetroTechN  R  ​W toward Bay Ridge–95th Street
Non-revenue services and lines
Preceding station New York City Subway New York City Subway Following station
Broad StreetNassau St no service  
Track layout

Legend
to Whitehall St–South Ferry
to Jay Street–MetroTech
Station service legend
Symbol Description
Stops all times Stops all times
Stops late nights only Stops late nights only
Stops rush hours only Stops rush hours only
Stops rush hours in the peak direction only Stops rush hours in the peak direction only

The Court Street station on the BMT Fourth Avenue Line has two tracks and one island platform. R trains serve the station at all times; some rush-hour W trains stop here; and N train stops here during late nights. The next station to the north is Whitehall Street in Manhattan, while the next station to the south is Jay Street–MetroTech.

A single staircase from the western end of the platform goes up to the elevators to the western BMT mezzanine. Two staircases from the eastern end of the platform go up to the escalators and stairs to the IRT passageway.

West of the station, the line goes through the Montague Street Tunnel under the East River to connect to the BMT Broadway Line and the BMT Nassau Street Line. All trains use the Broadway Line connection, which goes to Whitehall Street. The latter connection, to the Broad Street station, was last used by the M train in June 2010 before it was rerouted.

Since the tunnel descends to go underneath the East River, it was constructed with a deep-bore tunnel, making both track walls curved. The walls also still have their original Dual Contracts mosaic tablets and trim line. The name tablets have "COURT ST." in serif lettering, and tablets showing scenes of Borough Hall are located along the trim line at regular intervals. The western end (railroad north) of the walls is plain white. Yellow I-beam columns line both sides of the island platform at regular intervals with alternating ones having the standard black station name plate in white lettering.

Surface connections

When the original IRT station opened in 1908, there was a transfer to the Putnam Avenue and Halsey Street trolley line. Since 1898, a trolley loop had run in front of Borough Hall and along Fulton Street (Cadman Plaza West) and Court Street, but BRT officials expected that the loop would become congested with the construction of the Dual Contracts subway stations. In May 1914, a second loop on nearby Johnson Street opened. Passengers on lines that used the Borough Hall loop, Court Street, or Fulton Street could transfer to the entrance of this station complex bounded by those two streets and the loop, north of Borough Hall.

On April 7, 1930, the BMT eliminated the loop to relieve congestion. Several lines were moved to a loop that traveled north along Adams Street, west along Myrtle Avenue, and southeast along Fulton Street (Cadman Plaza West). Other routes continued west along Livingston Street, north on Court Street, east on Joralemon and Fulton Street, and south on Boerum Place before turning back east along Livingston Street. All streetcar lines in Brooklyn were ultimately discontinued by 1956. Numerous bus lines serve the station as of 2023, namely the B25, B26, B38, B41, B45, B52, B57, B61, B63 and B103.

Notes

  1. Fulton Street formerly extended north from the intersection of Court Street and Montague Street. In 1959, the section north of Montague Street was renamed Cadman Plaza West.

References

  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ "Brooklyn Bus Map" (PDF). Metropolitan Transportation Authority. October 2020. Retrieved December 1, 2020.
  3. ^ "Transfer Points Under Higher Fare; Board of Transportation Lists Stations and Intersections for Combined Rides". The New York Times. June 30, 1948. p. 19. ISSN 0362-4331. Archived from the original on June 25, 2020. Retrieved April 21, 2020.
  4. ^ "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  5. ^ Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  6. ^ "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Archived (PDF) from the original on September 21, 2020. Retrieved November 19, 2019.
  7. Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  8. Report of the Board of Rapid Transit Railroad Commissioners For And In The City of New York Up to December 31, 1901. Board of Rapid Transit Railroad Commissioners. 1902. Archived from the original on February 5, 2023. Retrieved January 5, 2021.
  9. ^ Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  10. "Statistics of East River Tunnel". The Brooklyn Daily Eagle. January 9, 1908. p. 26. Retrieved January 1, 2021 – via newspapers.com.
  11. ^ "Comprehensive Scope of Subway and Tunnel Work, Which Is Now in Its Last Stages". The Brooklyn Daily Eagle. July 7, 1907. p. 9. Archived from the original on May 20, 2023. Retrieved May 20, 2023 – via newspapers.com.
  12. "Construction of the Tunnel Presented Difficult Problems". The Brooklyn Daily Eagle. January 9, 1908. pp. 26, 27.
  13. "Brooklyn Joyful Over Its Tunnel". The New York Times. January 10, 1908. Archived from the original on March 28, 2022. Retrieved March 6, 2010.
  14. ^ "Bronze Tablet for Subway Station at Borough Hall". New-York Tribune. January 22, 1909. p. 12. ISSN 1941-0646. ProQuest 572118349.
  15. "Battery Subway Open: Trains Go to Brooklyn Beginning of New Service Marked by Celebration to-day". New-York Tribune. January 9, 1908. p. 3. ISSN 1941-0646. ProQuest 572082004.
  16. ^ "Subway to Brooklyn Opened for Traffic; First Regular Passenger Train Went Under the East River Early This Morning". The New York Times. January 9, 1908. ISSN 0362-4331. Archived from the original on July 26, 2018. Retrieved May 19, 2023.
  17. "By Subway to Brooklyn". New-York Tribune. January 9, 1908. p. 6. ISSN 1941-0646. ProQuest 572059701.
  18. "B.R.T. Earnings Will Not Be Much Affected by Tunnel: What Falling Off in Earnings There May Be by Interborough's Entrance Will Soon Be Made Up. Company Has Such Difficulty in Keeping Pace With Borough's Growth That Some Relief Should Be Welcomed Problem of Handling Traffic at Borough Hall Not Solved Either by Company or Negligent City Authorities". The Wall Street Journal. January 9, 1908. p. 2. ISSN 0099-9660. ProQuest 129189236.
  19. "Relieves Bridge Jam: New Subway to Brooklyn a Boon in the Rush Hours. Carries 27,000 in 81 Minutes Rapid Transit Company Reduces Its Trains on the Bridge at That Time for an Experiment, and Finds That Cars Are Less Crowded Even With the Lessened Service – Rejoicing in Borough". The Washington Post. January 10, 1908. p. 5. ISSN 0190-8286. ProQuest 144899550.
  20. "Signaling of the East River Tunnels, New York". Railroad Gazette. Vol. 44, no. 2. February 28, 1908. p. 283. ProQuest 895747359.
  21. Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1908. New York State Public Service Commission. 1908.
  22. "Brooklyn Joyful Over New Subway; Celebrates Opening of Extension With Big Parade and a Flow of Oratory". The New York Times. May 2, 1908. ISSN 0362-4331. Archived from the original on March 26, 2022. Retrieved January 5, 2021.
  23. ^ "Tablet in Borough Hall Subway Station, Designed by William Ordway Partridge". The Brooklyn Daily Eagle. March 31, 1909. p. 1. Retrieved May 19, 2023 – via newspapers.com.
  24. ^ Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  25. ^ Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911. Archived from the original on February 5, 2023. Retrieved January 8, 2021.
  26. "Borough Gossip: Cracks in Courthouse Alarm Downtown Population". New-York Tribune. March 20, 1910. p. B8. ISSN 1941-0646. ProQuest 572314917.
  27. "Ten-car Trains in Subway to-day; New Service Begins on Lenox Av. Line and Will Be Extended to Broadway To-morrow". The New York Times. January 23, 1911. ISSN 0362-4331. Archived from the original on April 5, 2018. Retrieved April 5, 2018.
  28. "Subway Loop Approved; Will Have Four Tracks". The New York Times. January 26, 1907. p. 16. ISSN 0362-4331. Archived from the original on July 18, 2018. Retrieved August 1, 2019.
  29. "Subway Loop Assured: Four-track Bridge Link Estimate Board Approves—cost, $5,000,000—ready in 2 1–2 Years". New-York Tribune. January 26, 1907. p. 1. ISSN 1941-0646. ProQuest 571760875.
  30. "Brooklyn Heights Subway; Residents There Want a Connection with the Bridge Loop System". The New York Times. January 28, 1910. ISSN 0362-4331. Archived from the original on May 19, 2023. Retrieved May 19, 2023.
  31. "Another Brisk Fight for Subway Stops; Fourteenth Street Gives More Effort to Getting an Express Station on Seventh Av. Line". The New York Times. September 17, 1912. ISSN 0362-4331. Archived from the original on May 7, 2023. Retrieved May 19, 2023.
  32. "Money Set Aside for New Subways; Board of Estimate Approves City Contracts to be Signed To-day with Interboro and B.R.T." (PDF). The New York Times. March 19, 1913. ISSN 0362-4331. Archived (PDF) from the original on July 7, 2021. Retrieved November 10, 2017.
  33. Whitney, Travis H. (March 10, 1918). "The Seventh and Lexington Avenue Subways Will Revive Dormant Sections — Change in Operation That Will Transform Original Four-Tracked Subway Into Two Four-Tracked Systems and Double Present Capacity of the Interborough" (PDF). The New York Times. p. 12. ISSN 0362-4331. Archived (PDF) from the original on December 12, 2019. Retrieved August 26, 2016.
  34. "Public Service Commission Fixes July 15 For Opening of The New Seventh and Lexington Avenue Subway Lines — Will Afford Better Service and Less Crowding — Shuttle Service for Forty-Second Street — How the Various Lines of the Dual System Are Grouped for Operation and List of Stations on All Lines" (PDF). The New York Times. May 19, 1918. p. 32. ISSN 0362-4331. Archived (PDF) from the original on July 13, 2021. Retrieved November 6, 2016.
  35. ^ "Dual Subway Stations: Protesting Owners Should File Petitions for Changes". New-York Tribune. May 4, 1913. p. C8. ISSN 1941-0646. ProQuest 575088610.
  36. ^ "Pick Out Stations for Dual Subway; Sept. 12 and 13 Set for Public Hearings on Locations Favored by Service Board". The New York Times. August 15, 1912. ISSN 0362-4331. Archived from the original on May 7, 2023. Retrieved May 19, 2023.
  37. "Clark St. Tube to Brooklyn to Open Tuesday: After Midnight First West Side Train Will Leave Wall Street and East Side Cars Atlantic Avenue for New York—Brooklyn Heights Station". The Wall Street Journal. April 11, 1919. p. 19. ISSN 0099-9660. ProQuest 129808946.
  38. ^ "Clark Street Tunnel Opens Next Tuesday". Brooklyn Times Union. April 10, 1919. p. 1. Archived from the original on May 19, 2023. Retrieved May 19, 2023 – via newspapers.com.
  39. ^ "Clark St. Tunnel Opens This Month". The Brooklyn Daily Eagle. March 13, 1919. p. 1. Archived from the original on May 19, 2023. Retrieved May 19, 2023 – via newspapers.com.
  40. ^ "3 Subways Soon at Borough Hall". The Brooklyn Daily Eagle. August 22, 1915. p. 68. Archived from the original on May 19, 2023. Retrieved May 19, 2023 – via newspapers.com.
  41. ^ National Trust Guaranty Company Building (PDF) (Report). New York City Landmarks Preservation Commission. January 24, 2017. pp. 8–9.
  42. "Work Begins on New Tubes Under River — Engineer Tells How Subway Tunnels Will Be Cut Through to Brooklyn — Will Burrow in Shield — Steel Ring Pushed Forward Under Hydraulic Pressure of 6,000,000 Pounds". The New York Times. October 11, 1914. p. 2. ISSN 0362-4331. Archived from the original on June 12, 2018. Retrieved February 28, 2010.
  43. ""L" Plans in Muddle as Officials Dodge Issue Over Subway". The Brooklyn Daily Eagle. July 7, 1915. p. 16. Retrieved June 1, 2023 – via newspapers.com.
  44. "Clark Street Subway To Be Opened April 1: Three New Tunnels Within Year to Lighten Burdens of Tubes, Whitney Says Direct Lines to Brooklyn Montague and 60th Street Projects to Give Better Service to the Beaches". New-York Tribune. January 27, 1919. p. 16. ISSN 1941-0646. ProQuest 575952460.
  45. "Fear B.R.T. Strike; Rush Use of Tunnel; Service Board Aims to Have Clark Street Tube Open to Care for Brooklyn Travel". The New York Times. April 13, 1919. ISSN 0362-4331. Retrieved May 5, 2023.
  46. ^ "50,000 Persons Use New Tube On First Day: Clark Street Tunnel of the West Side Subway Cuts Down the Congestion of Traffic From Brooklyn". New-York Tribune. April 16, 1919. p. 11. ISSN 1941-0646. ProQuest 576071281.
  47. ^ "Open Clark Street Line; New Route Doubles Subway Service Between the Two Boroughs". The New York Times. April 16, 1919. ISSN 0362-4331. Archived from the original on July 27, 2019. Retrieved May 2, 2023.
  48. "Lessens Subway Crush; New Clark Street Tunnel Inspectors Say It Has Relieved Conditions". The New York Times. April 17, 1919. ISSN 0362-4331. Archived from the original on May 2, 2023. Retrieved May 2, 2023.
  49. "Soon to Open New Tunnel; Interborough Hopes to Have Clark Street Line Working in April". The New York Times. March 14, 1919. ISSN 0362-4331. Archived from the original on May 2, 2023. Retrieved May 2, 2023.
  50. 1920–1921 Annual Report of the Interborough Rapid Transit Company For The Year Ended June 30, 1921. Interborough Rapid Transit Company. 1921. p. 10. Archived from the original on May 20, 2021. Retrieved December 21, 2020.
  51. "More Interborough Service for Brooklyn 2 New Lines". pudl.princeton.edu. Interborough Rapid Transit Company. August 23, 1920. Archived from the original on September 24, 2016. Retrieved September 19, 2016.
  52. "Brooklyn Tube Extensions Open: I.R.T. Begins Service on Eastern Parkway and Nostrand Avenue Lines" (PDF). New York Times. August 23, 1920. Archived (PDF) from the original on March 25, 2022. Retrieved December 20, 2015.
  53. ^ "Use Clark St. Subway April 1". The Brooklyn Citizen. March 13, 1919. p. 7. Archived from the original on May 19, 2023. Retrieved May 19, 2023 – via newspapers.com.
  54. "When Will Dual Subway Be Finished?: Completed Work Cost 188,332,000—unfinished Contracts Amount to 20,000,000 Two Bodies Responsible for Construction Lack Mutual Confidence and Team-work". New-York Tribune. January 5, 1919. p. D10. ISSN 1941-0646. ProQuest 575999620.
  55. State of New York Transit Commission Third Annual Report for the Calendar Year 1923. New York State Transit Commission. 1924. p. 501.
  56. Fourth Avenue Subway, Brooklyn's New Transportation Line: A Part of the Dual System of Rapid Transit of the City of New York. New York State Public Service Commission. June 19, 1915.
  57. ^ "Many New Subway Stations". The Standard Union. August 19, 1917. p. 12. Archived from the original on May 19, 2023. Retrieved May 19, 2023 – via newspapers.com.
  58. "Brooklyn Heights for Station Name". The Standard Union. September 2, 1917. p. 8. Archived from the original on May 19, 2023. Retrieved May 19, 2023 – via newspapers.com.
  59. "Work Begins on New Tubes Under River". The New York Times. October 11, 1914. Archived from the original on June 12, 2018. Retrieved February 28, 2010.
  60. "New Tube is Bored Through". The Brooklyn Citizen. June 2, 1917. p. 2. Archived from the original on May 4, 2023. Retrieved May 4, 2023 – via newspapers.com.
  61. "Last River Tunnel is "Holed Through"". The Brooklyn Daily Eagle. June 20, 1917. p. 3. Archived from the original on May 4, 2023. Retrieved May 4, 2023 – via newspapers.com.
  62. "Two River Tunnels Opened 90 Years Ago". The Bulletin. 53 (8). New York Division, Electric Railroaders' Association. August 2010. Archived from the original on October 17, 2016. Retrieved August 26, 2016 – via Issuu.
  63. New York (State) Public Service Commission First District (January 1, 1921). Annual Report for the Year Ended ... The Commission.
  64. Furman, Robert (2015). Brooklyn Heights: The Rise, Fall and Rebirth of America's First Suburb. Definitive History. History Press. p. 354. ISBN 978-1-62619-954-5.
  65. New York (State). Legislature (1922). Legislative Document. J.B. Lyon Company. pp. 460–461. Archived from the original on May 29, 2023. Retrieved May 29, 2023.
  66. New York (State) Legislature (1923). Second Annual Report of the Transit Commission (For the Calendar Year 1922). New York State Transit Commission. p. 100.
  67. Proceedings of the Transit Commission, State of New York Volume III From January 1 to December 31, 1923. New York State Transit Commission. 1923. p. 1277.
  68. "B.M.T. Prepared for Eight-Car Train Service". The Standard Union. December 5, 1927. p. 2. Archived from the original on May 24, 2023. Retrieved May 23, 2023 – via newspapers.com.
  69. "12 B-M. T. Stations To Be Lengthened; Transportation Board Orders Engineers to Prepare Contracts for Brooklyn Work. Cost Put At $633,000 Letter to Commission Urges That Company Be Compelled to Buy New Cars". The New York Times. February 17, 1925. ISSN 0362-4331. Archived from the original on August 21, 2019. Retrieved May 4, 2017.
  70. "City to Spend $362,841 On Six B.-M.T. Platforms: Board of Estimate Appropriates Fund to Lengthen Stations in Brooklyn". The New York Herald, New York Tribune. January 23, 1926. p. 2. ISSN 1941-0646. ProQuest 1112705635.
  71. "Brooklyn's Share of Many Millions for Subways Small". The Standard Union. January 4, 1926. p. 10. Retrieved May 23, 2023 – via newspapers.com.
  72. New York (N.Y.). Board of Transportation (1926). Proceedings. The Board. p. 239. Archived from the original on May 23, 2023. Retrieved May 23, 2023.
  73. "Snow Holding Up Platform Lengthening on the B-M.T.; Get More Bids February 25". The Standard Union. February 8, 1926. p. 2. Retrieved May 23, 2023 – via newspapers.com.
  74. "B.M.T. Stations Ready For Eight-Car Trains". Brooklyn Standard Union. August 1, 1927. p. 1. Retrieved April 9, 2020 – via newspapers.com.
  75. "B. M, T. Station Lengthening Is Nearly Finished: 76 Platforms Are Extended 3,186 Feet to Make Room for 126.000 Additional Passengers in Rush Hours City Carried Out Work I.R.T. Changes Planned, but That Company Refuses to Pay Its Share of Costs". New York Herald Tribune. August 2, 1927. p. 32. ISSN 1941-0646. ProQuest 1113704092.
  76. "B.M.T. Lines Pass to City Ownership; $175,000,000 Deal Completed at City Hall Ceremony-- Mayor 'Motorman No. 1'". The New York Times. June 2, 1940. ISSN 0362-4331. Archived from the original on July 19, 2021. Retrieved May 14, 2022.
  77. "City Takes Over B. M. T. System; Mayor Skippers Midnight Train". New York Herald Tribune. June 2, 1940. p. 1. ProQuest 1243059209.
  78. "City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign". The New York Times. June 13, 1940. ISSN 0362-4331. Archived from the original on January 7, 2022. Retrieved May 14, 2022.
  79. "Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune. June 13, 1940. p. 25. ProQuest 1248134780.
  80. "Brooklyn Area Improved; Borough Hall Park to Be Opened to the Public Today". The New York Times. September 26, 1940. ISSN 0362-4331. Archived from the original on May 19, 2023. Retrieved May 19, 2023.
  81. "Subway Clean-up Goes on Steadily; 20 Stations Painted, 14 More Due This Year – Washroom Modernization Under Way". The New York Times. August 14, 1947. ISSN 0362-4331. Retrieved May 29, 2023.
  82. "List of Free and Pay Transfer Points". New York Herald Tribune. June 30, 1948. p. 12. ISSN 1941-0646. ProQuest 1327387636.
  83. "Air Raid Shelter Plan for Subways Includes 'Walk' in 42d St. Shuttle". The New York Times. May 23, 1951. ISSN 0362-4331. Archived from the original on July 15, 2022. Retrieved May 29, 2023.
  84. "Defense Officials Inspect Subways; City Plans to Improve Several Stations for Use as Shelters if Funds Are Appropriated". The New York Times. January 30, 1952. ISSN 0362-4331. Retrieved May 29, 2023.
  85. Bennett, Charles G. (November 20, 1949). "Transit Platforms on Lines in Queens to Be Lengthened; $3,850,000 Program Outlined for Next Year to Care for Borough's Rapid Growth". The New York Times. ISSN 0362-4331. Archived from the original on April 29, 2018. Retrieved May 23, 2023.
  86. "37 Platforms On Subways To Be Lengthened: All Stations of B. M. T. and I.R.T.in Queens Included in $5,000,000 Program". New York Herald Tribune. November 20, 1949. p. 32. ISSN 1941-0646. ProQuest 1325174459.
  87. Crowell, Paul (September 15, 1949). "Platforms Added at 32 IRT Stations; City Pays Out $13,327,000 in Lengthening Local Stops to Take 10-Car Trains". The New York Times. ISSN 0362-4331. Archived from the original on September 14, 2021. Retrieved May 23, 2023.
  88. Annual Report 1964–1965. New York City Transit Authority. 1965.
  89. ^ New York City Transit Authority (1964). Proceedings of the New York City Transit Authority Relating to Matters Other Than Operation. The Authority. p. 86.
  90. Rogoff, Dave (February 1969). "BMT Broadway Subway Platform Extensions" (PDF). New York Division Bulletin. 12 (1). Electric Railroaders' Association: 3–4. Archived from the original (PDF) on September 15, 2020. Retrieved December 27, 2020.
  91. Burks, Edward C. (March 24, 1975). "Plans Outlined to Upgrade Subway and Bus Systems". The New York Times. ISSN 0362-4331. Retrieved June 1, 2023.
  92. ^ Burks, Edward C. (November 18, 1976). "A Subway Elongatomus? Why, It's Preposterous!". The New York Times. Archived from the original on March 24, 2020. Retrieved September 21, 2016.
  93. "21 Shut Subway Facilities May Open". The New York Times. April 24, 1977. ISSN 0362-4331. Retrieved May 31, 2023.
  94. ^ "12 IRT Subway Stops Get Landmark Status". The New York Times. October 27, 1979. ISSN 0362-4331. Archived from the original on March 9, 2018. Retrieved December 26, 2020.
  95. ^ Public Private Cooperation for Better Transportation. U.S. Department of Transportation, Urban Mass Transportation Administration. 1984. p. 5.
  96. ^ "Face-lift to start at Hoyt St. IRT subway station". New York Daily News. June 21, 1983. p. 78. ISSN 2692-1251. Retrieved June 1, 2023 – via newspapers.com.
  97. Kappstatter, Bob (October 29, 1981). "Boro Hall station on track of renovations". New York Daily News. p. 153. ISSN 2692-1251. Archived from the original on May 3, 2023. Retrieved May 3, 2023 – via newspapers.com.
  98. Goldman, Ari L. (April 28, 1983). "M.T.A. Making Major Addition to Capital Plan". The New York Times. ISSN 0362-4331. Archived from the original on April 25, 2022. Retrieved May 4, 2023.
  99. "Federal Funds Awarded To Fix Subway Stations". The New York Times. September 5, 1982. ISSN 0362-4331. Archived from the original on July 7, 2022. Retrieved July 7, 2022.
  100. Daley, Suzanne (March 8, 1985). "Year of Delays Plague Renovation of a Brooklyn IRT Station". The New York Times. ISSN 0362-4331. Archived from the original on January 5, 2017. Retrieved May 3, 2023.
  101. Carmody, Deirdre (October 18, 1985). "After 2 Years and Little Progress, Work on Brooklyn IRT Stop is Halted". The New York Times. ISSN 0362-4331. Archived from the original on March 24, 2022. Retrieved May 4, 2023.
  102. ^ Seaton, Charles (May 13, 1987). "Many factors caused delay at Boro Hall". New York Daily News. p. 121. ISSN 2692-1251. Retrieved June 1, 2023 – via newspapers.com.
  103. ^ Levine, Richard (May 11, 1987). "Updating 50 Subway Stations: Costly and Late". The New York Times. ISSN 0362-4331. Archived from the original on November 10, 2017. Retrieved May 3, 2023.
  104. Gordy, Margaret (January 29, 1986). "TA Improvement Plan 'A Mess': Chief Engineer". Newsday. pp. 9, 32. ISSN 2574-5298. Retrieved June 1, 2023 – via newspapers.com.
  105. Levine, Richard (March 30, 1987). "Saving the Subway's Last Mosaics". The New York Times. ISSN 0362-4331. Archived from the original on March 27, 2020. Retrieved May 3, 2023.
  106. Finder, Alan (March 16, 1992). "Transit Authority Switches Tracks". The New York Times. ISSN 0362-4331. Archived from the original on August 12, 2016. Retrieved May 5, 2023.
  107. Seaton, Charles (May 15, 1987). "Goldin hits poor job in fixing subway stations". New York Daily News. p. 112. ISSN 2692-1251. Retrieved June 1, 2023 – via newspapers.com.
  108. Seaton, Charles (December 3, 1989). "Subway Work Derailed". New York Daily News. pp. 391, 393. ISSN 2692-1251. Retrieved May 23, 2023 – via newspapers.com.
  109. Grimes, William (September 19, 1993). "Making It Work; Artists of the Underground". The New York Times. ISSN 0362-4331. Retrieved June 3, 2023.
  110. Wright, Chapin; Ben-Ali, Russell (October 15, 1992). "TA Cop Kills Homeless Man". Newsday. pp. 6, 133. ISSN 2574-5298. Retrieved June 3, 2023 – via newspapers.com.
  111. "Rapid Transit Services For Persons With Disabilities 2001-S-69" (PDF). osc.state.ny.us. Office of the New York State Comptroller. January 8, 2004. Archived (PDF) from the original on January 10, 2021. Retrieved September 16, 2020.
  112. Sachar, Emily (July 16, 1993). "Long Wait For Access". Newsday. p. 2. ISSN 2574-5298. ProQuest 278657263.
  113. Allen, Michael O. (November 30, 1997). "Road Blocks". New York Daily News. p. 14. ISSN 2692-1251. Retrieved June 3, 2023 – via newspapers.com.
  114. Sachar, Emily (April 11, 1994). "TA Set to Tinker". Newsday. p. 6. ISSN 2574-5298. Retrieved June 3, 2023 – via newspapers.com.
  115. Rutenberg, James (August 12, 1997). "Subway station outta steps". New York Daily News. p. 629. ISSN 2692-1251. Retrieved June 3, 2023 – via newspapers.com.
  116. Fellner, Mimi (April 18, 2001). "Subway Escalator is Down – Again". New York Daily News. p. 1. ISSN 2692-1251. ProQuest 305669892.
  117. ^ "New York MPS Borough Hall Subway Station (IRT)". Records of the National Park Service, 1785 – 2006, Series: National Register of Historic Places and National Historic Landmarks Program Records, 2013 – 2017, Box: National Register of Historic Places and National Historic Landmarks Program Records: New York, ID: 75313349. National Archives.
  118. Berger, Paul (June 20, 2018). "Ceiling at Borough Hall Subway Platform Collapses, Injuring One". The Wall Street Journal. ISSN 0099-9660. Archived from the original on May 4, 2023. Retrieved May 4, 2023.
  119. Colon, Dave (June 20, 2018). "The Borough Hall subway station is literally collapsing". Curbed NY. Archived from the original on May 4, 2023. Retrieved May 4, 2023.
  120. ^ Chung, Jen (November 19, 2019). "MTA Inspector General: Brooklyn Borough Hall Ceiling Collapse Could Have Been Avoided". Gothamist. Archived from the original on November 20, 2019. Retrieved May 4, 2023.
  121. Gordon, Aaron (June 20, 2018). "Borough Hall Ceiling Collapse Shows How Badly Subway Is Deteriorating". The Village Voice. Archived from the original on May 19, 2023. Retrieved May 19, 2023.
  122. Barone, Vincent (November 20, 2019). "MTA negligence, inspection flaws led to Brooklyn Borough Hall ceiling collapse: Audit". Brooklyn Paper. Archived from the original on May 4, 2023. Retrieved May 4, 2023.
  123. Duggan, Kevin (July 13, 2020). "MTA starts repairs on Borough Hall elevators, Clark Street schedule remains unknown". Brooklyn Paper. Archived from the original on May 14, 2023. Retrieved May 14, 2023.
  124. ^ Singer, Noah (July 10, 2020). "MTA will begin elevator replacement at Borough Hall". Brooklyn Eagle. Retrieved June 2, 2023.
  125. "New Elevators Coming to Court Street "R"". Brooklyn Heights Association. Archived from the original on May 14, 2023. Retrieved May 14, 2023.
  126. Martinez, Jose (January 19, 2023). "Going Down: Entrapments Plague MTA's Expensive New Elevators". The City. Archived from the original on February 28, 2023. Retrieved May 14, 2023.
  127. Brachfeld, Ben (November 29, 2022). "MTA to spend $1 billion on subway, commuter rail accessibility upgrades". amNewYork. Archived from the original on December 1, 2022. Retrieved December 1, 2022.
  128. Nessen, Stephen (November 28, 2022). "MTA to spend more than $1B on accessibility upgrades". Gothamist. Archived from the original on February 4, 2023. Retrieved May 4, 2023.
  129. "Capital Program Oversight Committee Meeting November 2022". mta.info. Metropolitan Transportation Authority. November 29, 2022. p. 87. Archived from the original on November 26, 2022. Retrieved July 14, 2022.
  130. Cerro, Ximena Del (March 20, 2023). "Construction begins to renovate and add elevators at Borough Hall station for fully accesible [sic] 4, 5, 2 and 3 trains". Brooklyn Paper. Archived from the original on May 4, 2023. Retrieved May 4, 2023.
  131. Brendlen, Kirstyn (February 24, 2023). "Restler launches new 'Friends of MTA Station' initiative to care for 5 local subway stops". Brooklyn Paper. Archived from the original on May 6, 2023. Retrieved May 6, 2023.
  132. Nessen, Stephen (March 5, 2023). "Want to be 'friends' with a subway station? A Brooklyn councilmember seeks volunteers". Gothamist. Archived from the original on May 6, 2023. Retrieved May 6, 2023.
  133. Camille, Jada (June 22, 2023). "Moving on up! MTA opens Court Street station after making accessibility upgrades". Brooklyn Paper. Retrieved June 27, 2023.
  134. Napack, Ella (January 5, 2024). "MTA finishes structural, aesthetic renovations in Downtown Brooklyn's Court Street station". Brooklyn Eagle. Retrieved January 7, 2024.
  135. Brendlen, Kirstyn (January 5, 2024). "Order on Court Street as MTA completes subway station renovation". Brooklyn Paper. Retrieved January 7, 2024.
  136. The Merchants' Association of New York Pocket Guide to New York. Merchants' Association of New York. March 1906. pp. 19–26.
  137. "Tunnel to Brooklyn to Open Next Week; Subway Extension Under East River May Begin Carrying Passengers on Thursday" (PDF). The New York Times. January 4, 1908. p. 1. ISSN 0362-4331. Retrieved January 5, 2021.
  138. "Open New Subway Lines to Traffic; Called a Triumph — Great H System Put in Operation Marks an Era in Railroad Construction — No Hitch in the Plans — But Public Gropes Blindly to Find the Way in Maze of New Stations — Thousands Go Astray — Leaders in City's Life Hail Accomplishment of Great Task at Meeting at the Astor" (PDF). The New York Times. August 2, 1918. p. 1. Archived (PDF) from the original on February 21, 2021. Retrieved November 6, 2016.
  139. "Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side Changes Take Effect". The New York Times. February 7, 1959. p. 21. ISSN 0362-4331. Archived from the original on January 1, 2018. Retrieved November 6, 2016.
  140. "IRT Brooklyn Line Opened 90 Years Ago". New York Division Bulletin. 53 (9). New York Division, Electric Railroaders' Association. September 2010. Retrieved August 31, 2016 – via Issuu.
  141. Brown, Nicole (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious". amNewYork. Archived from the original on March 2, 2021. Retrieved January 27, 2021.
  142. Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960). "A Summary of Services on the IRT Division, NYCTA" (PDF). New York Division Bulletin. 3 (1). Electric Railroaders' Association: 2–3. Archived (PDF) from the original on September 14, 2020. Retrieved January 27, 2021.
  143. ^ "New Subway Link Opens; Service Started Through Queens and Montague Street Tubes". The New York Times. August 1, 1920. ISSN 0362-4331. Archived from the original on October 18, 2022. Retrieved October 18, 2022.
  144. ^ Flegenheimer, Matt (August 5, 2013). "On R Train, Unwelcome Reminder of Storm's Impact". The New York Times. ISSN 0362-4331. Archived from the original on May 30, 2020. Retrieved October 18, 2022.
  145. "New B.R.T. Tunnel Schedule is Given". New York Herald. July 30, 1920. p. 16. Archived from the original on October 18, 2022. Retrieved October 18, 2022 – via newspapers.com.
  146. ^ "Nassau St. Service Outlined by B.M.T.; Loop to Be Used for Direct Connection From Brooklyn and Jamaica to Manhattan". The New York Times. May 21, 1931. ISSN 0362-4331. Archived from the original on June 14, 2018. Retrieved October 18, 2022.
  147. "Hey, What's a "K" train? 1985 Brochure". New York City Transit Authority. 1985. Archived from the original on September 15, 2016. Retrieved June 17, 2016 – via Flickr.
  148. Perlmutter, Emanuel (November 16, 1967). "Subway Changes to Speed Service: Major Alterations in Maps, Routes and Signs Will Take Effect Nov. 26" (PDF). The New York Times. p. 1. Archived from the original on October 30, 2021. Retrieved July 7, 2015.
  149. "To serve you better... On The Brighton Line in Brooklyn". Flickr. New York City Transit Authority. 1972. Retrieved July 27, 2021.
  150. "Subway Track Work To Divert BMT Lines". The New York Times. April 26, 1986. ISSN 0362-4331. Archived from the original on October 18, 2022. Retrieved October 18, 2022.
  151. Johnson, Kirk (December 9, 1988). "Big Changes For Subways Are to Begin". The New York Times. ISSN 0362-4331. Archived from the original on March 8, 2021. Retrieved October 18, 2022.
  152. Luo, Michael (February 20, 2004). "A Subway Map Remade, in Hopes of Matching Routes and Riders". The New York Times. ISSN 0362-4331. Archived from the original on October 18, 2022. Retrieved October 18, 2022.
  153. Son, Hugh (February 15, 2004). "ABC's of subway swap Manhattan Bridge fix changes 7 lines". New York Daily News. ISSN 2692-1251. Archived from the original on February 26, 2018. Retrieved February 25, 2018.
  154. ^ "Evaluation of 2010 Service Reductions" (PDF). mta.info. Metropolitan Transportation Authority. September 23, 2011. Archived (PDF) from the original on December 8, 2015. Retrieved October 20, 2016.
  155. "Major Subway Changes Set for Monday". mta.info. Metropolitan Transportation Authority. June 24, 2010. Archived from the original on December 28, 2015. Retrieved October 20, 2016.
  156. McGeehan, Patrick (September 12, 2014). "Subway Tunnel to Open, Storm Repairs Finished". The New York Times. ISSN 0362-4331. Archived from the original on October 18, 2022. Retrieved October 18, 2022.
  157. ^ "15: Transit and Pedestrians" (PDF). Brooklyn Bridge Park Final Environmental Impact Statement. Brooklyn Bridge Park Development Corporation. 2005. Archived (PDF) from the original on May 27, 2023. Retrieved May 27, 2023.
  158. "Accessibility". web.mta.info. Metropolitan Transportation Authority. Archived from the original on April 5, 2020. Retrieved August 6, 2017.
  159. mtainfo (February 6, 2019). NYCT Public Event – Discussion About the Next Accessible Subway Stations – 02/06/2019 (video). Archived from the original on December 12, 2021 – via YouTube.
  160. Cox, Jeremiah (May 12, 2007). "Looking down the passageway between the Manhattan-bound 2,3 and 4,5 platforms at Borough Hall". subwaynut.com. Archived from the original on March 9, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  161. Cox, Jeremiah (June 18, 2009). "The back of the Manhattan-bound platform at Borough Hall, the passageway to the East Side 4,5 Line is visible up-ahead, one of the two staircases down to the Flatbush & New Lots 2,3 platform is down below". subwaynut.com. Archived from the original on March 8, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  162. ^ Brooklyn, Pierrepont Street Office Development: Environmental Impact Statement. 1985. Archived from the original on May 27, 2023. Retrieved May 27, 2023.
  163. ^ "Trains Running in New Brooklyn Subways in a Year". The Brooklyn Daily Eagle. December 23, 1917. p. 20. Archived from the original on May 5, 2023. Retrieved May 5, 2023 – via newspapers.com.
  164. ^ Station ADA Accessibility Analysis 2017; Transfer Complex; MR No. Station Line: 024 Court Street BMT-Broadway (Subway); 335 Borough Hall IRT-Clark Street (Subway); 415 Borough Hall IRT-Lexington (Subway) (Report). Stantec. December 31, 2019. p. 2.
  165. ^ "MTA Neighborhood Maps: Downtown Brooklyn and Borough Hall" (PDF). mta.info. Metropolitan Transportation Authority. 2015. Archived (PDF) from the original on July 24, 2015. Retrieved August 2, 2015.
  166. ^ "MTA Neighborhood Maps: Court St (R)". Metropolitan Transportation Authority. Retrieved August 4, 2023.
  167. See:
  168. ^ "ZoLa: NYC's Zoning & Land Use Map". New York City Department of City Planning. Retrieved January 1, 2021.
  169. Cox, Jeremiah (July 6, 2009). "One of the entrance staircases to Court Street, it is extremely unusual, in front of St. Ann's and the Holy Trinity Church". subwaynut.com. Archived from the original on March 10, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  170. Cox, Jeremiah (July 6, 2009). "Another unusual entrance staircase to the Clinton Street exit at Court Street". subwaynut.com. Archived from the original on March 10, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  171. "Clark Street Tube To Brooklyn To Be Ready Next Month: Commissioner Whitney Announces Only Stations and Crossover To Be Finished; Urges Study of Plans". New-York Tribune. March 14, 1919. p. 9. ISSN 1941-0646. ProQuest 576043129.
  172. "2 Subway Timetable, Effective June 26, 2022". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  173. "3 Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  174. ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  175. ^ Dougherty, Peter (2006) . Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  176. "Construction of the Tunnel Presented Difficult Problems". The Brooklyn Daily Eagle. January 9, 1908. p. 26. Archived from the original on May 19, 2023. Retrieved May 19, 2023 – via newspapers.com.
  177. Cox, Jeremiah (June 18, 2009). "A Borough Hall name tablet, it has a fairly colorful border". subwaynut.com. Archived from the original on March 8, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  178. Cox, Jeremiah (June 28, 2008). "A close-up of an intricate Vickers dual-contracts era representation of a Brooklyn Building that is the trimline for the platform trim line at Borough Hall". subwaynut.com. Archived from the original on March 9, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  179. Cox, Jeremiah (June 18, 2009). "Looking down the Manhattan-bound platform at Borough Hall, by a name tablet". subwaynut.com. Archived from the original on March 8, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  180. "4 Subway Timetable, Effective December 15, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  181. "5 Subway Timetable, Effective December 15, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  182. ^ Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  183. Cox, Jeremiah (June 18, 2009). "Another view down the Manhattan-bound side platform at Borough Hall with its green columns and a Woodlawn-bound R142 4 train stopped in the station". subwaynut.com. Archived from the original on March 9, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  184. Cox, Jeremiah (May 12, 2007). "A mosaic Borough Hall name tablet, there is a decorative terra-cotta wall reliefs above it". subwaynut.com. Archived from the original on March 9, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  185. Cox, Jeremiah (June 9, 2008). "Painted on Borough Hall text in the 1950s tiled portion of the extreme eastern (southern) end of the station at Borough Hall". subwaynut.com. Archived from the original on March 9, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  186. "R Subway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  187. "W Subway Timetable, Effective December 15, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  188. "N Subway Timetable, Effective December 15, 2024". Metropolitan Transportation Authority. Retrieved December 16, 2024.
  189. Cox, Jeremiah (January 15, 2005). "Looking out along one of the tracks at Court Street, at a name tablet on the track walls, there is also a sign on a platform column saying that special J trains stop at this platform that are replacing 4 train service between Brooklyn Bridge and Brooklyn". subwaynut.com. Archived from the original on October 16, 2012. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  190. Cox, Jeremiah (July 6, 2009). "The tiling of the platform walls at Court Street are extremely decorative and colorful, with rainbow colored borders around the name tablets and trim-lines". subwaynut.com. Archived from the original on March 10, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  191. Cox, Jeremiah (July 6, 2009). "Approaching the northern (western) end of the platform at Court Street, the walls become single white tiles with simple station name signs". subwaynut.com. Archived from the original on August 7, 2017. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  192. Cox, Jeremiah (April 2, 2006). "Looking down the single island platform at Court Street towards a staircase up to the small lower-mezzanine landing that leads up to the escalators and the IRT transfer". subwaynut.com. Archived from the original on March 10, 2016. Retrieved August 6, 2017.{{cite web}}: CS1 maint: unfit URL (link)
  193. "The Trolley Loop at Borough Hall". The Standard Union. July 28, 1915. p. 2. Retrieved June 1, 2023 – via newspapers.com.
  194. "Will Reopen the Johnson St. Loop". The Standard Union. February 22, 1914. p. 5. Retrieved June 1, 2023 – via newspapers.com.
  195. "Chain of Car Loops to Avoid New Court". The Brooklyn Daily Eagle. May 20, 1914. p. 18. Retrieved June 1, 2023 – via newspapers.com.
  196. "New Johnson St. Loop Open This Afternoon". The Standard Union. May 22, 1914. p. 17. Retrieved June 1, 2023 – via newspapers.com.
  197. Brooklyn Daily Eagle Almanac. The Brooklyn Daily Eagle. 1916.
  198. "Brooklyn Accepts New Traffic Rules; Civic Leaders and Merchants Hail Improvement After the First Day's Trial". The New York Times. April 8, 1930. p. 24. ISSN 0362-4331. Archived from the original on July 22, 2018. Retrieved May 20, 2023.
  199. Dater, Lucille (April 7, 1930). "New Kings Trolley Routes Are Put to Test". New York Daily News. p. 411. ISSN 2692-1251. Archived from the original on May 27, 2023. Retrieved May 27, 2023 – via newspapers.com.
  200. "Reroute Cars to Aid Brooklyn Traffic; Whalen and B.M.T. Agree to After 18 Lines and End Borough Hall Loop". The New York Times. April 1, 1930. p. 14. ISSN 0362-4331. Archived from the original on July 22, 2018. Retrieved May 20, 2023.
  201. "Whalen Reroutes Traffic in Borough Hall Sector". New York Daily News. April 1, 1930. p. 415. ISSN 2692-1251. Archived from the original on May 27, 2023. Retrieved May 27, 2023 – via newspapers.com.
  202. Jackson, Kenneth T., ed. (1995). The Encyclopedia of New York City. New Haven: Yale University Press. p. 1250. ISBN 0300055366.

Further reading

External links

Downtown Brooklyn
Brooklyn, New York City
Green spaces and plazas
Education
Religion
Culture
Performance venues
Restaurants
Museums
Other buildings
Transportation
Subway stations
Streets
Government
Related topics
See also: Brooklyn Community Board 2
Stations of the New York City Subway, by service
"2" train Seventh Avenue Express
"3" train Seventh Avenue Express
"4" train Lexington Avenue
 Express
"5" train Lexington Avenue
 Express
Nereid Ave. branch
Dyre Ave. branch
"r" train Broadway Local
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Note: Service variations, station closures, and reroutes are not reflected here.
    Stations with asterisks have no regular peak, reverse peak, or midday service on that route. See linked articles for more information.
Stations of the New York City Subway, by line (physical trackage)
Broadway–
Seventh Ave. Line

"1" train"2" train"3" train
"1" train South Ferry branch
"2" train"3" train Brooklyn branch
Eastern Pkwy. Line
"2" train"3" train"4" train"5" train
Fourth Ave. Line
"D" train"N" train"R" train"W" train
See also
Lists by borough (The Bronx
Brooklyn
Manhattan
Queens)
Accessible
Closed
Terminals
Transfer
Commons category
  • Stations and line segments in italics are closed, demolished, or planned (temporary closures are marked with asterisks). Track connections to other lines' terminals are displayed in brackets. Struck through passenger track connections are closed or unused in regular service.
U.S. National Register of Historic Places in New York
Topics

Lists
by county
Lists
by city
Other lists
Categories: