Misplaced Pages

Compensated gross tonnage

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Indicator of the amount of work necessary to build a ship
This article relies largely or entirely on a single source. Relevant discussion may be found on the talk page. Please help improve this article by introducing citations to additional sources.
Find sources: "Compensated gross tonnage" – news · newspapers · books · scholar · JSTOR (October 2016)

Compensated Gross Tonnage (CGT) is an indicator of the amount of work that is necessary to build a given ship and is calculated by multiplying the tonnage of a ship by a coefficient, which is determined according to type and size of a particular ship.

The standard CGT system was developed in 1977 by the OECD so that inter-country shipbuilding output could be reasonably compared, as different types of ships require a greater or lesser degree of work relative to their gross tonnage. For example, passenger ferry of a given size would require substantially more work to build than a bulk carrier of the same size due to the differing design requirements, internal structure, and required level of detail, but simply comparing the gross tonnage or deadweight of each ship would incorrectly show that they took the same amount of work. When expanded on a national scale, this difference could greatly mislead people as to the actual maritime production capacity of a given country.

The formula to calculate CGT was revised by the OECD in 2007.

References

Stopford, Martin (1997). Maritime Economics (2nd ed.). Routledge. pp. 525–526. ISBN 978-0-415-15309-6.

External links

Stub icon

This article related to shipbuilding is a stub. You can help Misplaced Pages by expanding it.

Ship measurements
Length
Breadth
Depth
Height
Volume
Worldwide
Specialized
Archaic
Capacity
Current
Archaic
Weight
Stability
Limits
Categories: