Dongdaqiao 东大桥 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Platform | |||||||||||
General information | |||||||||||
Location | East Workers' Stadium Road (工人体育场东路) / Dongdaqiao Road (东大桥路) and Chaoyangmen Outer Street / North Chaoyang Road (朝阳北路) Chaoyang District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 6 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2012; 11 years ago (2012-12-30) | ||||||||||
Services | |||||||||||
| |||||||||||
|
Dongdaqiao (simplified Chinese: 东大桥站; traditional Chinese: 東大橋站; pinyin: Dōngdàqiáo Zhàn) is a station on Line 6 of the Beijing Subway. This station opened on December 30, 2012.
Station layout
The station has an underground island platform.
Exits
There are 4 exits, lettered A, B, D1, and D2. Exit D1 is accessible.
References
- "地铁6号线一期沿线站名确定-北京网交通出行". Archived from the original on 2013-12-24. Retrieved 2013-03-19.
- "轨道交通6号线预计年底试运营 五项第一彰显北京地铁新奇迹 - 要闻速递 - 北京市交通委员会". Archived from the original on 2012-11-11. Retrieved 2012-12-26.
- 北京四地铁线30日开通 首末车时间确定 (in Simplified Chinese). 新京报. Retrieved 26 December 2012.
External links
- Media related to Dongdaqiao Station at Wikimedia Commons
Beijing Subway stations | |
---|---|
Line 6 |
|
Stations that are proposed, under planning or under construction are shown in italics. |
39°55′23″N 116°27′06″E / 39.923054°N 116.451657°E / 39.923054; 116.451657
This article related to the Beijing Subway is a stub. You can help Misplaced Pages by expanding it. |