HMAS Supply in June 2022 | |
History | |
---|---|
Australia | |
Name | Supply |
Namesake | HMAS Supply |
Ordered | 10 March 2016 |
Builder | Navantia |
Laid down | 18 November 2017 |
Launched | 25 November 2018 |
Commissioned | 10 April 2021 |
Identification |
|
Motto | Strengthen the Shield |
Nickname(s) | Orca |
Status | Under repair |
Badge | |
General characteristics | |
Class and type | Supply-class replenishment oiler |
Displacement | 19,500 t (19,200 long tons) full load |
Length | 173.9 m (570 ft 6 in) |
Beam | 23 m (75 ft 6 in) maximum |
Draught | 8 m (26 ft 3 in) |
Propulsion |
|
Speed | Over 20 knots (37 km/h; 23 mph) |
Range | Over 6,000 nmi (11,000 km; 6,900 mi) at 13 knots (24 km/h; 15 mph) |
Complement | 122 |
Armament | 2x25mm Typhoon ?x12.7mm Browning Heavy Machine Gun |
Aircraft carried | 2xMH60R |
HMAS Supply (A195), named after the Royal Navy ship HMS Supply, is the lead ship of the Supply-class replenishment oilers built for the Royal Australian Navy by Navantia at their yard in Ferrol, Spain. The Australian Supply-class ships are based on the Spanish Navy's replenishment oiler Cantabria. The vessel was launched on 18 November 2017 and commissioned on 10 April 2021. It was confirmed in Senate estimates on 6 June 2024 that Supply was under repair in Western Australia, however the ship is currently based in NSW, as of November 2024.
Design and construction
Main article: Supply-class replenishment oilerThe Supply-class ships are intended to carry fuel, dry cargo, water, food, ammunition, equipment and spare parts to provide operational support for deployed Australian naval or combat forces operating away from the nation for long periods. In addition to replenishment, the vessels can be used to combat against environmental pollution at sea, provide logistics support for the armed forces, and to support humanitarian and disaster relief (HADR) operations following a natural disaster. The contract to build the two auxiliary oiler replenishment ships was awarded to Navantia in 2016.
Supply was laid down on 18 November 2017 and launched at the Navantia Shipyards in Ferrol, Spain on 24 November 2018. Supply is the second Royal Australian Navy (RAN) ship to bear the name after HMAS Supply (AO 195). On 2 October 2020, Supply arrived at Fleet Base West, Western Australia for final fit out and testing activities. Ship acceptance by the Department of Defence occurred on 8 January 2021.
Operational history
Supply replaced HMAS Success which was decommissioned in June 2019. The ship arrived in Australia in early October 2020. While the ship's operational home port is Fleet Base East, its ceremonial home port is the Port of Eden.
The ship was commissioned on 10 April 2021 at Fleet Base East, Sydney. The commissioning ceremony quickly became the object of national controversy because of the RAN's decision to invite a local group of scantily-clad dancers to perform a routine that included twerking. An anonymous federal government frontbencher commented: "A question worth pondering: what would Horatio Nelson think of this shitshow?".
Supply was tasked with supporting the Australian Government effort led by the Department of Foreign Affairs and Trade to the Kingdom of Tonga in February 2022 alongside HMA Ships Adelaide and Canberra provide Australian Aid supplies and water to the country affected by the Hunga Tonga-Hunga Ha'apai eruption and tsunami.
Supply participated in Exercise RIMPAC 2022.
It was confirmed in a Senate estimates committee on 6 June 2024 that Supply is currently under repair in Western Australia.
Notes
- The ship is currently under maintenance in Western Australia as was confirmed in a Senate estimates committee by the Chief of Navy on 6 June 2024.
References
- corporateName=Commonwealth Parliament; address=Parliament House, Canberra. "Foreign Affairs, Defence and Trade". www.aph.gov.au. Retrieved 10 July 2024.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - "Supply Class AORs". Navantia Australia. Retrieved 22 June 2020.
- Kuper, Stephen (27 November 2018). "Fair winds and following seas for NUSHIP Supply". Defence Connect. Retrieved 22 June 2020.
- "Supply Ships Progress", Ships Monthly, February 2019, page 14
- ^ "HMAS Supply (II)". Royal Australian Navy. Retrieved 10 April 2021.
- McLaughlin, Andrew (6 October 2020). "RAN's new AOR arrives in Australia". ADBR. Retrieved 14 October 2020.
- Craig, Jessica (30 November 2020). "Eden named NUSHIP Supply's ceremonial home port". Navy Daily. Retrieved 10 April 2021.
- "Military reminded core business is to use 'lethal violence' to defend Australia's values and sovereignty". ABC News. Retrieved 14 April 2021.
- "HMAS Supply arrives in Tonga". news.defence.gov.au. 15 February 2022. Retrieved 24 April 2022.
- "RIMPAC 2022 Kicks off in Hawaii with 21 Partner Nation Ships". 29 June 2022.
- corporateName=Commonwealth Parliament; address=Parliament House, Canberra. "Foreign Affairs, Defence and Trade". www.aph.gov.au. Retrieved 10 July 2024.
{{cite web}}
: CS1 maint: multiple names: authors list (link)
Commissioned and future warships of the Royal Australian Navy | |||||
---|---|---|---|---|---|
Destroyers |
| ||||
Frigates |
| ||||
Submarines |
| ||||
Amphibious warfare ships |
| ||||
Patrol vessels |
| ||||
Mine countermeasures vessels |
| ||||
Survey vessels |
| ||||
Replenishment vessels |
| ||||
Contracted vessels |
| ||||
— Under construction — Announced but not yet under construction See also: List of current ships of the Royal Australian Navy and Procurement programme of the Royal Australian Navy |
This article about a specific Australian naval ship or boat is a stub. You can help Misplaced Pages by expanding it. |