Misplaced Pages

Haibang station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Guangzhou Metro station
Haibang
海傍Guangzhou Metro
Line 4 station exterior
Chinese name
Chinese海傍站
Transcriptions
Standard Mandarin
Hanyu PinyinHǎibāng Zhàn
Yue: Cantonese
Yale RomanizationHóibohng Jaahm
JyutpingHoibong Zaam
General information
LocationEast side of G4 Beijing–Hong Kong and Macau Expressway, northwest of intersection of South Yayun Road (亚运南路) and Kangti Road (康体路), Shiqi
Panyu District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 3
     Line 4
Platforms4 (2 side platforms for Line 4 and 1 island platform for Line 3)
Construction
Structure typeElevated (Line 4)
Underground (Line 3)
AccessibleYes
Other information
Station code301-4 414
History
Opened30 December 2006; 17 years ago (2006-12-30)
(Line 4)
1 November 2024; 51 days ago (2024-11-01)
(Line 3)
Services
Preceding station Guangzhou Metro Following station
Terminus Line 3 Haichong Lutowards Airport North (Terminal 2) or Tianhe Coach Terminal
Dichongtowards Nansha Passenger Port Line 4 Shiqitowards Huangcun

Haibang Station (Chinese: 海傍站; Cantonese Yale: Hóibohng Jaahm) is an interchange station on Line 3 and Line 4 of the Guangzhou Metro. The Line 4 station started operation December 30, 2006 and is located at the junction of Changnan Road. and the Jingzhu Expressway in Shiqi Town (石碁镇), Panyu District. The Line 3 station opened on November 1, 2024.

Station theme

It is the theme station of the east extension of Line 3, with the design theme of "Chasing the Water Facing the Sea". The ceiling of the station adopts a gradient color wave shape, and the wall is decorated with watercolor wave patterns to show the local characteristics of the Shatian Water Town style.

History

The project of the eastern extension of Line 3 was approved by the National Development and Reform Commission in late March 2017, and the construction report was approved in early January 2018, followed by the construction of the station part of Line 3 in mid-2019. On July 1, 2023, the tunnel boring machine broke through, and on October 27, the main structure was capped. The transfer of the "three powers" was completed on May 31, 2024. On November 1, 2024, the eastern extension of Line 3 was put into operation, along with the station.

Line 3 opening complications

The natural gas pipelines that affected the opening of Qingsheng Station and Guangzhou Metro Line 22 earlier once brought uncertainty to the partial opening of Line 3 of this station. In 2022, the authorities issued a notice stating that the expansion of Haibang station would have affected the operation of the existing three pipelines, namely Guangzhou Gas, Dapeng Gas and Sinopec Pipeline, and they would need to be relocated. The Dapeng Gas Pipeline and Sinopec Oil Pipeline started construction and relocation in December 2023 and March 2024, respectively, and are scheduled to be completed in March 2025. The Guangzhou Gas Pipeline will be relocated and renovated by the Guangzhou Metro Group itself, and the relocation began as of October 2024.

Although the station had already been handed over to the subway operation department for commissioning, the latter was even ready to open the station at the end of September 2024, but this did not happen. The authorities have responded that the station of Line 3 can only be opened after the construction of the pipeline is completed and the pipeline is accepted. However, it was not until October 30 that the Guangzhou Metro Group announced that the eastern extension of Line 3, including this station, would open on November 1 of the same year.

Station layout

F2
Platforms
Side platform, doors will open on the right
Platform 4 arrow for L  4  towards Nansha Passenger Port (Dichong)
Platform 3  4  towards Huangcun (Shiqi) arrow for R
Side platform, doors will open on the right
G
Concourse
Line 4 Lobby Customer Service, Shops, Vending machines, ATMs, Exits, Toilet
B1
Concourse
Line 3 Lobby Ticket Machines, Customer Service, Shops, Safety Facilities, Transfer passageways between Lobbies
B2
Platforms
Platform 1 arrow for L  3  termination platform
Island platform, doors will open on the left
Platform 2  3  towards Tianhe Coach Terminal or Airport North (Terminal 2) (Haichong Lu) arrow for R

Exits

Exit letter Gallery Exit location Nearby destinations
A Kangti Road The Second Affiliated Hospital of Guangzhou Medical University
B Asian Games Town
C Haibangcun
E
F Haibang Metro Station Bus Stop (Northbound), Haibang Metro Station Coach Terminal
G Haibang Metro Station Bus Stop (Southbound)

Gallery

  • Line 3 concourse Line 3 concourse
  • Line 4 concourse Line 4 concourse
  • Transfer level between the two lines Transfer level between the two lines
  • Line 3 alighting platform Line 3 alighting platform
  • Line 4 platform (towards Nansha Passenger Port) Line 4 platform (towards Nansha Passenger Port)

References

  1. 20-meter-high elevated section of Metro Line 4 to open by year's-end
  2. simplified Chinese: 长南路; traditional Chinese: 長南路; pinyin: Chángnán Lù; Jyutping: Coengnaam Lou; Cantonese Yale: Chèuhngnàahm Louh
  3. Haibang
  4. ^ 李佳文 (2024-10-30). "广州地铁三号线东延段11月1日开通" [Guangzhou Metro Line 3 East Extension to open on November 1]. Xin Kuai Bao (in Simplified Chinese). Archived from the original on 2024-11-05. Retrieved 2024-11-17.
  5. 郑慧梓 (2024-06-26). "番禺广场—海傍15分钟可达!广州地铁3号线与4号线年内实现直接换乘" [Panyu Square - 15 minutes to the seaside! Guangzhou Metro Line 3 and Line 4 will realize direct transfer within this year]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-06-26. Retrieved 2024-11-17.
  6. 吴广宇 (2018-01-21). "方便亚运城居民出行,地铁三号线将向东延至海傍站,不延至海鸥岛" [To facilitate the travel of residents in Asian Games City, Metro Line 3 will be extended eastward to Haibang Station instead of Haiou Island]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2018-01-21. Retrieved 2024-11-17 – via NetEase News.
  7. 谭超 (2019-10-21). "广州地铁三号线东延段全面动工!建成后亚运城居民无需换乘直达市中心" [The eastern extension of Guangzhou Metro Line 3 has started construction! After completion, residents of the Asian Games City will be able to reach the city center directly without having to transfer.]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2023-03-19. Retrieved 2024-11-17.
  8. 郑慧梓 (2023-07-01). "最后一个车站土建完工!广州三号线东延线实现全线洞通" [The last station construction is completed! Guangzhou Metro Line 3 East Extension Line has achieved full tunnel connection]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-05-21. Retrieved 2024-11-17.
  9. 郑慧梓 (2024-06-04). "土建进度99%!广州地铁三号线东延段进入运营调试阶段" [Civil construction progress is 99%! The eastern extension of Guangzhou Metro Line 3 has entered the operation and commissioning stage]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-06-04. Retrieved 2024-11-17.
  10. 李天研 (2024-11-01). "广州地铁三号线东延段开通,早高峰海傍站已满座,番禺广场站启动限流" [The eastern extension of Guangzhou Metro Line 3 is open. During the morning rush hour, Haibang Station is full and Panyu Square Station has started to limit the number of passengers.]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2024-11-05. Retrieved 2024-11-17.
  11. 严艺文 (2023-07-01). "全线洞通!广州地铁三号线东延段海傍站顺利贯通" [The entire line is connected! Guangzhou Metro Line 3 East Extension Haibang Station is successfully bored through]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 2023-07-01. Retrieved 2024-11-17.
  12. "珠三角成品油管道一期海傍段改线工程、广州市轨道交通三号线东延段海傍站高压天然气管线迁改工程、广州市天然气利用工程二期(珠海LNG 项目)广州亚运村项目燃气配套工程(北段)高压管线工程改线(海傍站 DN700 燃气高压管线)线路工程 社会稳定风险评估阶段征求公众意见公示" [Public Opinion Solicitation for Public Opinions on the Phase I Haibang Section Rerouting Project of the Pearl River Delta Finished Oil Pipeline, the Relocation Project of the High-Pressure Natural Gas Pipeline at Haibang Station of the East Extension Section of Guangzhou Metro Line 3, the Phase II of Guangzhou Natural Gas Utilization Project (Zhuhai LNG Project), the North Section of the High-Pressure Pipeline Project Rerouting (DN700 High-Pressure Gas Pipeline at Haibang Station) of the Gas Supporting Project for the Guangzhou Asian Games Village Project, and the Social Stability Risk Assessment Phase]. Guangdong International Engineering Consulting Co., Ltd. (in Simplified Chinese). Archived from the original on 2022-05-23. Retrieved 2024-11-17.
  13. "关于广州市轨道交通三号线东延段工程及同步实施工程总承包项目海傍站项目涉及城市树木迁移征求公众意见的公示" [Public Notice on Soliciting Public Opinions on the Relocation of Urban Trees Involving the Guangzhou Metro Line 3 East Extension Project and the Simultaneous EPC Project Haibang Station Project]. Guangzhou Panyu District People's Government (in Simplified Chinese). 2022-08-30. Archived from the original on 2023-06-01. Retrieved 2024-11-17.
  14. "开焊改线!为广州地铁3号线东延段"让路"!" [Welding and line change! Make way for the eastern extension of Guangzhou Metro Line 3!]. National Pipeline Network Group South China Company (in Simplified Chinese). 2024-03-14. Archived from the original on 2024-03-14. Retrieved 2024-11-17 – via Official WeChat Account.
  15. 钟丽婷 (2024-10-29). "地铁3号线东延段海傍站管道迁改进展如何?广州燃气回应了" [How is the pipeline relocation progress of Haibang Station on the East Extension of Metro Line 3? Guangzhou Gas responded]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 2024-11-05. Retrieved 2024-11-17.
  16. 王越莹 (2024-10-16). "3号线东延线为何开通难?亚运城居民翘首以盼" [Why is it difficult to open the East Extension of Line 3? Residents of Asian Games City are eagerly waiting]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-11-05. Retrieved 2024-11-17.
  17. 王越莹 (2024-10-26). "地铁三号线东延线明年才能开通?记者核查" [Will the East Extension of Metro Line 3 open next year? Reporter verification]. Nanfang Daily (in Simplified Chinese). Archived from the original on 2024-11-05. Retrieved 2024-11-17.
Guangzhou Metro stations
Line 3
Line 4

22°56′23″N 113°28′31″E / 22.9397°N 113.4754°E / 22.9397; 113.4754

Categories: