Shiqi 石碁 | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||||
Chinese | 石碁站 | ||||||||||||
| |||||||||||||
General information | |||||||||||||
Location | Panyu District, Guangzhou, Guangdong China | ||||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||||
Line(s) | Line 4 | ||||||||||||
Platforms | 2 (2 side platforms) | ||||||||||||
Construction | |||||||||||||
Structure type | Elevated | ||||||||||||
History | |||||||||||||
Opened | 30 December 2006 | ||||||||||||
Services | |||||||||||||
| |||||||||||||
Shiqi Station (Chinese: 石碁站; Cantonese Yale: Sehkgēi Jaahm) is an elevated station of Line 4 of the Guangzhou Metro in Guangzhou, China. It started operations on 30 December 2006. It is located at the junction of Shilian Road and Jingzhu Expressway in Shiqi Town (石碁镇), Panyu District.
Station layout
F2 Platforms |
Side platform, doors will open on the right | |
Platform 2 | 4 towards Nansha Passenger Port (Haibang) | |
Platform 1 | 4 towards Huangcun (Xinzao) | |
Side platform, doors will open on the right | ||
G Concourse |
Lobby | Exits, Customer Service, Vending machines, ATMs, Toilet |
Exits
Exit number | Exit location | |
---|---|---|
Exit A | Shilian Lu | |
Exit B | Shilian Lu |
References
- 20-meter-high elevated section of Metro Line 4 to open by year's-end
- simplified Chinese: 市莲路; traditional Chinese: 市蓮路; pinyin: Shìlián Lù; Jyutping: Silin Lou; Cantonese Yale: Síhlìhn Louh
- Shiqi
Guangzhou Metro stations | |
---|---|
Line 4 |
22°57′27″N 113°27′56″E / 22.95750°N 113.46556°E / 22.95750; 113.46556
Categories: