Hongshengsha 洪圣沙 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Aerial view of the station surface and surrounds | |||||||||||
Chinese name | |||||||||||
Simplified Chinese | 洪圣沙站 | ||||||||||
Traditional Chinese | 洪聖沙站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | West side of Hongshengsha Island, Huangpu District, Guangzhou, Guangdong China | ||||||||||
Coordinates | 23°05′02″N 113°26′19″E / 23.083883°N 113.438678°E / 23.083883; 113.438678 | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 712 | ||||||||||
History | |||||||||||
Opening | To be determined | ||||||||||
Services | |||||||||||
| |||||||||||
Hongshengsha Station (simplified Chinese: 洪圣沙站; traditional Chinese: 洪聖沙站; pinyin: Hóngshèngshā Zhàn; Jyutping: hungsingsaa zaam) is a station of Guangzhou Metro Line 7, located underground on the west side of Hongshengsha Island in Guangzhou's Huangpu District. The civil works and mechanical and electrical works of the station have been basically completed, but because Hongshengsha Island, where the station is located, has not been developed, and the construction of various municipal supporting facilities has not been completed, the station does not have the opening conditions, so the station cannot be opened simultaneously with the second phase of Line 7, and trains currently pass the station without stopping. It will not open until the island is more developed.
History
Although the route of Line 7 to Huangpu in the early planning stage will pass through Hongshengsha Island, it did not set up a station on the island until 2016. Eventually, the station was included in the second phase of Line 7 for construction. Construction started on 18 April 2019, the construction of the main envelope structure was completed in April 2020. In May 2021, the main structure of the station was successfully capped, making it the first station to be topped out in the second phase of Line 7.
The station was handed over to the '3 Powers' on 31 October 2023 for territorial management and operation of the station and facilities.
Station information
Since both ends of the station are on the Pearl River, and in order to meet the requirements of the depth of the rail crossing the river, the station has a total of 3 floors. The station is planned to have 4 exits.
G | Street level | Exits A-D |
L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Mezzanine |
Buffer Level | Station Equipment |
L3 Platforms |
Platform 2 | 7 towards Meidi Dadao (Changzhou) |
Island platform, doors will not open (trains do not stop here) | ||
Platform 1 | 7 towards Yanshan (Yufengwei) |
References
- 谭超 (2020-04-28). "出行靠轮渡将成历史,广州这座岛上的地铁站有了新进展". 大洋网 (in Simplified Chinese). Archived from the original on 2020-05-03. Retrieved 2024-01-06.
- 李天研 (2023-11-27). "地铁7号线二期洪圣沙站暂缓开通,何时能通仍是未知数". 广州日报 (in Simplified Chinese). Archived from the original on 2023-11-27. Retrieved 2024-01-06.
- ^ 李天研 (2018-01-16). "广州又一地铁项目获批,可换乘7条线,这两个区最受益". 新浪新闻 (in Simplified Chinese). Archived from the original on 2018-01-17. Retrieved 2024-01-06.
- "横跨珠江 江心岛上修地铁 ——中铁一局广州地铁七号线二期洪圣沙站正式开工建设". 中铁一局广州分公司. 2019-04-18. Archived from the original on 2023-01-10. Retrieved 2024-01-06.
- 徐振天 (2020-04-28). "广州地铁七号线二期首座车站主体围护结构完工". 羊城晚报 (in Simplified Chinese). Archived from the original on 2022-05-12. Retrieved 2024-01-06.
- 李天研 (2021-05-02). "突破技术难关,地铁七号线二期首站封顶". 广州日报 (in Simplified Chinese). Archived from the original on 2023-01-17. Retrieved 2024-01-06.
- "广州地铁七号线二期车站完成"三权移交"". 中铁北京工程局集团 (in Simplified Chinese). 2023-11-06. Archived from the original on 2023-11-06. Retrieved 2024-01-05.