Yuangang 员岗 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Platform of the station | |||||||||||
Chinese name | |||||||||||
Simplified Chinese | 员岗站 | ||||||||||
Traditional Chinese | 員崗站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Panyu District, Guangzhou, Guangdong China | ||||||||||
Coordinates | 23°00′57″N 113°21′56″E / 23.015962°N 113.365641°E / 23.015962; 113.365641 | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
History | |||||||||||
Opened | 28 December 2016 | ||||||||||
Services | |||||||||||
| |||||||||||
Yuangang Station (Chinese: 员岗站) is a station of Line 7 on the Guangzhou Metro. The station is situated under Xingnan Avenue (兴南大道), located in Panyu District, Guangzhou. It began operations on 28 December 2016.
Station layout
G | Street level | Exit |
L1 Concourse |
Lobby | Customer Service, Vending Machines, Security Office |
L2 Platforms |
Platform 2 | 7 towards Meidi Dadao (Nancun Wanbo) |
Island platform, doors will open on the left | ||
Platform 1 | 7 towards Yanshan (Banqiao) |
Exits
Yuangang station currently has five exits, and exit F is under construction.
Exit number | Exit location | |
---|---|---|
Exit A | Xingnan Avenue | |
Exit B | Xingnan Avenue | |
Exit C | Xingnan Avenue | |
Exit E | Xingnan Avenue | |
Exit G | Xingnan Avenue |
History
When Line 7 was originally planned, there were two stations situated under Xingnan Avenue--Guantang Station (Chinese: 官堂站) and Jingkeng Station (Chinese: 金坑站). To accommodate the construction of the Nanda Highway, Line 7 in the Xingnan Avenue section had to lay under the north side of the road, so the original Guantang station did not have enough space to build, and then it merged with the Jinkeng station and moved to the current location.
On November 28, 2013, the station began construction. In July 2014, the station was formally renamed as Yuangang Station (Chinese: 员岗站). The main structure of the station was completed in early August 2015, and it opened on December 28, 2016.
References
- 画风诡异的七号线-广 州 区-地铁族. www.ditiezu.com (in Simplified Chinese). Retrieved 20 July 2017.
- 7号线拟撤金坑站__新浪广东新闻中心_新浪广东. news.gd.sina.com.cn (in Simplified Chinese). Guangzhou Daily. Retrieved 20 July 2017.
- 广州地铁 全程为你--公司新闻. www.gzmtr.com (in Simplified Chinese). Retrieved 20 July 2017.
- 穗地铁七、九号线站名公示_南方都市报数字报. epaper.oeeee.com (in Simplified Chinese). Retrieved 20 July 2017.
- 官堂站主体结构封顶 (in Simplified Chinese). Retrieved 20 July 2017.