Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
TPWS (Train Protection and Warning System), Vacuum Control, Slip/Slide Control, Main Overload Relay, Motor Over Load Relay, No Volt Relay, Over Voltage Protection and Earth Fault Relay, Oil Pressure Governor
The Indian locomotive class WAG-8 was a class of 25 kVACelectric locomotives that was developed in the early 1990s by Bharat Heavy Electricals Limited (BHEL) for Indian Railways. The model name stands for broad gauge (W), AC current (A), freight/goods traffic (G), eighth-generation (8). Only two units of this class were built, both prototypes.
This class provided the basic design for a number of other locomotives like the WCAM-2, the WCAM-3 and the WCAG-1.
History
The history of WAG-8 begins in the early 1990s with the aim of addressing the shortcomings of the previous WAG-5 class and remove steam locomotives from IR by a target date of 1990. The WAG-5, although successful, had become underpowered to meet the growing demands of the Indian Railways. So in the early 1990s BHEL decided to look for a successor to the WAG-5 class. The required specification was of a 5000-horsepower locomotive.
Initially, Indian Railways invited tenders to build locomotives to the new specification. The following responses were received:
CLW submitted their upgraded WAG-5 model with 5000 hp with Co-Co bogies.
BHEL submitted a 5000 hp locomotive with thyristors control and Co-Co bogies
Each company submitted their prototypes and Indian Railways designated these prototypes as the WAG-7 class and WAG-8 class respectively. Development on the WAG-8 class in 1990 while BHEL was also manufacturing WAG-5HS. Technologically the BHEL WAG-8 was meant to be superior to the WAG-7 which was effectively using tap-changer technology from the 1960s. They most likely had the Hitachi HS15250A seen in present-day WCAM-3 and WCAG-1. The WAG-8 locomotives were to be handed over to Railways for trial in December, 1992, but the whole project was cancelled due to arrival of the WAG-9, and thyristors control had become obsolete in favour of 3-phase AC technology. The prototype locomotive was subsequently condemned and parked on an unused rail sliding at BHEL, Jhansi, where it remained as of 2017.