Francesco Morosini at Langkawi International Maritime and Aerospace Exhibition (LIMA) 2023 in Malaysia. | |
History | |
---|---|
Italy | |
Name | Francesco Morosini |
Namesake | Francesco Morosini |
Ordered | 2014 |
Builder | Fincantieri, Muggiano |
Cost | €3.9 billion for 7 ships (unit cost depending on configuration) |
Laid down | 16 February 2018 |
Launched | 22 May 2020 |
Commissioned | 22 October 2022 |
Identification | Pennant number: P431 |
Status | Active |
General characteristics | |
Class and type | Thaon di Revel-class offshore patrol vessel |
Displacement | |
Length | |
Beam | 16.5 m (54 ft 2 in) |
Draught | 10.5 m (34 ft 5 in) |
Depth | 5 m (16 ft 5 in) |
Propulsion |
|
Speed |
|
Range | 5,000 nmi (9,300 km; 5,800 mi) at 15 knots (28 km/h; 17 mph) |
Complement | 173 beds (+ 30 on modular rear zone) |
Crew | PPA Full 120 crew;PPA Light+ + 90;PPA Light 90;( add 24 crew for two helos on board and other 89/59 beds for optional boarding team, marines team, maritime command staffs, etc.) |
Sensors and processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | |
Aviation facilities |
|
Francesco Morosini (P431) is the second ship of the Thaon di Revel-class offshore patrol vessels.
Development and design
The Italian Navy ordered the new MBDA TESEO MK/2E heavy-duty missile (TESEO "EVO"), a long-range anti-ship missile with also strategic land attack capability. The missile will have a new terminal "head" with dual RF seeker (Radio Frequency) and, presumably, date the need to even attack ground targets, IIR (Imaging IR). Compared to the predecessor OTOMAT/TESEO, the TESEO "EVO" MK/2E has a double range or more than 360 km. Former OTOMAT is accredited for a range of action of more than 180 km.
Construction and career
Francesco Morosini was laid down on 16 February 2018 at Fincantieri Muggiano and launched on 22 May 2020. The ship had been expected to be commissioned in March 2022 but she entered service on 22 October of that year.
References
- "Un nuovo TESEO land attack per la Marina - RID Portale Difesa". Archived from the original on 14 July 2018. Retrieved 3 November 2020.
- "Airpressonline.it". Archived from the original on 1 March 2020. Retrieved 3 November 2020.
- "Mbda, al via lo sviluppo del nuovo Teseo". 22 March 2018.
- redazione (3 October 2017). "Fincantieri: al via lavori secondo pattugliatore polivalente altura". Liguria Business Journal (in Italian). Retrieved 3 November 2020.
- Vavasseur, Xavier (22 May 2020). "Fincantieri Launched the 2nd PPA 'Francesco Morosini' for the Italian Navy". Naval News. Retrieved 3 November 2020.
- "Fincantieri, consegnata la seconda unità pattugliatori d'altura". ansa.it (in Italian). 22 October 2022. Retrieved 20 December 2024.
- "Fincantieri hands over second PPA OPV to Italian Navy". 24 October 2022.
External links
Media related to Francesco Morosini (P 431) at Wikimedia Commons
- Pattugliatori Polivalenti di Altura Marina Militare website
Thaon di Revel-class offshore patrol vessels | |
---|---|