Misplaced Pages

Kadubeesanahalli metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Upcoming Namma Metro station under Blue Line

Kadubeesanahalli
Namma Metro station
Under Construction of this metro station as of April 2024 under Phase 2A of Blue Line of Namma Metro
General information
LocationKadubeesanahalli, Bengaluru, Karnataka 560103
Coordinates12°55′56″N 77°41′15″E / 12.93225°N 77.68761°E / 12.93225; 77.68761
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station codeKDBH (TBC)
History
OpeningJune 2026; 17 months' time (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Bellandurtowards Central Silk Board Blue Line(Future Service) Kodibeesanahallitowards Krishnarajapura or KIAL Terminals
Route map
Legend
Yellow Line towards RV Road
Central Silk Board
Yellow Line
Under construction
HSR Layout
Red Line towards Hebbala
Agara
Red Line
Proposed
Ibbaluru
Red Line
Proposed
Red Line towards Sarjapura
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways Towards UpperLeft arrow Hosur and
LowerRight arrow Banaswadi or Baiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
Krishnarajapura Krishnarajapuram railway station Purple Line
Indian Railways Towards Left arrow Krishnarajapuram and
Down arrow Yelahanka Jn or Bengaluru Cantt. Right arrow
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura Orange Line
Red Line towards Sarjapura Up arrow
Orange Line to JP Nagar 4th Phase Right arrow
Hebbala Hebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Indian Railways Towards
Left arrow KSR Bengaluru and Yelahanka Jn Right arrow
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Indian Railways Towards
Left arrow Kolar and Yelahanka Jn Right arrow
Mainline rail interchange Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Location

Kadubeesanahalli is an upcoming elevated metro station on the North-South corridor of the Blue Line of Namma Metro in Bangalore, India. This metro station serves mainly Embassy TechnoVillage, which comprises IT companies such J.P. Morgan Chase, Cisco, Wells Fargo, New Horizon College of Engineering and Sakra World Hospital. This is a prime location for its neighbouring areas like Bellandur, Marathahalli, Ibbalur and HAL Aerospace Museum. This metro station is slated to become operational around June 2026.

History

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kadubeesanahalli metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board - Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Station Layout - To Be Confirmed

Kadubeesanahalli track layout (TBC)
Legend
to Kodibeesanahalli
P#P#
to Bellandur
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Northbound
Towards → Krishnarajapura / KIAL Terminals
Next Station: Kodibeesanahalli
Platform #
Southbound
Towards ← Central Silk Board
Next Station: Bellandur
Side platform | Doors will open on the left Disabled access
L2

Connections

This section is empty. You can help by adding to it. (December 2023)

Entry/Exit

This section is empty. You can help by adding to it. (December 2023)

See also

Portals:

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.
  6. "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.

External links

Namma Metro
Blue Line 5
Phase-2A
Phase-2B
Not In scope
Depot(s)
  • Baiyappanahalli & Doddajala
See also
*Stations in italics are Under Construction
Categories: