Misplaced Pages

Krishnarajapura metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Namma Metro's Purple & Blue Line interchange station

Krishnarajapura
Namma Metro station
KR Pura metro station
General information
Other namesKR Pura
LocationNH 44, Chinappa Colony, Mahadevapura, Bengaluru, Karnataka 560016
Coordinates13°00′00″N 77°40′41″E / 12.99999°N 77.67794°E / 12.99999; 77.67794
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Purple Line Blue Line
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Challaghatta
Side platform (TBC)
Platform-3 → Central Silk Board
Platform-4 → KIAL Terminals
Tracks2
ConnectionsMainline rail interchange KR Puram Railway Station
Construction
Structure typeElevated, Double track
Platform levels2 (Operational under Purple Line)
2 (Under Construction under Blue Line)
ParkingCar parking Two & Four Wheelers
AccessibleYes Disabled access
Architect  ITD - ITD Cementation India JV
  Shankaranarayana Constructions (SNC)
Other information
StatusStaffed
Station codeKRAM
History
Opened  26 March 2023; 20 months ago (2023-03-26)
Opening  June 2026; 17 months' time (June 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Singayyanapalyatowards Whitefield (Kadugodi) Purple Line Benniganahallitowards Challaghatta
Sarasvathi Nagaratowards Central Silk Board Blue Line(Future service) Kasturinagaratowards KIAL Terminals
Route map
Legend
Whitefield (Kadugodi) Parking Whitefield (Bangalore) railway station Bus interchange Kadugodi
Mainline rail interchange Kadugodi Depot
Hopefarm Channasandra Parking
Kadugodi Tree Park Parking
Pattandur Agrahara Parking
Sri Sathya Sai Hospital Parking
Nallurhalli ParkingBus interchange Whitefield TTMC
Kundalahalli Parking
Seetharamapalya Parking
Hoodi Parking
Garudacharapalya Parking
Singayyanapalya Parking
Indian Railways towards UpperLeft arrow Whitefield
Blue Line towards Central Silk Board
Krishnarajapuram (KR Puram) Parking Krishnarajapuram railway station
Blue Line
Under construction
Benniganahalli Bus interchange Tin Factory
Indian Railways towards Left arrow Yelahanka Jn
Blue Line towards KIAL Terminals
Indian Railways Towards UpperRight arrow Hosur and
LowerLeft arrow Banaswadi or Baiyyappanahalli Down arrow
Baiyappanahalli Parking Baiyappanahalli railway station
Swami Vivekananda Road Parking
IndiranagarParking
Halasuru
Trinity
Mahatma Gandhi Road
Pink Line
Under construction
Cubbon Park
Dr. B.R. Ambedkar Stn., Vidhana Soudha
Sir M. Visveswaraya Stn., Central College
Nadaprabhu Kempegowda Stn., Majestic Kempegowda Bus Station Bangalore City railway station Green Line
Krantivira Sangolli Rayanna Railway Station Bangalore City railway station
Magadi Road Parking
Sri Balagangadharanatha Swamiji Stn., HosahalliParking
Orange Line
Proposed
VijayanagarParking
Attiguppe Parking Bus interchange Vijayanagara TTMC
Indian Railways Towards
UpperLeft arrow Kengeri and KSR Bengaluru Right arrow
Deepanjali Nagar
Mysuru Road Parking
Orange Line
Proposed
Pantharapalya–Nayandahalli Parking
Rajarajeshwari NagarParking
Jnanabharathi Parking Mainline rail interchange Jnanabharathi Railway Station
Pattanagere
Kengeri Bus Terminal Parking Bus interchange Kengeri TTMC
Kengeri Parking
Mainline rail interchange Challaghatta Depot (U/C)
Challaghatta
Legend
Yellow Line towards RV Road
Central Silk Board
Yellow Line
Under construction
HSR Layout
Red Line towards Hebbala
Agara
Red Line
Proposed
Ibbaluru
Red Line
Proposed
Red Line towards Sarjapura
Bellandur
Kadubeesanahalli
Kodibeesanahalli
Marathahalli
ISRO
Indian Railways Towards UpperLeft arrow Hosur and
LowerRight arrow Banaswadi or Baiyyappanahalli
Doddanekundi
Bagmane Developers - DRDO Sports Complex
Sarasvathi Nagara
Krishnarajapura Krishnarajapuram railway station Purple Line
Indian Railways Towards Left arrow Krishnarajapuram and
Down arrow Yelahanka Jn or Bengaluru Cantt. Right arrow
Mainline rail interchange Baiyappanahalli Depot (U/C)
Kasturi Nagar
Horamavu
HRBR Layout
Kalyan Nagar
HBR Layout
Nagawara
Pink Line
Under construction
Veerannapalya
Kempapura Orange Line
Red Line towards Sarjapura Up arrow
Orange Line to JP Nagar 4th Phase Right arrow
Hebbala Hebbal railway station
Red Line
Planned
Kodigehalli
Jakkur Cross
Jakkur Plantation (no scope)
Indian Railways Towards
Left arrow KSR Bengaluru and Yelahanka Jn Right arrow
Yelahanka
Bagalur Cross
Bettahalasuru (no scope)
Chikkajala (future)
Doddajala
Indian Railways Towards
Left arrow Kolar and Yelahanka Jn Right arrow
Mainline rail interchange Doddajala Depot (U/C)
(at-grade)
Airport City
KIAL Terminals
Location

Krishnarajapura (abbreviated as K.R. Pura) is an important elevated metro station on the East-West corridor of the Purple Line as well as the South-North corridor of the upcoming Blue Line of Namma Metro in Bengaluru, India. This will be an upcoming interchange metro station after Nadaprabhu Kempegowda Stn., Majestic having interchange with Purple and Green Lines. Around this station, holds the main KR Puram Railway station followed by some locations like KR Pura Hanging Bridge leading towards Hoskote, Tin Factory, ITI General Hospital and many more. This station under Blue Line is planned to be operational around the year 2026 (TBC).

The Whitefield - Krishnarajapura trial runs were successfully conducted (under Purple Line) from 25 October for a month. This metro station (under Purple Line) was inaugurated on March 25, 2023 by Prime Minister Narendra Modi and was commenced to the public on March 26, 2023.

History

Blue Line

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the metro station, part of the 8.377 km Reach 2A – Package 2 (Kodibeesanahalli - Krishnarajapura) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

Krishnarajapura track layout
Legend
to Benniganahalli
P2P1
to Singayyanapalya
Station with two tracks and two side platforms
Krishnarajapura track layout **
Legend
to Kasturi Nagar
P#P#
to Sarasvathi Nagar
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi)
Next Station: Singayyanapalya
Platform 2 Westbound Towards ← Challaghatta
Next Station: Benniganahalli
Island platform | P2 & P# doors will open on the left Disabled access
Blue Line Station Layout & Platform Numbers - (TBC)
Platform #
Westbound
Towards → KIAL Terminals
Next Station: Kasturinagara
Platform #
Eastbound
Towards ← Central Silk Board
Next Station: Sarasvathi Nagara
Side platform | Doors will open on the left Disabled access
L2


Timeline

Connections

This metro station is connected with Krishnarajapuram of Indian Railways network.

Entry/Exit

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A - Towards KR Pura Railway Station side
  • Entry/Exit point B - Towards Whitefield Main Road side

See also

Portals:

References

  1. "Whitefield metro line: Ahead of inauguration, names of six stations changed".
  2. "Baiyappanahalli-Whitefield Metro stretch to have 13 stops". The New Indian Express. Retrieved 21 June 2022.
  3. Rustagi, Abha (5 May 2022). "Baiyappanahalli-Whitefield Line to be functional from Dec 2022". Metro Rail News. Retrieved 21 June 2022.
  4. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  5. Philip, Christin Mathew (28 November 2022). "Bangalore Metro Rail Corporation Limited plans combined station for 2 lines at Iblur". The Times of India. Retrieved 28 November 2022.
  6. "Baiyappanahalli-Whitefield metro line trial from October 25". Deccan Herald. 5 October 2022. Retrieved 6 October 2022.
  7. "Metro finally comes to Whitefield, take a ride on March 26 from 7 am!". Deccan Herald. 26 March 2023. Retrieved 26 March 2023.
  8. "Bengaluru Metro: Much awaited metro line between Whitefield to KR Puram to be operational by March". TimesNow. 25 November 2022. Retrieved 28 November 2022.
  9. Bureau, The Hindu (3 February 2023). "Namma Metro train between K.R. Puram and Whitefield to run at frequency of 10 minutes". The Hindu. ISSN 0971-751X. Retrieved 3 February 2023. {{cite news}}: |last= has generic name (help)
  10. "ಮಾರ್ಚ್ 25ಕ್ಕೆ ವೈಟ್‌ಫೀಲ್ಡ್-ಕೆಆರ್ ಪುರಂ ಮೆಟ್ರೋ ಸೇವೆ ಲೋಕಾರ್ಪಣೆ?". Kannadaprabha (in Kannada). Retrieved 14 March 2023.
  11. "BMRCL to zoom metro from KR Puram to Whiefield in 22 minutes". The New Indian Express. Archived from the original on 2 March 2023. Retrieved 2 March 2023.
  12. "Namma Metro: Why upcoming Whitefield stretch is a game changer for Bengaluru?". TimesNow. 5 March 2023. Retrieved 5 March 2023.
  13. "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.

External links

Namma Metro
Purple Line 1
Blue Line 5
Phase-2A
Phase-2B
Not In scope
Depot(s)
  • Kadugodi & Challaghatta (U/C)
  • Baiyappanahalli & Doddajala
See also
*Stations in italics are Under Construction


Stub icon

This article about a railway station in the Indian state of Karnataka is a stub. You can help Misplaced Pages by expanding it.

Categories: