Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
Line 10 of the Chengdu Metro (simplified Chinese: 成都地铁10号线; traditional Chinese: 成都地鐵10號線; pinyin: Chéngdū Dìtiě Shí Hào Xiàn) runs from Taipingyuan in Wuhou to Xinping in Xinjin. Currently, the line is 37.972 km (23.6 mi) long. In 2024, the line will be 43.9 km long with the 5.9 km northeastern extension (Phase 3) to People's Park.
Phase I of Line 10 began construction in July 2014 and opened in September 2017. Phase II began construction in 2016 and opened on December 27, 2019.
It is the first line in Chengdu Metro to use 6-car Type A rolling stock for service.
Line 10's color is sky blue.
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Taipingyuan — Shuangliu International Airport Terminal 2
6 September 2017
10.937 km (6.8 mi)
6
Phase 1
Shuangliu International Airport Terminal 2 — Xinping