Article snapshot taken from Wikipedia with creative commons attribution-sharealike license.
Give it a read and then ask your questions in the chat.
We can research this topic together.
Chengdu Metro Line 27 (Chinese: 成都地铁27号线; pinyin: Chéngdū Dìtiě Èrshíqī Hào Xiàn) is a rapid transit line in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue.
The first phase will be from Xindu DistrictShifo station to Qingyang DistrictShuxin Road station. The line is 24.86 km long with 23 stations. From the north, the line has a 7.52 km long elevated section with 6 stations, followed by a 17.34 km underground section with 17 stations. Phase 1 started construction on 18 May 2020, and is opened on 19 December 2024.
Progress
On 17 June 2019, the NDRC approved the fourth phase expansion for the Chengdu Metro. It consists of Line 8 Phase 2, Line 10 Phase 3, Line 13 Phase 1, Line 17 Phase 2, Line 18 Phase 3, Line 19 Phase 2, Line 27 Phase 1, Line 30 Phase 1. The Fourth Phase consists of 176.65 km (109.77 mi) of new lines.
On 18 March 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.
On 18 May 2020,Line 8 Phase 2, Line 27 Phase 1, Line 30 Phase 1 started construction. This marks the date all 4th Phase projects started construction.
On 21 March 2023, Line 27 finished all station construction.
On 19 December 2024, Line 27 opened for service, except Bairendian station which its connection roads are currently incomplete.
Stations
There are 7.52 km that are on ground with 6 stations; and a 17.34 km underground tunnel with 17 stations. Phase 1 has 9 interchange stations
"成都地铁8号线二期、27号线一期、30号线一期开工 轨道交通第四期建设规划全部开工" [Phase II of Chengdu Metro Line 8, Phase I of Line 27, and Phase I of Line 30 have started, and construction planning for the fourth phase of rail transit has all started]. sichuan.scol.com.cn (in Chinese).