You can help expand this article with text translated from the corresponding article in Hungarian. (January 2018) Click for important translation instructions.
|
This article does not cite any sources. Please help improve this article by adding citations to reliable sources. Unsourced material may be challenged and removed. Find sources: "M8 motorway" Hungary – news · newspapers · books · scholar · JSTOR (August 2012) (Learn how and when to remove this message) |
M8 motorway | |
---|---|
M8-as autópálya | |
Pentele Bridge | |
Route information | |
Part of E66 | |
Length | 10.2 km (6.3 mi)330.2 km (205.2 mi) planned |
Major junctions | |
From | Rábafüzes near Szentgotthárd |
Major intersections | M7 near Székesfehérvár M6 near Dunaújváros |
To | Szolnok |
Location | |
Country | Hungary |
Major cities | Veszprém, Kecskemét, Szolnok |
Highway system | |
|
The M8 motorway is a planned Hungarian motorway, which will, upon completion, connect the western part of the country, near the Austrian border to Szolnok in the central part of the country. It will be partially concurrent with the European route E66 (Graz – Veszprém – Székesfehérvár).
The construction was reported to be started in 2007 (a few tiny sections were built, including the Pentele Bridge over the Danube) and it had been planned to be completed around 2015 but as of 2013 the plans were not even finalized and the even the permission phase for several smaller parts took more than 2 years.
The completed section of motorway is 8 km long, stretching from Baracs to Apostag. Its major junctions are with M6 (Baracs), Route 6 (Kisapostag), and Route 51 (Apostag). It crosses over the Danube river, on the Pentele Bridge.
Highways in Hungary | ||
---|---|---|
Motorways | ||
Expressways | ||
under construction or planned | ||
former projects |
This Hungarian road or road transport-related article is a stub. You can help Misplaced Pages by expanding it. |