Misplaced Pages

Mutiara Damansara MRT station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Mutiara Damansara station) MRT station in Petaling Jaya, Selangor, Malaysia
 KG08  Mutiara Damansara
Rapid KL Logo | MRT station
Exterior view of the station above Persiaran Surian.
General information
Other namesChinese: 珍珠白沙罗
Tamil: முத்தியாரா டாமன்சாரா
LocationPersiaran Surian
Mutiara Damansara, Petaling Jaya, Kuala Lumpur, Malaysia
Coordinates3°9′18.62″N 101°36′31.66″E / 3.1551722°N 101.6087944°E / 3.1551722; 101.6087944
Owned byMRT Corp
Line(s)9 Kajang
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
Platform levels3
ParkingNot available
Bicycle facilitiesAvailable. 18 bicycle bays.
AccessibleYes
Other information
Station code KG08 
History
Opened16 December 2016
Services
Preceding station Following station
Suriantowards Kwasa Damansara Kajang Line Bandar Utamatowards Kajang

Mutiara Damansara station is a mass rapid transit station serving the suburb of Mutiara Damansara in Petaling Jaya, Selangor, Malaysia.

It is one of the stations on the MRT Kajang Line. The station was opened on 16 December 2016 when the first phase of the line was opened.

The station is located adjacent to the Mutiara Damansara commercial area where The Curve Shopping Centre, Royale Chulan Hotel, IKEA Damansara, Lotus's Mutiara Damansara and other buildings are located.

Station Features

The station adopts the standard elevated station design for the MRT Kajang Line, with two side platforms above the concourse level. The station is located above Persiaran Surian, with its supporting columns sited between the Persiaran Surian underpass and the at-grade Petaling Jaya-bound lanes of the road.

Station layout

L2 Platform Level Side platform
Platform 1 9 Kajang towards Kajang  KG35  (→)
Platform 2 9 Kajang towards Kwasa Damansara  KG04  (←)
Side platform
L1 Concourse Faregates, Ticketing Machines, Customer Service Office, Station Control, Shops, pedestrian walkway to Surian Link
G Ground Level Entrance A, B and C with Feeder Bus Stop, Taxi Lay-By, Kiss and Ride Lay-By

Exits and entrances

Unlike most other elevated stations of the MRT Kajang line, the Mutiara Damansara station has four entrances, allowing it to be accessed from both sides of Persiaran Surian, both sides of Jalan PJU 7/1 as well as having a direct pedestrian link with neighbouring commercial buildings.

Kajang Line station
Entrance Location Destination Picture
A South side of Persiaran Surian Feeder bus stop, trunk line bus stop, taxi and private vehicle lay-bys, Dataran Bandar Utama, Persiaran Bukit Utama, SMK Bandar Utama Damansara 4
B East side of Jalan PJU 7/1 Feeder bus stop, Royale Chulan Hotel main lobby
C West side of Jalan PJU 7/1 Feeder bus stop, Mutiara Damansara
D Pedestrian link to Surian Link Surian Tower, Royale Chulan Hotel, The Curve, IPC Shopping Centre, Lotus's Mutiara Damansara

Bus Services

Feeder buses

With the opening of the MRT Sungai Buloh-Kajang Line, feeder buses also began operating linking the station with several housing areas in Mutiara Damansara, Damansara Perdana, Bandar Utama and Bukit Lanjan. The feeder buses operate from the station's feeder bus stops adjacent to the station, accessed via Entrance B and Entrance C of the station.

Route No. Origin Desitination Via
T809  KG08  Mutiara Damansara station
Entrance C
Damansara Perdana
Bandar Utama
Jalan PJU 7/7
Jalan PJU 7/15
Jalan PJU 8/1
Jalan PJU 7/1
 KG08  Mutiara Damansara station
(Entrance B)

Tengkat Bandar Utama
Central Park Avenue
1 Utama Shopping Center New Wing
Damansara-Puchong Highway
Persiaran Surian
T810  KG08  Mutiara Damansara station
Entrance B
Bukit Lanjan Persiaran Surian
Jalan Damansara (Bukit Lanjan)
Jalan PJU 8/8
Jalan PJU 7/1

Other buses

Route No. Origin Desitination Via
780 Pasar Seni Section 8, Kota Damansara Jalan Tun Tan Cheng Lock
Jalan Tun Sambanthan (KL Sentral)
Jalan Bangsar
 KJ16  Bangsar LRT station
Federal Highway
Jalan Utara
Jalan Semangat
Jalan SS 2/55
Damansara-Puchong Expressway (Bandar Utama)
Persiaran Surian
 KG08  Mutiara Damansara MRT Station
(Entrance A for Kota Damansara-bound,
IKEA bus stop for KL Sentral-bound)

 KG07  Surian MRT station
(Entrance A for Kota Damansara-bound,
Entrance B for Pasar Seni-bound)

 KG06  Kota Damansara MRT station
(Entrance A for Kota Damansara-bound,
Entrance B for Pasar Seni-bound)

Persiaran Mahogani
Jalan Pekaka
801 Bandar Utama bus hub  PY09  Metro Prima Central Park Avenue
Damansara-Puchong Expressway (Bandar Utama)
 KG07  Mutiara Damansara MRT Station
(Entrance C for Metro Prima-bound,
Entrance B for Bandar Utama-bound)

Jalan PJU 8/1
Damansara-Puchong Expressway (Penchala Toll Plaza)
Persiaran Ara
Persiaran Meranti
Persiaran Perdana
Jalan Kuala Selangor
Jalan Lingkaran Tengah 2/Middle Ring Road 2 (MRR2)
Jalan Kepong
 PY09  Metro Prima MRT station
(Entrance A for Metro Prima-bound,
Entrance B for Bandar Utama-bound)

802  KJ24  Kelana Jaya Section 11, Kota Damansara Damansara-Puchong Expressway
Persiaran Bandar Utama
 KG09  Bandar Utama MRT Station
Lebuh Bandar Utama
 KG07  Mutiara Damansara MRT Station
(Entrance A for Kota Damansara-bound,
IKEA bus stop for LRT Kelana Jaya-bound)

Jalan Camar
PJ06 Bandar Utama bus hub Damansara Perdana
Bandar Sri Damansara
Damansara Damai
Central Park Avenue
Damansara-Puchong Expressway (Bandar Utama)
 KG07  Mutiara Damansara MRT Station
(Entrance C for Damansara Damai-bound,
Entrance B for Bandar Utama-bound)

Jalan PJU 8/1
Damansara-Puchong Expressway (Penchala Toll Plaza)
Persiaran Ara
Persiaran Perdana
Jalan PJU 10/9
Jalan PJU 10/1A
Jalan PJU 10/1

Gallery

Station

  • View of the station above Persiaran Surian from street level. View of the station above Persiaran Surian from street level.
  • Train from Sungai Buloh approaching the Mutiara Damansara MRT station. Train from Sungai Buloh approaching the Mutiara Damansara MRT station.
  • View of the Mutiara Damansara MRT station from the east. View of the Mutiara Damansara MRT station from the east.
  • The information counter at Mutiara Damansara MRT. The information counter at Mutiara Damansara MRT.
  • The ticketing counter at Mutiara Damansara MRT station. The ticketing counter at Mutiara Damansara MRT station.
  • Leading to the platforms at Mutiara Damansara MRT station. Leading to the platforms at Mutiara Damansara MRT station.
  • The concourse of Mutiara Damansara MRT station. The concourse of Mutiara Damansara MRT station.
  • The concourse of Mutiara Damansara MRT station. The concourse of Mutiara Damansara MRT station.
  • An MRT train stopping at Mutiara Damansara MRT station. An MRT train stopping at Mutiara Damansara MRT station.
  • Kajang-bound platform at the station. Kajang-bound platform at the station.
  • Kwasa Damansara-bound platform at the station. Kwasa Damansara-bound platform at the station.
  • A ticket machine in Mutiara Damansara station. A ticket machine in Mutiara Damansara station.

Entrances

  • Entrance A along Persiaran Surian (Kota Damansara-bound). Entrance A along Persiaran Surian (Kota Damansara-bound).
  • The stairs for Entrance A at Persiaran Surian (Kota Damansara-bound). The stairs for Entrance A at Persiaran Surian (Kota Damansara-bound).
  • Entrance A to the Mutiara Damansara station. Entrance A to the Mutiara Damansara station.
  • Covered walkway along Persiaran Surian towards Entrance A. Covered walkway along Persiaran Surian towards Entrance A.
  • The signage of Entrance B at Mutiara Damansara MRT station. The signage of Entrance B at Mutiara Damansara MRT station.
  • Feeder bus stop at Entrance B. Feeder bus stop at Entrance B.
  • The left leads to the station, the right goes to the exit of Entrance B. The left leads to the station, the right goes to the exit of Entrance B.
  • Entrance C on Jalan PJU 7/1 Entrance C on Jalan PJU 7/1
  • Entrance C and the pedestrian bridge over Jalan PJU 7/1 to the station. Entrance C and the pedestrian bridge over Jalan PJU 7/1 to the station.
  • Entrance B and Entrance C at both sides of Jalan PJU 7/1. Entrance B and Entrance C at both sides of Jalan PJU 7/1.
  • Feeder bus stops at Entrance B (right) and Entrance C. Feeder bus stops at Entrance B (right) and Entrance C.

Pedestrian link to Surian Link

  • Entrance D of the station from the link bridge. Entrance D of the station from the link bridge.
  • Link bridges connect buildings to the MRT station via the link bridge. Link bridges connect buildings to the MRT station via the link bridge.
  • Good signage leading to the station from eCurve. Good signage leading to the station from eCurve.
  • Escalators leading from Surian Link to the station. Escalators leading from Surian Link to the station.
  • View of the Surian Tower-Mutiara Damansara MRT station link bridge from the MRT station exit. View of the Surian Tower-Mutiara Damansara MRT station link bridge from the MRT station exit.
  • View of the same location in January 2017 when the escalators were still being installed. View of the same location in January 2017 when the escalators were still being installed.
  • Good signage begins in The Curve leading people to the station via the link bridge. Good signage begins in The Curve leading people to the station via the link bridge.

See also

References

  1. "Prime Minister Launches Phase One of the MRT Sungai Buloh-Kajang Line" (PDF). Klang Valley MRT Project. Mass Rapid Transit Corporation Sdn Bhd. Archived from the original (PDF) on 5 March 2017. Retrieved 11 November 2017.
  2. "Top 10 attractions near latest MRT stations". Thestar.com.my. 2016-12-17. Retrieved 2017-11-11.
  3. RapidKL Route T809
  4. RapidKL Route T810
  5. RapidKL Bus Route 780
  6. https://myrapidbus.prasarana.com.my/kiosk?route=837&bus= RapidKL Bus Route 801]
  7. RapidKL Bus Route 802
  8. RapidKL Bus Route PJ06

External links

Greater KL/Klang Valley Area rail transit stations
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
3 Ampang Line
4 Sri Petaling Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail
9 Kajang Line
10 KL Sentral-Terminal Skypark Line
11 Shah Alam Line
Phase 1
Opening 2025
Phase 2
12 Putrajaya Line
13 Circle Line
Opening 2028-2030
B1 BRT Sunway Line
Stations and services in italics are planned or under construction
Categories: