(Redirected from KL Sentral-Terminal Skypark Line) Railway line in Malaysia
KL Sentral–Terminal Skypark Line
KL Sentral–Terminal Skypark Line train set at Terminal Skypark station.
Overview
Native nameKTM Laluan KL Sentral–Terminal Skypark
StatusSuspended
OwnerKeretapi Tanah Melayu Keretapi Tanah Melayu
Line number10 (brown)
LocaleKuala LumpurSubang JayaSubang Airport
Termini
Stations3 + 2 reserve stations
Websitewww.ktmb.com.my/Skypark.html
Service
Type
SystemKTM Komuter KTM Komuter
Operator(s)Keretapi Tanah Melayu Keretapi Tanah Melayu
Depot(s)Sentul
Rolling stockKTM Class 83 EMU
Four 3-car trainsets
History
Opened1 May 2018; 6 years ago (2018-05-01)
Closed15 February 2023; 22 months ago (2023-02-15)
Technical
Line length26 km (16 mi)
CharacterGround and elevated
Track gauge1,000 mm (3 ft 3+3⁄8 in) metre gauge
Electrification25 kV 50 Hz AC overhead line
Conduction systemWith driver
Operating speedUp to 100 km/h
Route map

Legend

service suspended since 15 February 2023

Batu Caves–Pulau Sebang Line to Batu Caves &
Tanjung Malim–Port Klang Line to Tanjung Malim
KA01 KL Sentral KTM ETS 1 2 5 6 7 8 9
Batu Caves–Pulau Sebang Line
to Pulau Sebang/Tampin
KD01 Abdullah Hukum
KD02 Angkasapuri
KD03 Pantai Dalam
KD04 Petaling
Kuala Lumpur
Selangor
border
KD05 Jalan Templer
KD06 Kampung Dato Harun
KD07 Seri Setia
KD08 Setia Jaya
KD09 Subang Jaya Parking oBike 2 5
Tanjung Malim–Port Klang Line
to Port Klang
Glenmarie (KTM) (planned)
Sri Subang (planned)
Terminal Skypark Parking

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange
rapid transit
commuter rail

The KTM KL Sentral–Terminal Skypark Line (formerly known as the Skypark Link) is a currently suspended limited express train service in Kuala Lumpur, Malaysia between Kuala Lumpur Sentral (KL Sentral) and Sultan Abdul Aziz Shah Airport (Subang Airport). It is Malaysia's second airport rail link service, after the Express Rail Link system (KLIA Ekspres and KLIA Transit).

Operated by Keretapi Tanah Melayu (KTM), the service shares the same tracks as the Tanjung Malim–Port Klang Line between KL Sentral and Subang Jaya, however, it branches off after Subang Jaya, where it heads towards Subang Airport. Ordinary Tanjung Malim–Port Klang Line trains stop at all stations between KL Sentral and Subang Jaya, while the KL Sentral–Terminal Skypark Line runs non-stop between them. One new station, the Terminal Skypark station, located opposite Subang Airport, is built to serve the line. Two reserve stations were planned between Subang Jaya and Terminal Skypark, but are currently not constructed.

The line is one of the components of the Klang Valley Integrated Transit System. It is numbered 10 and colored brown on official transit maps.

Services are temporarily suspended since 15 February 2023 due to low ridership, the funds to operate the service was said to be reallocated to KTMB's MyRailLife program enabling students and disabled folks to ride for free. The trainsets are redeployed to serve the KTM Komuter Northern Sector. The service will only be resumed in a new modal once the Subang airport terminal finished its refurbishment under the Subang Airport Regeneration Plan (SARP).

Line information

KL Sentral–Terminal Skypark Line board in KL Sentral

Route

Location of Skypark Link
KL Sentral–Terminal Skypark Line route map showing the skipped stations

The 26 km (16 mi) KL Sentral-Terminal Skypark Line commenced operations on 1 May 2018 and runs between KL Sentral and Subang Skypark with a stop in Subang Jaya. In contrast to ordinary Port Klang Line services, after leaving Subang Jaya, the KL Sentral-Terminal Skypark Line skips all stations between Setia Jaya and Abdullah Hukum, both stations inclusive.

The journey time from KL Sentral to Subang Skypark is 30 minutes.

Operations began on 1 May 2018 with free rides available until the end of the year. Free rides were only provided for trips that begin or end at Terminal Skypark; no free rides were given for trips between KL Sentral and Subang Jaya only.

Stations

This section does not cite any sources. Please help improve this section by adding citations to reliable sources. Unsourced material may be challenged and removed. (October 2024) (Learn how and when to remove this message)

The three stations served by the KL Sentral-Terminal Skypark Line are, from east to west:

Station Code Station Name Type Notes
 KS01  KL Sentral Terminus (Side) Northern terminus.

Cross-platform interchange with  KA01  Batu Caves–Pulau Sebang Line, Tanjung Malim–Port Klang Line and KTM ETS.

Connecting station, without paid-area integration, to:

Feeder bus T819  to  KG13  Pusat Bandar Damansara on the MRT Kajang Line.

 KS02  Subang Jaya Side Connecting station, without paid-area integration, to  KJ28  LRT Kelana Jaya Line.

Cross-platform interchange to  KD09  Tanjung Malim–Port Klang Line.

Glenmarie - reserve station
Sri Subang - reserve station
 KS03  Terminal Skypark Terminus (Side) Western terminus.

Pedestrian access to Sultan Abdul Aziz Shah Airport.

Feeder bus T804  to  KG05  Kwasa Sentral on the MRT Kajang Line.

Frequency

Services were suspended between March 2020 and October 2021 due to the Coronavirus pandemic. Services were restored on 15 October 2021. Services were suspended again from 15 February 2023 due to low ridership. The former timetable is here.

There were 25 services a day: 12 trips from KL Sentral to the airport, and 13 trips from the airport to KL Sentral.

Rolling stock

interior seats of KL Sentral–Terminal Skypark Line trains
interior seats of KL Sentral–Terminal Skypark Line trains

The service uses four refurbished KTM Class 83 electric multiple units (EMUs). The original livery, which featured blue and yellow colors associated with ordinary KTM Komuter services, was changed to grey and orange. The trains are expected to accommodate up to 300 passengers at once and are intended to lighten traffic congestion and serve air passengers and people working at Subang Airport.

Background

The rail track being constructed, taken from Persiaran Kerjaya, Glenmarie

The Electrified Double Tracking Project consists of two phases: Phase 1 between Subang Jaya and Subang Skypark, which was awarded to Konsortium Skypark Link–Lion Pacific Sdn Bhd, and Phase 2 from Subang Skypark, through Kampung Melayu Subang and Ladang Elmina and ending at Sungai Buloh station to allow rail cargo traffic to bypass downtown Kuala Lumpur.. However, unconfirmed reports state that alternative plans, including an extension of the ECRL to Serendah instead of extending the KL Sentral-Terminal Skypark Line, were being studied.

The construction of the link was funded by the Ministry of Transport to provide rail-based public transport to connect the Sultan Abdul Aziz Shah (SAAS) Airport and its vicinity with the existing KTM railway. The RM521 million rail link was commissioned in 2013 with an initial completion date in 2016, but this was later extended to 2018.

The project consists of two main parts: an at-grade section between Subang Jaya and the old Sri Subang spur line for the length of 4.09 km (2.541 mi) using the existing railway reserve previously funded by Petronas to transport fuel from Port Klang to the airport, and a new section between the new location of Sri Subang station for the total length of 4.067 km (2.527 mi) which is elevated along the existing Sungai Damansara river reserve, ending at the car park just outside the airport.

KTM KL Sentral–Terminal Skypark Line Logo

Connection with KLIA

This section does not cite any sources. Please help improve this section by adding citations to reliable sources. Unsourced material may be challenged and removed. (October 2024) (Learn how and when to remove this message)

The KL Sentral–Terminal Skypark Line interchanges with the Express Rail Link at KL Sentral, thus allowing rail connection between the Subang Airport and the Kuala Lumpur International Airport (KLIA).

See also

References

  1. Menon, Priya (8 August 2014). "Work on railway line from Subang airport to KL Sentral has begun - Community | The Star Online". The Star. Retrieved 17 March 2015.
  2. "PROJEK LANDASAN KERETAPI DARI SUBANG KE TERMINAL SKYPARK SUBANG | Laman Web Rasmi Suruhanjaya Pengangkutan Awam Darat". S.P.A.D. Retrieved 17 March 2015.
  3. "Skypark-KL Sentral rail link to be temporarily halted starting Feb 15". The Star. Retrieved 2023-07-12.
  4. "Seamless integration to take off next". The Star. Retrieved 2023-07-12.
  5. Anis Zalani (2 May 2024). "Transport minister: Skypark link service to resume with revised approach". Malay Mail. Archived from the original on 21 August 2024. Retrieved 21 August 2024.
  6. "FREE RIDE CONTINUES..." (PDF). Retrieved 17 July 2018.
  7. "Skypark Link service suspended from Feb 15". New Straits Times. Retrieved 21 January 2023.
  8. "KL Sentral-Subang Skypark train service starts in May". Free Malaysia Today. 16 March 2018. Retrieved 1 April 2018.
  9. EdgeProp.my (27 March 2018). "KL Sentral-Subang Skypark rail service starts early May". The Edge Markets. Retrieved 1 April 2018.
  10. "PROJEK LANDASAN KERETAPI DARI SUBANG KE TERMINAL SKYPARK SUBANG - Laman Web Rasmi Suruhanjaya Pengangkutan Awam Darat (S.P.A.D.)". www.spad.gov.my.

External links

Malaysia Rail transport in Malaysia
Overview
Fares and ticketing
Statutory authority
Major Operators
Inter-city rail
Main Lines
Current
Future
Planning
Shelved
Services
Commuter rail
Suburban
Current
Airport Link
Current
Metro rail
LRT
Current
Future
Planning
MRT
Current
Planning
ART
Future
Monorail
Current
Planning
Border link
Current
Future
Other rail
People mover
Funicular
Gondola lift
Rolling stock
& manufacturers
Inter-city
Commuter
Airport link
LRT
MRT
Monorail
Others
Depots
Current
Future
Related articles
Greater KL/Klang Valley Area rail transit stations
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
3 Ampang Line
4 Sri Petaling Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail
9 Kajang Line
10 KL Sentral-Terminal Skypark Line
11 Shah Alam Line
Phase 1
Opening 2025
Phase 2
12 Putrajaya Line
13 Circle Line
Opening 2028-2030
B1 BRT Sunway Line
Stations and services in italics are planned or under construction
Urban rail transit in Southeast Asia
Indonesia Indonesia
Java
Sumatra
Lesser Sunda Islands
Laos Laos
Malaysia Malaysia
Peninsular Malaysia
East Malaysia
Myanmar Myanmar
Philippines Philippines
Luzon
Visayas
Mindanao
Singapore Singapore
Thailand Thailand
Bangkok Metropolitan
Provincial
Vietnam Vietnam
Note: Under construction & planned lines are in Italics
Categories: