Misplaced Pages

Ninh Thuận 1 Nuclear Power Plant

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Cancelled power plant in Vietnam
You can help expand this article with text translated from the corresponding article in Vietnamese. Click for important translation instructions.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Vietnamese Misplaced Pages article at ]; see its history for attribution.
  • You may also add the template {{Translated|vi|Nhà máy điện hạt nhân Ninh Thuận}} to the talk page.
  • For more guidance, see Misplaced Pages:Translation.
Ninh Thuận 1 Nuclear Power Plant
CountryVietnam
LocationPhước Dinh in Thuận Nam District, Ninh Thuận Province
Coordinates11°24′48″N 108°58′29″E / 11.41333°N 108.97472°E / 11.41333; 108.97472
StatusProposed
Construction began2027 or 2028 (planned)
OwnerVietnam Electricity
OperatorVietnam Electricity
Nuclear power station
Reactor typeVVER
Reactor supplierAtomstroyexport
Power generation
Units planned4 x 1,000 MWe
Nameplate capacity4,000 MW
[edit on Wikidata]

The Ninh Thuận 1 Nuclear Power Plant was a planned nuclear power plant at Phước Dinh in Thuận Nam District, Ninh Thuận Province, Vietnam. Plans for it were cancelled in 2016. It would have consisted of four 1,200 MWe VVER pressurised water reactors. The plant was to be built by Atomstroyexport, a subsidiary of Rosatom. It would have been owned and operated by state-owned electricity company Vietnam Electricity. Fuel will have been supplied and used fuel will be reprocessed by Rosatom. The feasibility study was to be carried out by E4 Group.

The plant would have been built based on a nuclear power development plan, approved by the Vietnamese government in 2007. In 2009, Vietnam's National Assembly approved a resolution on investment policy for the project. On 31 October 2010, Vietnamese government and Rosatom signed a construction agreement.

Works to prepare the construction site started in December 2011. Construction was to start by 2014 and the first unit to be commissioned by 2020. However, in 2014, the Prime Minister Nguyen Tan Dung announced that the construction would be postponed until 2020 to ensure the highest degree of safety. The construction is financed by the US$8 billion loan from Russia.


See also

References

  1. "Vietnam abandons plan for first nuclear power plants". Reuters. 2016-11-22. Retrieved 2019-12-04.
  2. ^ "Russia to build nuclear plant in Vietnam". World Nuclear News. 2010-11-01. Retrieved 2011-12-03.
  3. "Vietnam signs up Japan for Ninh Thuan 2". Nuclear Engineering International. 2010-11-03. Archived from the original on 2012-06-07. Retrieved 2011-12-03.
  4. "Russia to build nuclear plant in Vietnam". World Nuclear News. 2009-11-25. Archived from the original on 2014-12-06. Retrieved 2011-12-03.
  5. "Russian specialists embark on construction of Vietnamese nuke plant". RIA Novosti. 2011-12-02. Retrieved 2011-12-03.
  6. "Vietnam delays building 1st nuclear power plant". Associated Press. 2014-01-15. Retrieved 2015-06-04.
  7. "Russia to grant $8 bln loan to Vietnam to build first nuke plant". RIA Novosti. 2011-11-23. Retrieved 2011-12-03.