Misplaced Pages

Ninh Thuận 2 Nuclear Power Plant

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
You can help expand this article with text translated from the corresponding article in Vietnamese. Click for important translation instructions.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Misplaced Pages.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Vietnamese Misplaced Pages article at ]; see its history for attribution.
  • You may also add the template {{Translated|vi|Nhà máy điện hạt nhân Ninh Thuận 2}} to the talk page.
  • For more guidance, see Misplaced Pages:Translation.
Ninh Thuận 2 Nuclear Power Plant
CountryVietnam
LocationVĩnh Hải, Ninh Hải District, Ninh Thuận Province
Coordinates11°41′26″N 109°10′31″E / 11.69056°N 109.17528°E / 11.69056; 109.17528
StatusCancelled
OperatorEVN
Power generation
Units planned4 x 1,000 MWe
Nameplate capacity
  • 4,000 MW
[edit on Wikidata]
The fishing village of Tay An, which was the planned site of the power plant.

The Ninh Thuận 2 Nuclear Power Plant is a cancelled nuclear power plant at Vĩnh Hải, Ninh Hải District, Ninh Thuận Province, Vietnam. It was supposed to consist of four 1,000 MWe reactors.

The feasibility study was to be carried out by Japan Atomic Power Company. Japan Atomic Power Company will also consult the project. The plant will be built by a consortium, International Nuclear Energy Development of Japan Co, which comprises 13 Japanese companies. The plant was to be owned and operated by state-owned electricity company EVN. Unit 1 was expected to be commissioned in 2021, unit 2 in 2022, unit 3 in 2024 and unit 4 in 2025. A marine geological survey for preparations of construction was carried out by the Japan-based Kawasaki Geological Survey Company at the ship M.T. Chōyō.

The project was cancelled in November 2016.

See also

References

  1. ^ "Vietnam going solar after nuclear power plants shelved". 5 February 2018. Retrieved 20 August 2018.
  2. ^ "Vietnam signs up Japan for Ninh Thuan 2". Nuclear Engineering International. 2010-11-03. Archived from the original on 2012-06-07. Retrieved 2011-12-03.
  3. Peixe, Joao (2011-10-01). "Japan Offers Consultant Services for Vietnamese Nuclear Power Plant". OilPrice.com. Retrieved 2011-12-03.
  4. "JAPC to assess Vietnamese project". World Nuclear News. 2011-09-28. Archived from the original on 2014-12-06. Retrieved 2011-12-03.
  5. Tsukimori, Osamu (2011-09-29). "Japan consortium, EVN to tie up on Vietnam nuclear plant". Reuters. Retrieved 2011-12-03.
  6. "Survey conducted for nuclear power plant". VNA. 2011-09-19. Retrieved 2011-12-03.

External links

Categories: