Misplaced Pages

North–South Axis

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from North-South Axis) Tram tunnel in Brussels, Belgium For similar uses, see North–South line. Not to be confused with the North–South connection used by trains.
Brussels Premetro
North-South Axis
Legend
42555
Brussels-North
(Gare du Nord/Noordstation)
4
Rogier 26
De Brouckère 15
Bourse/Beurs
Anneessens-Fontainas
5182
Lemonnier
81
Brussels-South
(Gare du Midi/Zuidstation)
Eurostar 26
8182
Porte de Hal/Hallepoort 26
Parvis de Saint-Gilles/
Sint-Gillis Voorplein
Horta 8197
Albert
5134

The North–South Axis is a tram tunnel in Brussels, Belgium, which crosses the city centre from north to south between Brussels-North railway station and Albert premetro station.

The first section of this tunnel was opened on 4 October 1976 between Brussels-North and Lemonnier premetro station. It was then expanded to Albert in 1993. It is currently used by tram routes 4, 10, 51 and 82. Only routes 4 and 10 use the full tunnel. Route 51 uses it between Lemonnier and Albert and route 82 between Lemonnier and Brussels-South railway station.

Circuit and stations

To the north, the North–South Axis starts in the municipality of Schaerbeek near the crossroad between the Rue du Progrès/Vooruitgangstraat and the Rue Rogier/Rogierstraat. The first station in the tunnel is Brussels-North, which offers a connection with the railway station of the same name. The tunnel then crosses the municipality of Saint-Josse-ten-Noode up to Rogier where it connects with the Brussels Metro. It then enters the City of Brussels, and stops at De Brouckère (with again a connection with the metro), Bourse - Grand-Place/Beurs - Grote Markt, Anneessens-Fontainas and Lemonnier. At Lemonnier, a tunnel entry allows trams to enter or leave the tunnel at this point. The tunnel then crosses Saint-Gilles, stopping at Brussels-South railway station (where it connects with the train and the metro), at Porte de Hal/Hallepoort (where it connects with the metro), at Parvis de Saint-Gilles/Sint-Gillis Voorplein, and at Horta. At Brussels-South, another entry allows trams to leave or enter the tunnel. The last stop is Albert, and is located at the border between the municipalities of Saint-Gilles and Forest. Two different tunnel entries are then located on the Avenue Albert/Albertlaan on the Greater Ring (Brussels' second ring road) and on the Avenue Jupiter/Jupiterlaan.

Metro line 3

The North–South Axis will become an actual metro line, Metro line 3. In phase 1, the existing tram tunnel will be transformed into a metro line. Lemonnier will not be served by the metro. Instead, there will be a new metro station, "Toots Thielemans", between Brussels-South station and Anneessens. The metro line should be operational by 2025.

In phase 2 of the project, metro line 3 will be extended from Brussels-North station to Bordet railway station. Seven new stations and a depot will be built for this purpose. Construction should be completed by 2030.

Map of future Metro line 3. The grey part has to be constructed. Station "Constitution/Grondwet" will be named "Toots Thielemans" in more recent plans.

See also

References

  1. "STIB - Historique de la STIB de 1970 à 1979". Archived from the original on 2013-10-21. Retrieved 2013-09-15.
  2. "STIB - Historique de la STIB de 1990 à 1999". Archived from the original on 2011-07-19. Retrieved 2010-04-16.
  3. ^ "Works on metro line 3 and the Toots Thielemans station". www.brussels.be. 2020-03-09. Retrieved 2021-10-21.
  4. "Construction of €175 million Brussels Metro Line 3 commenced". Urban Transport News. Retrieved 2021-10-21.
Categories: