Misplaced Pages

North Chosen Colonial Railway

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Japanese company in colonial Korea
North Chōsen Colonial Railway Co. Ltd.
Overview
Native name북선척식철도주식회사 (Bukseon Cheoksik Cheoldo Jusikhoesa)
北鮮拓殖鐵道株式會社 (Hokusen Takushoku Tetsudō Kabushiki Kaisha)
Route map

Legend
60.4 Musan Gangan (Mōzan-Kōgan)
Sentetsu Paengmu Line (1944)
57.9 Musan (Mōzan)
54.3 Musan Cheolsan (Mōzan-Tetsuzan)
50.5 Chinhwa (Chinka)
45.7 Jucho (Shusō)
39.4 West Pungsan (Seihōzan)
33.6 Hambuk Sincham (Kanboku-Shintan)
26.6 Geumpae (Kinpai)
18.9 Charyeong (Sharei)
14.5 Pyemusan (Haimozan)
8.9 Musu (Bushū)
Sentetsu Hamgyeong Line
4.2 Seosang (Seijō)
0.0 Gomusan (Komozan)
Sentetsu Hamgyeong Line

The North Chōsen Colonial Railway (Japanese: 北鮮拓殖鐵道株式會社, Hokusen Takushoku Tetsudō Kabushiki Kaisha; Korean: 북선척식철도주식회사, Bukseon Cheoksik Cheoldo Jusikhoesa), was a privately owned railway company in Japanese-occupied Korea.

History

In order to exploit the rich iron deposits of the Musan region, the Chōsen Railway established the North Chōsen Colonial Railway as a subsidiary company and began construction of a new line, calling it the Hambuk Line (not to be confused with the current Hambuk Line, which at that time was part of the Chosen Government Railway's (Sentetsu) Hamgyeong Line). The line was opened in two parts - the Gomusan-Hambuk Sincham section opening on 20 August 1927, and the Sinch'am-Musan segment being opened on 15 November 1929. On 1 February 1937, Musan Cheolsan Station was opened.

Originally built as a narrow-gauge line, the conversion to standard gauge was completed on 1 May 1940, and the extension to Musan Gangan station was completed then as well. On 1 April 1944, the line was absorbed into Sentetsu; at the same time, the line was given its current name, Musan Line, and the extension to Musan Gangan station was closed.

After the partition of Korea the line was within the territory of the DPRK, and was nationalised by the Provisional People’s Committee for North Korea along with all other railways in the Soviet zone of occupation on 10 August 1946; the line retained the name given it by Sentetsu, Musan Line.

Services

In the last timetable issued prior to the start of the Pacific War in November 1942, the North Chōsen Colonial Railway was operating four daily round trip passenger trains between Gomusan and Musan, timed to connect with local and express services on Sentetsu's Hamgyeong Line.

Gomusan - Musan
Distance
(read down)
2nd Class
Korean yen
3rd Class
Korean yen
1 3 5 7 Station name Distance
(read up)
2nd Class
Korean yen
3rd Class
Korean yen
2 4 6 8
0.0 - - 07:00 10:00 14:50 19:00 Gomusan 57.9 4.70 2.35 08:58 12:30 17:29 19:46
33.6 2.80 1.40 08:52 11:51 16:42 20:54 Hambuk Sincham 24.3 1.97 1.00 07:24 10:56 15:55 18:11
50.5 4.10 2.05 09:32 12:31 17:30 21:34 Chinhwa 7.4 0.60 0.30 06:30 10:01 14:58 17:16
57.9 4.70 2.35 09:49 12:47 17:48 21:50 Musan 0.0 - - 06:00 09:30 14:30 16:45

Motive Power

Locomotive number 3 of the North Chosen Colonial Railway

Prior to the conversion of the line to standard gauge, locomotives on the line included Class 810 locomotives of the Chōsen Railway. After it was converted to standard gauge, the primary power on the line was twenty-two heavy 2-8-2 steam locomotives identical to the South Manchuria Railway's Mikai class engines. Built by Kisha Seizō of Japan, they were numbered 1 through 22.

After the North Chosen Colonial Railway was nationalised, these locomotives were taken over by Sentetsu, but their subsequent numbering is unknown.

Road number Year Builder Works number
1 1940 Kisha Seizō 1891
2 1940 Kisha Seizō 1892
3 1940 Kisha Seizō 1893
4 1940 Kisha Seizō 1894
5 1940 Kisha Seizō 1895
6 1940 Kisha Seizō 1987
7 1940 Kisha Seizō 1988
8 1940 Kisha Seizō 1989
9 1940 Kisha Seizō 1990
10 1940 Kisha Seizō 1991
11 1940 Kisha Seizō 1992
12 1941 Kisha Seizō 2100
13 1941 Kisha Seizō 2101
14 1941 Kisha Seizō 2102
15 1941 Kisha Seizō 2103
16 1941 Kisha Seizō 2104
17 1942 Kisha Seizō 2203
18 1942 Kisha Seizō 2204
19 1942 Kisha Seizō 2205
20 1942 Kisha Seizō 2206
21 1942 Kisha Seizō 2207
22 1942 Kisha Seizō 2208

Route

Distance Station name
Total; km S2S; km Transcribed, Korean Transcribed, Japanese Hunminjeongeum Hanja/Kanji Opened Connections
0.0 0.0 Komusan Komozan 고무산 古茂山 20 August 1927 Sentetsu Hamgyeong Line
4.2 4.2 Seosang Seijō 서상 西上 20 August 1927
8.9 4.7 Musu Bushū 무수 舞袖 20 August 1927
14.5 5.6 Pyemusan Haimozan 폐무산 廃茂山 20 August 1927
18.9 4.4 Charyeong Sharei 차령 車嶺 20 August 1927
22.6 3.7 Geumpae Kinpai 금패 金佩 20 August 1927
33.6 11.0 Hambuk Sincham Kanboku-Shintan 함북신참 咸北新站 20 August 1927
39.4 5.8 Seopungsan Seihōzan 서풍산 西豊山 15 November 1929
45.7 6.3 Jucho Shusō 주초 朱草 15 November 1929
50.5 4.8 Chinhwa Chinka 진화 珍貨 15 November 1929
54.3 3.8 Musan Cheolsan Mōzan-Tetsuzan 무산철산 茂山鉄山 15 November 1929
57.9 3.6 Musan Mōzan 무산 茂山 15 November 1929 Sentetsu Baengmu Line
(opened 1944)
60.4 2.5 Musan Kang'an Mōzan-Kōgan 무산강안 茂山江岸 1 February 1937
Closed 1944

References

  1. ^ Yamada, Keitarō (1972). 汽車会社蒸気機関車製造史 [Manufacturing History of Kisha Kaisha Steam Locomotives] (in Japanese). Nagoya: Kōyūsha.
  2. Japanese Government Railways (1937), 鉄道停車場一覧. 昭和12年10月1日現在(The List of the Stations as of 1 October 1937), pp. 511
  3. 朝鮮總督府官報 (The Public Journal of the Governor-General of Korea), Shōwa Nr. 3984, 6 May 1940
  4. ^ 朝鮮總督府官報 (The Public Journal of the Governor-General of Korea), Shōwa Nr. 5143, 29 March 1944
  5. ^ Kokubu, Hayato, 将軍様の鉄道 (Shōgun-sama no Tetsudō), ISBN 978-4-10-303731-6
  6. Tōa Travel Co. (東亜旅行社), Ministry of Railways Combined Timetable 1 November 1942 (鐵道省編纂時刻表昭和17年11月1日)
Railway lines of the Chōsen Railway
Standard gauge
Narrow gauge
Subsidiaries
Categories: