RFA Tideforce on the Firth of Clyde on 28 February 2019. | |
History | |
---|---|
United Kingdom | |
Name | Tideforce |
Ordered | February 2012 |
Builder | DSME |
Laid down | 24 December 2015 |
Launched | 21 January 2017 |
In service | 30 July 2019 |
Homeport | Marchwood Military Port, Southampton |
Identification |
|
Motto | Raise on the 3/4 |
Status | In active Service |
General characteristics | |
Class and type | Tide-class fast fleet tanker |
Displacement | 37,000 t (36,000 long tons) |
Length | 200.9 m (659 ft 1 in) |
Beam | 28.6 m (93 ft 10 in) |
Draft | 10 m (32 ft 10 in) |
Propulsion | CODELOD |
Speed | 20 knots (37 km/h; 23 mph) |
Range | 18,200 nautical miles (33,700 km; 20,900 mi) |
Capacity |
|
Complement | 63 plus 46 non-crew embarked persons (Royal Marines, flight crew, trainees) |
Sensors and processing systems |
|
Armament |
|
Aircraft carried | 1 medium helicopter with full hangar facilities (Merlin / Wildcat), flight deck capable of landing Chinook-size helicopter |
RFA Tideforce is a Tide-class replenishment tanker of the British Royal Fleet Auxiliary (RFA). Launched in 2017, the ship entered service with the RFA in 2019.
Construction
Tideforce, along with her three sister ships, was built by DSME in South Korea. As the fourth and final Tide-class vessel, her steel was first cut on 2 December 2015 prior to being laid down on 24 December 2015. Around nine months later, the ship was fully assembled and floated out by 12 September 2016. A series of builder's sea trials subsequently commenced and, in June 2018, the ship left South Korea for delivery to the United Kingdom via San Diego and the Panama Canal. The ship arrived in Falmouth for fitting out on 22 August 2018. This involved the installation of communications equipment, defensive systems, a floating helipad and refueling rigs. Following fitting out, the ship carried out capability assessment trials, replenishment at sea (RAS) trials and first-of-class flying trials. Her first RAS was carried out with RFA Fort Victoria off the Isle of Portland and a RAS with her sister ship RFA Tidesurge occurred shortly thereafter. In July 2019, she achieved further milestones, carrying out her first RAS with the aircraft carrier HMS Queen Elizabeth, as well as her first RAS with a foreign vessel, HNLMS Friesland of the Royal Netherlands Navy.
Operational history
Tideforce entered service with the Royal Fleet Auxiliary on 30 July 2019, the last of her class to do so following sister ships Tidespring, Tiderace and Tidesurge. In September, the ship joined the UK Carrier Strike Group on its three-month Westlant 19 deployment to the United States.
In August 2020, Tideforce rendezvoused with Standing NATO Maritime Group 1 to provide replenishment. In March, whilst conducting aviation training off the Devon and Dorset coast, Tideforce responded to an emergency call from a Dutch-flagged ship and provided assistance to an injured sailor. During the same month, the ship joined eight UK naval ships in responding to seven Russian vessels near British waters. In June, the ship carried out the first night time replenishment at sea with a Queen Elizabeth-class aircraft carrier.
In October 2022, Tideforce, with Wildcat helicopter embarked, was deployed to the Turks and Caicos islands to provide surveillance support to the Royal Turks and Caicos Islands Police Force which was confronted with rising gang violence in the territory.
In July 2023, Tideforce conducted replenishment-at-sea exercises with MV Raleigh Fisher, a merchant navy vessel on contract to the MoD. The purpose of the exercise was to trial replenishment-at-sea capabilities with merchant navy ships. In September 2023, Tideforce was tasked to escort HMS Queen Elizabeth during her "Operation FIREDRAKE" deployment in northern European waters.
In October 2024, it was reported that she was docked, though available to deploy in an emergency, primarily due to the shortage of sailors in the RFA.
In November 2024, she supported HMS Iron Duke in monitoring two groups of Russian vessels passing through the English Channel. The Russian ships included the newly commissioned Admiral Gorshkov-class frigate Admiral Golovko and Russian seabed spy ship Yantar. Yantar has likely been primarily engaged in information gathering, charting the location and vulnerabilities of cables and other undersea energy infrastructure should they wish to interfere with them in the future.
See also
References
- "FOI(A) regarding the Royal Navy" (PDF). What do they know?. 27 April 2021. Retrieved 27 April 2021.
- "Tide Class MARS Tanker". BMT. Retrieved 23 February 2012.
- "DSME Announced as Winning Bid for Royal Navy's MARS Tanker Competition". Defencepro Daily. Retrieved 23 February 2012.
- "Kelvin Hughes to supply equipment for 4 MARS tankers vessels for Royal Fleet Auxiliary". navyrecognition.com. Retrieved 1 January 2016.
- "Last ditch defence – the Phalanx close-in weapon system in focus". Navy Lookout. 10 August 2020. Retrieved 29 March 2023.
- "The all-rounder – the 30mm Automated Small Calibre Gun in focus". Navy Lookout. 13 January 2021. Retrieved 29 March 2023.
- ^ "RFA Tideforce". Historical RFA. Retrieved 8 September 2020.
- ^ "FOURTH TIDE-CLASS TANKER ARRIVES FOR FIT-OUT". Maritime Journal. 22 August 2018. Retrieved 8 September 2020.
- "Royal Fleet Auxiliary: Tankers". TheyWorkForYou. 17 July 2019. Retrieved 28 September 2020.
- "RFA Tideforce Joins Royal Fleet Auxiliary Completing UK's New Tanker Fleet". Naval News. 31 July 2019. Retrieved 8 September 2020.
- "HMS Queen Elizabeth Joins World's Biggest Coffee Morning". Royal Navy. 27 September 2019. Retrieved 8 September 2020.
- "Tanker Tideforce Powers NATO Task Group". Royal Navy. 10 August 2020. Retrieved 8 September 2020.
- "Naval Tanker's Crew Help Injured Sailor Off Portland". Royal Navy. 30 March 2020. Retrieved 8 September 2020.
- "Nine British Royal Navy and RFA ships 'monitoring every movement' of Russian war ships in UK waters". The News. 26 March 2020. Retrieved 8 September 2020.
- "First night replenishment at sea for British Navy HMS Queen Elizabeth aircraft carrier". Navy Recognition. 3 June 2020. Retrieved 8 September 2020.
- "Royal Navy Deploys to Help Fight Gang Violence in Turks & Caicos". Maritime Executive. 11 October 2022. Retrieved 2 December 2022.
- "Tideforce replenish-at-sea trials with commercial tanker". Royal Navy. 3 July 2023. Retrieved 6 July 2023.
- "2023 Carrier Strike Group deployment begins". Navy Lookout. 11 September 2023.
- "RFA Fort Victoria to be placed in long-term lay up". Navy Lookout. 2024-10-08. Retrieved 2024-10-08.
- "Royal Navy monitors Russian seabed spy ship Yantar loitering in Irish Sea | Navy Lookout". www.navylookout.com. 2024-11-15. Retrieved 2024-11-16.
- "RAF Lossiemouth fighter jets track Russian bomber over North Sea". BBC News. 2024-11-15. Retrieved 2024-11-16.
Current Royal Fleet Auxiliary ships | |||||||
---|---|---|---|---|---|---|---|
Tankers |
| ||||||
Replenishment ships |
| ||||||
Landing ship docks |
| ||||||
Other vessels |
|