(Redirected from Sentul Depot) Malaysian commuter train station This article is about the commuter rail station of the KTM Komuter. For the metro/rapid transit station of the Rapid KL, see Sentul LRT station.

3°10′57.4″N 101°41′19.7″E / 3.182611°N 101.688806°E / 3.182611; 101.688806

Sentul
 KC01  KTM_Komuter_Logo | Commuter rail station
General information
Other namesMalays Jawi: سنتول
Chinese: 冼都
Tamil: செந்தூல்
LocationJalan Perhentian, Sentul, Kuala Lumpur
Malaysia
Coordinates3°11′0″N 101°41′20″E / 3.18333°N 101.68889°E / 3.18333; 101.68889
Owned byKeretapi Tanah Melayu
Line(s)1 Batu Caves-Pulau Sebang (KTM Komuter)
Platforms1 side platform & 1 island platform
Tracks3
Construction
ParkingAvailable. Free parking bays
Other information
Station code KC01 
History
Opened1905
Rebuilt2010
Electrified1995
Services
Preceding station Keretapi Tanah Melayu
(Komuter)
Following station
Batu Kentonmentowards Batu Caves Batu Caves–Pulau Sebang Line Putratowards Pulau Sebang/Tampin

The Sentul Komuter station is a Malaysian commuter train station formerly known as Sentul railway station and is located in the east side of and named after Sentul, Kuala Lumpur. Since 2015, the station has been on the Seremban Line of the KTM Komuter train services. For a long time, this station served as the northern terminus of the Sentul-Port Klang route until the line was extended to Batu Caves, when the station continued to be on the Batu Caves-Port Klang Line until the route change in December 2015 to accommodate the Klang Valley Double Tracking upgrade.

The station is located at the end of Jalan Perhentian, off Jalan Ipoh.

The station is situated a distance away from two elevated Ampang and Sri Petaling Lines stations which share similar names as the town of Sentul and the Komuter station, and serve the same locality. The Sentul Komuter station is located 730 m northwest from the Sentul Timur LRT station, and 900 m southwest from the Sentul LRT station, which is located in the southern area of Sentul.

Design

A platform view of the old station depicts one platform connected by two footbridges.

The Sentul station as a building has existed since Sentul was used as a central workshop and depot for Federated Malay States Railway trains, but was not demolished and replaced during the 1989-1995 Klang Valley electrification and double-tracking project. Rather, the building was retained and retrofitted to support access to KTM Komuter services, with the addition of faregates and the upgrading of the ticket office. The station is also one of a few remaining stations designated in the Komuter system to be constructed of wood. Although located along more than three railway tracks and located beside a major depot, the station is fashioned as a modestly sized station, with room for only a waiting area and two-room office space. The station was, nevertheless, in charge of managing railway switches and supports a small railway staff.

Sentul station before renovation

The station retains a gap between the building and the line, suggesting a side platform that was removed during the electrification project, in place of a single island platform, between two railway tracks, laid 70 m southwest from the station. The main building is linked to the platform via a long sheltered walkway and an overhead pedestrian bridge. The pedestrian bridge is also connected to a train depot, but is locked from the public.

Depots

The Sentul station is linked to two major train depots. One is an older and larger variation, known as the Sentul Works, serving KTM in general, east from the Komuter station. The Sentul Works has been operational since 1905, before Peninsular Malaysia's independence, consisting of numerous brick buildings and metal sheds primarily used as a workshop and storage area for steam and diesel locomotives and railway cars. Occupying an estimated 5.2 hectares (13 acres) of land, the Sentul Works is the largest train depot in Malaysia, but has been deemed dilapidated after decades of use, and the majority of connecting railway lines to the north and west dismantled and replaced by parkland for Sentul Park. A central workshop to be constructed in Batu Gajah is slated to replace the Sentul Works by August 2009, where the land it is situated on is earmarked for property development by YTL Land & Development, as part of the Sentul East and Sentul West master plan. The depot's westernmost brick train shed was remodelled for use as the Kuala Lumpur Performing Arts Centre, and opened in 2005.

A second, more recent train depot, further north from the Sentul station, is primarily designated for KTM Komuter EMUs, where the storage and maintenance of a majority of the Komuter service's rolling stock take place. The depot consists of two metal framed structures covered with metal sheets located along what was a portion of the main railway lines, connected to (as of 2007) the sparsely used Sentul-Batu Caves single track line. A single railway line running around the EMU depot acts as a direct link between the Sentul station to the Sentul-Batu Caves line.

Replacement

In comparison to most older but smaller train stations along the Komuter Lines, the replacement of the Sentul station is planned to take place much later after Komuter services began operation in 1995. During the early 2000s, YTL Land & Development had vested interest in developing the area surrounding the Sentul station, its master plan to include a newer and more integrated station in place of its older counterpart. The project has faced several years of delays, and the old station was allowed to continue operation.

It was later announced that the station would form part of a long-postpone double-tracking, modernisation and electrification of the Sentul-Batu Caves line, as well as the resumption of YTL's development project. Site possession was given to contractor YTL on 17 November 2006 and the project was scheduled to be completed in May 2009. The rebuilt Sentul station opened in 2010 as the first completion of the project.

References

  1. "Rail Infrastructure Development At Batu Gajah". Official Malayan Railway website. Archived from the original on 27 September 2007. Retrieved 8 June 2007.

External links

Greater KL/Klang Valley Area rail transit stations
1 Batu Caves-Pulau Sebang Line
2 Tanjung Malim-Port Klang Line
3 Ampang Line
4 Sri Petaling Line
5 Kelana Jaya Line
6 KLIA Ekspres
7 KLIA Transit
8 KL Monorail
9 Kajang Line
10 KL Sentral-Terminal Skypark Line
11 Shah Alam Line
Phase 1
Opening 2025
Phase 2
12 Putrajaya Line
13 Circle Line
Opening 2028-2030
B1 BRT Sunway Line
Stations and services in italics are planned or under construction
Malaysia Keretapi Tanah Melayu West Coast railway line stations
Main Line
Batu Caves Branch Line
Port Klang Branch Line
Butterworth Branch Line
Stations in italics are planned or under construction
Categories: