Misplaced Pages

Ovaripada metro station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Shrinath Nagar (Ovaripada) metro station) Mumbai Metro's Red Line 7 terminal metro station


Ovaripada
Mumbai Metro station
General information
LocationOvaripada, Borivali, Mumbai, Maharashtra 400068
Coordinates19°14′36″N 72°51′51″E / 19.24346°N 72.86420°E / 19.24346; 72.86420
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 7
Platforms2 (2 side platform)
Tracks2
Connections
Construction
Structure typeElevated, Double track
Platform levels2
ParkingNo
AccessibleYes Disabled access
History
Opened2 April 2022; 2 years ago (2 April 2022)
Services
Preceding station Logo of the Delhi Metro Mumbai Metro Following station
Terminus Line 7 Rashtriya Udyantowards Gundavali
Route map
Legend
Line 7
to Line 9
Dahisar Depot
to Line 2
0.0000 Dahisar East
1.1404 Ovaripada
2.1484 Rashtriya Udyan
3.2749 Devipada
4.0972 Magathane
5.8249 Poisar
6.4492 Akurli
7.4569 Kurar
8.3449 Dindoshi
9.4249 Aarey
11.7434 Goregaon East
13.1110 Jogeshwari East on Line 6
14.2951 Mogra
15.5249 Gundavali
Western Express Highway on Line 1
16.0849 Airport Colony
to Line 3
18.9342 CSMIA International Airport interchange
to Line 8
Location

Ovaripada is the elevated northern terminal metro station on the North-South corridor of the Red Line 7 of Mumbai Metro. This station is located in an elevated position on Western Express Highway in North Mumbai. This metro station was inaugurated on 2 April 2022 by Prime Minister Narendra Modi.

Station layout

G Street Level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Northbound
Towards → Andheri West next station is Dahisar East Metro Station
Platform 1
Southbound
Towards ← Gundavali next station is Rashtriya Udyaan
Side platform | Doors will open on the left Disabled access
L2

Power and signaling system

Like all other stations and railways of Mumbai metro, Ovari Pada station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

Entry/Exits

Being on the side of WEH it has only 1 extry/exit. People wanting to go to nearby places like

Can get down at this Metro Station. There is no public parking around this station, but auto-rickshaws & BEST Buses are available for commute.

See also

References

  1. "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 8 August 2023.
  2. "PM Modi inaugurates two new Mumbai Metro Lines, projects in Maharashtra". WION. Retrieved 8 August 2023.
  3. "PM Modi inaugurates two new Mumbai Metro lines, launches other development projects". The Hindu. 19 January 2023. ISSN 0971-751X. Retrieved 8 August 2023.

External links

  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
Mumbai Metro stations
Line 7
Depot(s)
  • Charkop & Bhayandar (Planned)
  • * Stations in Italics are Under Construction.
Category: