Dahisar East is the elevated northern terminal station on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This metro station is located on the Western Express Highway in Northern Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was opened to the public on 2 April 2022.
History
J Kumar Infraprojects was awarded the contract to construct the station in June 2016. The MMRDA announced that electrification of the line had been completed on 26 May 2020.
Dahisar East was opened to the public on 2 April 2022, along with the first phase of Line 2A.
Station layout
L1 Platforms |
Side platform, doors will open on the left | |
Platform 2 | → Line 2 toward Andheri West (Anand Nagar) → | |
Platform 1 | ← Line 2 termination platform | |
Side platform, doors will open on the left | ||
M | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
G | Street level | Exit/Entrance |
Power and signaling system
Like all other stations and railways of Mumbai metro, Dahisar East station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References
- "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
- "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
- "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
Mumbai Metro stations | |||||
---|---|---|---|---|---|
Line 2 |
| ||||
Line 7 | |||||
Depot(s) | |||||
|