Misplaced Pages

Tallawarra Power Station

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
(Redirected from Tallawarra)

Tallawarra Power Station
CountryAustralia
LocationYallah, New South Wales, Australia
Coordinates34°31′22″S 150°48′29″E / 34.52278°S 150.80806°E / -34.52278; 150.80806
StatusOperational
Commission date2009
OwnerEnergyAustralia
Operator
Thermal power station
Primary fuelNatural gas
Combined cycle?Yes
Power generation
Units operational
  • 1 × 260 megawatts (350,000 hp) GT26 gas turbine
  • 1 × 160 megawatts (210,000 hp) steam turbine
Make and modelAlstom
Nameplate capacity435 megawatts (583,000 hp)
External links
CommonsRelated media on Commons
[edit on Wikidata]

Tallawarra Power Station is a 435-megawatt (583,000 hp) combined cycle natural gas power station in Yallah, New South Wales, Australia. Owned and operated by EnergyAustralia, the station is the first of its type in New South Wales and produces electricity for the state during periods of high demand. It is located on the western shore of Lake Illawarra.

The station comprises a 260-megawatt (350,000 hp) gas turbine and a 160-megawatt (210,000 hp) steam turbine unit and has a total capacity of 435 megawatts (583,000 hp). It uses many of the previous power station's structures including the cooling system channels from Lake Illawarra. The power station is connected to the state grid via a 132 kV switching station maintained by Endeavour Energy.

History

Tallawarra originally operated as a coal-fired power station beginning in 1954 and reaching full operation by 1961. At its peak, it had a capacity output of 320 megawatts (430,000 hp). 'A' station had four 30-megawatt (40,000 hp) Thomson-Houston 2 stage (HP+LP) turbo generators. Steam was supplied by four Simon Carves pulverised fuel boilers at 140,000 kg/h (300,000 lb/h) at a pressure of 4.31 MPa (625 psi) and a temperature of 463 °C (865 °F). In 1960 "B" station was built having two 100-megawatt (130,000 hp) English Electric 3-stage turbo generators (No. 5+6). The generators were hydrogen-cooled but didn't have any stator water cooling. Steam was supplied by 2 ICAL pulverised coal burning boilers at a rate of 360,000 kg/h (800,000 lb/h) at a pressure of 11.6 MPa (1,680 psi) and a temperature of 538 °C (1,000 °F). The station closed in 1989, and stood abandoned by the foreshore of Lake Illawarra. It was demolished over a ten-year period.

In early 2003 the site was sold by Pacific Power to TRUenergy and construction of the gas-fired combined cycle plant began in November 2006. The plant consists of a gas turbine of 288 megawatts (386,000 hp) and a 3-stage steam turbine of 160 megawatts (210,000 hp) with a single 450-megawatt (600,000 hp) generator. A unique feature is the waste heat boiler with a super heater and two reheater sections for the IP and LP stages of the turbine. Overall thermal efficiency is 60%. It was opened by Premier Nathan Rees on 18 March 2009.

In 2021 construction began on Stage B, a 300+ MW expansion of the existing Stage A power station and the construction of a 420MW Open Cycle Gas Turbine Power Plant. It was commissioned in June 2024.

References

  1. ^ "Tallawarra Power Station". EnergyAustralia. Retrieved 24 June 2015.
  2. "Tallawarra power station". TRUenergy. Archived from the original on 31 August 2007. Retrieved 8 March 2009.
  3. ^ "Tallawarra Power Station FAQs". TRUenergy. Retrieved 8 March 2009.
  4. "Yallah History". Wollongong City Library. Archived from the original on 18 June 2009. Retrieved 8 March 2009.
  5. "Transforming Tallawarra: GT26 based plant for booming New South Wales". Modern Power Systems. Archived from the original on 14 July 2011. Retrieved 28 September 2007.
  6. "Tallawarra recent history". TRUenergy. Archived from the original on 27 March 2009. Retrieved 8 March 2009.
  7. "Tallawarra taking off in NSW". EcoGeneration. Archived from the original on 25 September 2009. Retrieved 25 April 2010.
  8. Tallwarra Stage B Clough
  9. Tallawarra Stage B Project enters National Electricity Market Webuild 9 July 2024
Energy in New South Wales
Generation
Biomass combustion
  • Broadwater Sugar Mill
  • Broadwater Biomass Co-Gen
  • Condong Sugar Mill
  • Condong Biomass Co-Gen
  • Harwood Sugar Mill
  • Redbank
  • Visy Paper, Tumut
Cogeneration
  • Amcor, Bomaderry
  • BlueScope Steel, Port Kembla
  • Macquarie University
  • Stadium Australia
  • University of Western Sydney
  • Visy Paper, Smithfield
Hydro-electric
Solar generation
Wind farms
Coal fired
Natural gas
Generation companies
Distribution
Distribution network operators
Transmission network operators
Retail companies and brands
Historical
List of power stations in New South Wales
Significant places and items of interest in the Illawarra region of New South Wales, Australia
Commerce and industry
Industry
Shopping
Education
Secondary
Tertiary
Entertainment, culture and sport
Entertainment and culture
Sport
Rugby league
Soccer
Other sports
Geography
General
National parks and
other conservation areas
Rivers
Mountain ranges and peaks
Historical
Defence
General
Industry
Maritime
People
Rail
General
Railway lines
Railway stations
Infrastructure
Transport
Road
Railway lines
Railway stations
Air
Bus
Maritime
Utilities
Electricity generation
Media
Other
Religion
Hospitals and
Medical research institute
Other
Government administration
Federal
State
Local
Categories: