Misplaced Pages

Stratford station: Difference between revisions

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Browse history interactively← Previous editContent deleted Content addedVisualWikitext
Revision as of 01:15, 30 November 2024 editButtons0603 (talk | contribs)Autopatrolled, Extended confirmed users8,208 edits added Category:Mildmay line stations using HotCat← Previous edit Latest revision as of 14:54, 22 December 2024 edit undoMurgatroyd49 (talk | contribs)Extended confirmed users35,960 edits rm unrocognised param 
(7 intermediate revisions by 5 users not shown)
Line 10: Line 10:
| symbol4 = overground | symbol4 = overground
| symbol5 = crossrail | symbol5 = crossrail
| symbol6 = bus
| alt_name1 = Stratford (London)<ref name=atoc/> | alt_name1 = Stratford (London)<ref name=atoc/>
| alt_name = Stratford Regional<ref name=looc> | alt_name = Stratford Regional<ref name=looc>
Line 109: Line 108:
It is the fifth ],<ref name=":9" /> the busiest station in London outside the ],<ref>{{Cite web |title=Stratford station improvements |url=https://www.networkrail.co.uk/running-the-railway/our-routes/anglia/improving-the-railway-in-anglia/stratford-station-improvements/ |access-date=2023-10-20 |website=Network Rail |language=en-GB}}</ref> and is the busiest station on the London Underground network outside ].<ref name=":9">{{Cite web |title=Estimates of station usage &#124; ORR Data Portal |url=https://dataportal.orr.gov.uk/statistics/usage/estimates-of-station-usage}}</ref> It is the fifth ],<ref name=":9" /> the busiest station in London outside the ],<ref>{{Cite web |title=Stratford station improvements |url=https://www.networkrail.co.uk/running-the-railway/our-routes/anglia/improving-the-railway-in-anglia/stratford-station-improvements/ |access-date=2023-10-20 |website=Network Rail |language=en-GB}}</ref> and is the busiest station on the London Underground network outside ].<ref name=":9">{{Cite web |title=Estimates of station usage &#124; ORR Data Portal |url=https://dataportal.orr.gov.uk/statistics/usage/estimates-of-station-usage}}</ref>


On the London Underground, it is on the ] between {{lus|Mile End}} and {{lus|Leyton}} stations. It is also the eastern terminus of the ]. On the DLR, it is a terminus for some trains and for others it is a through-station between {{stl|DLR|Stratford High Street}} and {{stn|Stratford International}}. On the Overground, it is the terminus of the ]; on the main line it is served by ] stopping services between ] and {{rws|Shenfield}} and by medium- and longer-distance services operated by ] to and from numerous destinations in the ]. There are also limited off-peak services operated by ] connecting to the ] to {{rws|Shoeburyness}}. On the London Underground, the station is on the ] between {{lus|Mile End}} and {{lus|Leyton}} stations. It is also the eastern terminus of the ] and the next station towards west is ]. On the DLR, it is a terminus for some trains and for others it is a through-station between {{stl|DLR|Stratford High Street}} and {{stn|Stratford International}}. On the Overground, it is the terminus of the ]; on the main line it is served by ] stopping services between ] and {{rws|Shenfield}} and by medium- and longer-distance services operated by ] to and from numerous destinations in the ]. There are also limited off-peak services operated by ] connecting to the ] to {{rws|Shoeburyness}}.


The station was opened in 1839 by the ]. Today it is owned by ] and is in ]/].<ref> {{Webarchive|url=https://web.archive.org/web/20151018010332/https://www.london.gov.uk/media/mayor-press-releases/2014/07/mayor-announces-major-new-plans-for-queen-elizabeth-olympic-park |date=18 October 2015 }} Stratford to be 're-zoned' to bring its three stations into transport zones 2/3. 21 July 2014. Retrieved 10 November 2015</ref> To distinguish it from {{rws|Stratford-upon-Avon}} in Warwickshire it is sometimes referred to as '''Stratford (London)''',<ref name=atoc>{{cite web |url=http://www.nationalrail.co.uk/stations/SRA/details.html |publisher=National Rail Enquiries |title=Station Facilities: Stratford |date=26 November 2009 |access-date=11 December 2009 |archive-url=https://web.archive.org/web/20100105203513/http://www.nationalrail.co.uk/stations/SRA/details.html |archive-date=5 January 2010 |url-status=live |df=dmy-all}}</ref> or as '''Stratford Regional''' to differentiate it from Stratford International, which is some {{convert|370|m|yd|order=flip}} to the north.<ref name=looc/> Stratford served as a key travel hub for the ] and ] held in London.<ref> {{Webarchive|url=https://web.archive.org/web/20100916104133/http://www.london2012.com/making-it-happen/transport/stratford-regional-station.php |date=16 September 2010 }}. Retrieved 9 September 2010.</ref> The station was opened in 1839 by the ]. Today it is owned by ] and is in ]/].<ref> {{Webarchive|url=https://web.archive.org/web/20151018010332/https://www.london.gov.uk/media/mayor-press-releases/2014/07/mayor-announces-major-new-plans-for-queen-elizabeth-olympic-park |date=18 October 2015 }} Stratford to be 're-zoned' to bring its three stations into transport zones 2/3. 21 July 2014. Retrieved 10 November 2015</ref> To distinguish it from {{rws|Stratford-upon-Avon}} in Warwickshire it is sometimes referred to as '''Stratford (London)''',<ref name=atoc>{{cite web |url=http://www.nationalrail.co.uk/stations/SRA/details.html |publisher=National Rail Enquiries |title=Station Facilities: Stratford |date=26 November 2009 |access-date=11 December 2009 |archive-url=https://web.archive.org/web/20100105203513/http://www.nationalrail.co.uk/stations/SRA/details.html |archive-date=5 January 2010 |url-status=live |df=dmy-all}}</ref> or as '''Stratford Regional''' to differentiate it from Stratford International, which is some {{convert|370|m|yd|order=flip}} to the north.<ref name=looc/> Stratford served as a key travel hub for the ] and ] held in London.<ref> {{Webarchive|url=https://web.archive.org/web/20100916104133/http://www.london2012.com/making-it-happen/transport/stratford-regional-station.php |date=16 September 2010 }}. Retrieved 9 September 2010.</ref>
Line 214: Line 213:
* Additional ] westbound platform for the Central line. This opened in September 2010. * Additional ] westbound platform for the Central line. This opened in September 2010.
* New northern ticket hall built as part of the ] development, adjacent to ] * New northern ticket hall built as part of the ] development, adjacent to ]
* An ] to ] using the old ] route from Canning Town, using the platforms vacated by the North London Line. This opened in August 2011.<ref>{{cite news |date=31 August 2011 |title=New £211m DLR extension connecting Olympic venues opens |language=en-GB |work=BBC News |url=https://www.bbc.co.uk/news/uk-england-london-14727813 |url-status=live |archive-url=https://web.archive.org/web/20110901173549/http://www.bbc.co.uk/news/uk-england-london-14727813 |archive-date=1 September 2011}}</ref> * An ] to ] using the old ] route from Canning Town, using the platforms vacated by the North London line. This opened in August 2011.<ref>{{cite news |date=31 August 2011 |title=New £211m DLR extension connecting Olympic venues opens |language=en-GB |work=BBC News |url=https://www.bbc.co.uk/news/uk-england-london-14727813 |url-status=live |archive-url=https://web.archive.org/web/20110901173549/http://www.bbc.co.uk/news/uk-england-london-14727813 |archive-date=1 September 2011}}</ref>


Since the turn of the millennium, "passenger movements"{{Efn|Refers to the number of people who use the station, including those who only change train or Tube lines.|name=}} have risen from around 40 million a year in 2006 to 128 million in 2019, making it ].<ref name=":1">{{Cite news |date=1 August 2023 |title=Stratford: Business case submitted to improve 'confusing' railway station |language=en-GB |work=BBC News |url=https://www.bbc.com/news/uk-england-london-66365032 |access-date=14 October 2023}}</ref> Since the turn of the millennium, "passenger movements"{{Efn|Refers to the number of people who use the station, including those who only change train or Tube lines.|name=}} have risen from around 40 million a year in 2006 to 128 million in 2019, making it ].<ref name=":1">{{Cite news |date=1 August 2023 |title=Stratford: Business case submitted to improve 'confusing' railway station |language=en-GB |work=BBC News |url=https://www.bbc.com/news/uk-england-london-66365032 |access-date=14 October 2023}}</ref>
Line 231: Line 230:
{{Stratford stations}} {{Stratford stations}}
The high-level platforms run at right angles to the low-level, roughly east–west. The ] serving platforms 16 and 17 passes beneath the high-level station. Except for platforms 4A and 4B, access from the main station entrance is via ]s, one of which links the ] platforms directly to platforms 3 and 5 to 10. Another subway, which had served the old entrance to the station, was re-opened in September 2010.<ref name="ODA June 2011">{{cite web |url=http://www.london2012.com/documents/oda-transport/transport-big-build.pdf |title=Transport Big Build – Complete |date=June 2011 |publisher=] |page=7 |access-date=14 December 2011 |archive-url=https://web.archive.org/web/20111201021111/http://www.london2012.com/documents/oda-transport/transport-big-build.pdf |archive-date=1 December 2011 |url-status=dead |df=dmy-all }}</ref> The high-level platforms run at right angles to the low-level, roughly east–west. The ] serving platforms 16 and 17 passes beneath the high-level station. Except for platforms 4A and 4B, access from the main station entrance is via ]s, one of which links the ] platforms directly to platforms 3 and 5 to 10. Another subway, which had served the old entrance to the station, was re-opened in September 2010.<ref name="ODA June 2011">{{cite web |url=http://www.london2012.com/documents/oda-transport/transport-big-build.pdf |title=Transport Big Build – Complete |date=June 2011 |publisher=] |page=7 |access-date=14 December 2011 |archive-url=https://web.archive.org/web/20111201021111/http://www.london2012.com/documents/oda-transport/transport-big-build.pdf |archive-date=1 December 2011 |url-status=dead |df=dmy-all }}</ref>
* Platforms 1 and 2 are used by the London Overground's ]. They comprise an ] with a step-free link to platform 12 and the subways linking to platforms 3 to 11.<ref name="loleaflet"> {{webarchive|url=https://web.archive.org/web/20120118215633/http://www.tfl.gov.uk/assets/livetravelnews/realtime/rail/London-Overground-Stratford-leaflet.pdf |date=18 January 2012 }} (Information leaflet, TfL January 2009)</ref> The platforms can accommodate trains with up to six carriages, though at present, due to short platforms elsewhere, shorter trains are used. * Platforms 1 and 2 are used by the London Overground's ]. They comprise an ] with a step-free link to platform 12 and the subways linking to platforms 3 to 11.<ref name="loleaflet"> {{webarchive|url=https://web.archive.org/web/20120118215633/http://www.tfl.gov.uk/assets/livetravelnews/realtime/rail/London-Overground-Stratford-leaflet.pdf |date=18 January 2012 }} (Information leaflet, TfL January 2009)</ref> The platforms can accommodate trains with up to six carriages, though at present, due to short platforms elsewhere, shorter trains are used.
* Platforms 3, 3A and 6 are used by the ] ], which rise from their tunnels onto the overground here and then immediately descend back underground upon departure from Stratford. Platforms 3 and 6 are island platforms providing ] with the Elizabeth line and weekend c2c services operating from platforms 5 and 8 respectively, while platform 3A has a direct step-free connection at mezzanine level, facilitating easier interchange with Jubilee line trains on platforms 13 to 15 and DLR trains on platforms 4A and 4B. Westbound Central line trains travelling towards central London open doors on both sides so that passengers can alight and board trains from either platform, reducing dwell times and peak-hour congestion in the passageways. * Platforms 3, 3A and 6 are used by the ] ], which rise from their tunnels onto the overground here and then immediately descend back underground upon departure from Stratford. Platforms 3 and 6 are island platforms providing ] with the Elizabeth line and weekend c2c services operating from platforms 5 and 8 respectively, while platform 3A has a direct step-free connection at mezzanine level, facilitating easier interchange with Jubilee line trains on platforms 13 to 15 and DLR trains on platforms 4A and 4B. Westbound Central line trains travelling towards central London open doors on both sides so that passengers can alight and board trains from either platform, reducing dwell times and peak-hour congestion in the passageways.
* Platforms 4 and 7 are disused. When the main line to {{rws|Shenfield}} was electrified in the 1940s there was an intention to run a shuttle service from {{rws|Fenchurch Street}} to Stratford, calling at ] (now Limehouse) and {{rws|Bow Road}}, which would have terminated at these ]s. However, this service was never introduced (despite all the works required being carried out). From the 1980s platform 4 was used as the terminus of the DLR while platform 7 remained abandoned. In 2007, platform 4 was abandoned again as the DLR moved to two new platforms to the south of platform 4, though these are signposted as "platform 4" within the station. * Platforms 4 and 7 are disused. When the main line to {{rws|Shenfield}} was electrified in the 1940s there was an intention to run a shuttle service from {{rws|Fenchurch Street}} to Stratford, calling at ] (now Limehouse) and {{rws|Bow Road}}, which would have terminated at these ]s. However, this service was never introduced (despite all the works required being carried out). From the 1980s platform 4 was used as the terminus of the DLR while platform 7 remained abandoned. In 2007, platform 4 was abandoned again as the DLR moved to two new platforms to the south of platform 4, though these are signposted as "platform 4" within the station.
Line 237: Line 236:
* Platforms 5 and 8 are used by ] stopping services on the electric line between ] and Shenfield. They may also be used by some ]-operated main line trains to and from {{rws|Southend Victoria}}. Weekend ] trains call on the way to or from Liverpool Street connecting to or from the ] via {{stnlink|Barking}}. Cross-platform interchange is available with the Central line running from platforms 3 and 6 respectively. * Platforms 5 and 8 are used by ] stopping services on the electric line between ] and Shenfield. They may also be used by some ]-operated main line trains to and from {{rws|Southend Victoria}}. Weekend ] trains call on the way to or from Liverpool Street connecting to or from the ] via {{stnlink|Barking}}. Cross-platform interchange is available with the Central line running from platforms 3 and 6 respectively.
* Platforms 9, 10 and 10A are used by Greater Anglia services on the main line out of Liverpool Street towards {{rws|Norwich}} and intermediate stations and branch lines. Originally there were only two platforms here, but in the 1990s the station buildings on platform 9 were demolished to make an island platform with faces on both sides. The new face became number 9, the former 9 became 10, and the previous platform 10 became 10A. * Platforms 9, 10 and 10A are used by Greater Anglia services on the main line out of Liverpool Street towards {{rws|Norwich}} and intermediate stations and branch lines. Originally there were only two platforms here, but in the 1990s the station buildings on platform 9 were demolished to make an island platform with faces on both sides. The new face became number 9, the former 9 became 10, and the previous platform 10 became 10A.
* Platforms 11 and 12 are used for the Greater Anglia services to {{rws|Bishop's Stortford}} that start from Stratford. There is currently a half-hourly service Mondays to Saturdays, with additional services to and from {{rws|Hertford East}}, {{rws|Harlow Town}}, {{rws|Broxbourne}} or {{rws|Cambridge}} in the peak hours with a half-hourly service to Hertford East on Sundays.<ref>{{cite web|url=http://www.nationalexpresseastanglia.com/content/download/40278/424001/file/Table+18+TT+Book+web.pdf|title=National Express West Anglia Timetable 18 – Cambridge/Bishop's Stortford to Stratford|publisher=]|date=December 2011|access-date=20 January 2012}}{{Dead link|date=April 2023 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> In 2021 these platforms were additionally used for London Overground's ]. * Platforms 11 and 12 are used for the Greater Anglia services to {{rws|Bishop's Stortford}} that start from Stratford. There is currently a half-hourly service Mondays to Saturdays, with additional services to and from {{rws|Hertford East}}, {{rws|Harlow Town}}, {{rws|Broxbourne}} or {{rws|Cambridge}} in the peak hours with a half-hourly service to Hertford East on Sundays.<ref>{{cite web|url=http://www.nationalexpresseastanglia.com/content/download/40278/424001/file/Table+18+TT+Book+web.pdf|title=National Express West Anglia Timetable 18 – Cambridge/Bishop's Stortford to Stratford|publisher=]|date=December 2011|access-date=20 January 2012}}{{Dead link|date=April 2023 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> In 2021 these platforms were additionally used for London Overground's ].


===Low-level platforms=== ===Low-level platforms===
These platforms are at ground level and run north–south. Platforms 13 to 16 are served by a footbridge (with lifts and escalators) from the main station entrance, while platform 17 adjoins directly onto the main station concourse. These platforms are at ground level and run north–south. Platforms 13 to 16 are served by a footbridge (with lifts and escalators) from the main station entrance, while platform 17 adjoins directly onto the main station concourse.
* Platforms 13 to 15 were built in the late 1990s to serve the Jubilee line when it was extended to Stratford in 1999. All three are bay platforms.<ref>{{cite web|url=http://www.cabe.org.uk/default.aspx?contentitemid=288&field=btstr&term=Transport&type=1 |title=Stratford Station |publisher=Commission for Architecture and the Built Environment (CABE) |access-date=1 March 2008 |url-status=dead |archive-url=http://webarchive.nationalarchives.gov.uk/20110118095356/http:/www.cabe.org.uk/default.aspx?contentitemid=288&field=btstr&term=Transport&type=1 |archive-date=18 January 2011 }}</ref> A footbridge joins the platforms at the southern end, away from the main station building. Since 2018, almost all trains use platforms 14 and 15 (an island platform), with platform 13 only seeing a few trains at either end of the day (including ] services). * Platforms 13 to 15 were built in the late 1990s to serve the Jubilee line when it was extended to Stratford in 1999. All three are bay platforms.<ref>{{cite web|url=http://www.cabe.org.uk/default.aspx?contentitemid=288&field=btstr&term=Transport&type=1 |title=Stratford Station |publisher=Commission for Architecture and the Built Environment (CABE) |access-date=1 March 2008 |url-status=dead |archive-url=http://webarchive.nationalarchives.gov.uk/20110118095356/http:/www.cabe.org.uk/default.aspx?contentitemid=288&field=btstr&term=Transport&type=1 |archive-date=18 January 2011 }}</ref> A footbridge joins the platforms at the southern end, away from the main station building. Since 2018, almost all trains use platforms 14 and 15 (an island platform), with platform 13 only seeing a few trains at either end of the day (including ] services).
* Platforms 16 and 17 (known as platforms 1 and 2 until 2009) originally served trains from ] in north London to {{stnlnk|North Woolwich}}, but this service has since been discontinued. In the 1980s, ] trains from {{stnlink|Richmond|London}} to ] were diverted to run via these platforms to North Woolwich. Following the closure of the line to North Woolwich in 2006, these effectively became terminus platforms, with trains departing westbound only towards Richmond. Following the North London Line trains moving to new platforms 1 and 2 on the high level, they were converted in 2011 for use by DLR services: platform 16 is for northbound trains to {{stnlink|Stratford International}} and platform 17 is for southbound trains via {{stnlink|Canning Town}} to {{stnlink|Woolwich Arsenal}}.<ref name="loleaflet"/><ref>{{cite web |url=http://www.london2012.com/documents/oda-transport/stratford-regional-station-christmas-2007-improvements-map.pdf |title=Stratford Station |access-date=16 August 2009 |archive-url=https://web.archive.org/web/20091007111804/http://www.london2012.com/documents/oda-transport/stratford-regional-station-christmas-2007-improvements-map.pdf |archive-date=7 October 2009 |url-status=dead |df=dmy-all}}</ref> The new platforms have also been built with a reversing siding immediately to the south, accessible from both running lines. This enables trains from Stratford International to terminate at Stratford and trains from Canning Town to also terminate here. There is also a crossover immediately to the north, allowing trains from the southbound platform to reverse onto the northbound line back to Stratford International. * Platforms 16 and 17 (known as platforms 1 and 2 until 2009) originally served trains from ] in north London to {{stnlnk|North Woolwich}}, but this service has since been discontinued. In the 1980s, ] trains from {{stnlink|Richmond|London}} to ] were diverted to run via these platforms to North Woolwich. Following the closure of the line to North Woolwich in 2006, these effectively became terminus platforms, with trains departing westbound only towards Richmond. Following the North London line trains moving to new platforms 1 and 2 on the high level, they were converted in 2011 for use by DLR services: platform 16 is for northbound trains to {{stnlink|Stratford International}} and platform 17 is for southbound trains via {{stnlink|Canning Town}} to {{stnlink|Woolwich Arsenal}}.<ref name="loleaflet"/><ref>{{cite web |url=http://www.london2012.com/documents/oda-transport/stratford-regional-station-christmas-2007-improvements-map.pdf |title=Stratford Station |access-date=16 August 2009 |archive-url=https://web.archive.org/web/20091007111804/http://www.london2012.com/documents/oda-transport/stratford-regional-station-christmas-2007-improvements-map.pdf |archive-date=7 October 2009 |url-status=dead |df=dmy-all}}</ref> The new platforms have also been built with a reversing siding immediately to the south, accessible from both running lines. This enables trains from Stratford International to terminate at Stratford and trains from Canning Town to also terminate here. There is also a crossover immediately to the north, allowing trains from the southbound platform to reverse onto the northbound line back to Stratford International.


==Services== ==Services==
] platforms, ], ], and main line (])]] ] platforms, ], ], and main line (])]]
Stratford is a major rail hub with services operated by ], ], the ] and ] on the ] and ] Lines. The typical off-peak service in trains per hour (tph) is: Stratford is a major rail hub with services operated by ], ] (on the ]), the ] and ] (on the ] and ]s). The typical off-peak service in trains per hour (tph) is:


{| class="wikitable" {| class="wikitable"
Line 268: Line 267:
| 8 tph to {{rws|Shenfield}} | 8 tph to {{rws|Shenfield}}
|- |-
| ]<br />] | ]<br />]
||4 tph to {{stl|London Underground|Richmond}}<br/>4 tph to {{stnlnk|Clapham Junction}} ||4 tph to {{stl|London Underground|Richmond}}<br/>4 tph to {{stnlnk|Clapham Junction}}
|- |-
Line 295: Line 294:
|line3=dlr|left3=Pudding Mill Lane|to-left3=Lewisham |line3=dlr|left3=Pudding Mill Lane|to-left3=Lewisham
|line4=dlr|left4=Stratford International|right4=Stratford High Street|to-left4=Stratford International|to-right4=Woolwich Arsenal |line4=dlr|left4=Stratford International|right4=Stratford High Street|to-left4=Stratford International|to-right4=Woolwich Arsenal
|system5=London Overground |system5=London Overground
|line5=North|left5=Hackney Wick|to-left5=Clapham Junction or Richmond |line5=Mildmay|left5=Hackney Wick
|system6=Elizabeth Line |system6=Elizabeth Line
|line6=Elizabeth|to-left6=Heathrow Terminal 5|left6=Whitechapel|right6=Maryland|to-right6=Shenfield |line6=Elizabeth|to-left6=Heathrow Terminal 5|left6=Whitechapel|right6=Maryland|to-right6=Shenfield
Line 308: Line 307:
|header13=Disused Railways |header13=Disused Railways
{{Rail line one to three|previous=]<br /><small>Line open, station closed</small> |next1=]<br /><small>Line and station open</small> |next2={{stnlnk|Lea Bridge}}<br /><small>Line and station open</small> |next3=]<br /><small>Line closed, station open</small> |route1=]<br/><small>]</small>|route2=]<br/><small>]</small>|route3=]<br/><small>]<br />Loughton branch</small> |col={{GER colour}} }} {{Rail line one to three|previous=]<br /><small>Line open, station closed</small> |next1=]<br /><small>Line and station open</small> |next2={{stnlnk|Lea Bridge}}<br /><small>Line and station open</small> |next3=]<br /><small>Line closed, station open</small> |route1=]<br/><small>]</small>|route2=]<br/><small>]</small>|route3=]<br/><small>]<br />Loughton branch</small> |col={{GER colour}} }}
{{Rail line|previous={{rws|Ilford}}|rowsmid=2|rows2=2|next={{rws|Lea Bridge}}|route=]<br><small>]</small> |col={{GER colour}}}} {{Rail line|previous={{rws|Ilford}}|rowsmid=2|rows2=2|next={{rws|Lea Bridge}}|route=]<br/><small>]</small> |col={{GER colour}}}}
{{Rail line|previous=]|hidemid=yes|hide2=yes|next={{rws|Lea Bridge}}|route=]<br><small>]</small> |col={{GER colour}}}} {{Rail line|previous=]|hidemid=yes|hide2=yes|next={{rws|Lea Bridge}}|route=]<br/><small>]</small> |col={{GER colour}}}}
{{Rail line|previous={{stnlnk|Bow Road}}|next=|route=]<br/><small>]</small> |col={{GER colour}} }} {{Rail line|previous={{stnlnk|Bow Road}}|next=|route=]<br/><small>]</small> |col={{GER colour}} }}
{{Rail line|previous=]|rowsmid=2|rows2=2|next={{stnlnk|Lea Bridge}} |route=]<br/><small>]</small> |col={{GER colour}} }} {{Rail line|previous=]|rowsmid=2|rows2=2|next={{stnlnk|Lea Bridge}} |route=]<br/><small>]</small> |col={{GER colour}} }}
Line 318: Line 317:


==Electrification== ==Electrification==
All lines at Stratford are electrified, although a few passenger and freight services which pass through this station are hauled by diesel locomotives. At one time there were four different systems of ] in use, a record for any station in London. However, since the diversion of the North London Line from the low-level to the new high-level platforms these trains have changed the electrical system they use while at this station. The remaining systems used are: All lines at Stratford are electrified, although a few passenger and freight services which pass through this station are hauled by diesel locomotives. At one time there were four different systems of ] in use, a record for any station in London. However, since the diversion of the ] from the low-level to the new high-level platforms these trains have changed the electrical system they use while at this station. The remaining systems used are:
* ] ] on ] lines (high level) * ] ] on ] lines, including ] (high level)
* 630 ] ] ] on ] ] and ] lines * 630 ] ] ] on ] ] and ]s
* 750 V DC bottom-contact ] on ] * 750 V DC bottom-contact ] on ]
* Since April 2009, 750 V DC third rail is no longer used at this station. This was used for the ] (low level) ] services. * Since April 2009, 750 V DC third rail is no longer used at this station. This was used for the ] (low level) ] services.


In 1949, the Great Eastern Main Line through Stratford was electrified at 1,500{{nbsp}}V{{nbsp}}DC overhead before being converted to 6.25{{nbsp}}kV ] 50{{nbsp}}] overhead in 1960 and converted again to 25{{nbsp}}kV in about 1976.<ref>{{cite book |last = Glover |first = John |year = 2003 |title = Eastern Electric |publisher = Ian Allan |location = London |ISBN = 0-7110-2934-2}}</ref> In 1949, the Great Eastern Main Line through Stratford was electrified at 1,500{{nbsp}}V{{nbsp}}DC overhead before being converted to 6.25{{nbsp}}kV ] 50{{nbsp}}] overhead in 1960 and converted again to 25{{nbsp}}kV in about 1976.<ref>{{cite book |last = Glover |first = John |year = 2003 |title = Eastern Electric |publisher = Ian Allan |location = London |ISBN = 0-7110-2934-2}}</ref>
Line 328: Line 327:
==Geography== ==Geography==
===Channelsea River=== ===Channelsea River===
The ] is a ]ed major ] that is one of the ] that flow into the ] part of the ]. It flows under Stratford station and rises along the Jubilee line platforms to the south. It was diverted in the 19th century by the Great Eastern Railway and again during construction of the Jubilee Line platforms in the 1990s.{{citation needed|date=January 2018}} The ] is a ]ed major ] that is one of the ] that flow into the ] part of the ]. It flows under Stratford station and rises along the Jubilee line platforms to the south. It was diverted in the 19th century by the Great Eastern Railway and again during construction of the Jubilee line platforms in the 1990s.{{citation needed|date=January 2018}}


==Nearby facilities== ==Nearby facilities==

Latest revision as of 14:54, 22 December 2024

London Underground, Docklands Light Railway and National rail station For other uses, see Stratford station (disambiguation).

Stratford London Underground Docklands Light Railway National Rail London Overground Elizabeth line
Stratford Regional
Stratford (London)
The station's south entrance
Stratford is located in London Borough of NewhamStratfordStratfordLocation of Stratford in London Borough of Newham
LocationStratford
Local authorityLondon Borough of Newham
Managed byTransport for London
OwnerNetwork Rail
Station code(s)SRA
DfT categoryB
Number of platforms19 (17 in use)
AccessibleYes
Fare zone2 and 3
London Underground annual entry and exit
2019Increase 64.85 million
2020Decrease 25.07 million
2021Increase 29.11 million
2022Increase 47.88 million
2023Increase 54.38 million
DLR annual boardings and alightings
2019Increase 10.453 million
2020Decrease 8.757 million
2021Increase 9.977 million
2022included in Underground usage
2023included in Underground usage
National Rail annual entry and exit
2019–20Increase 41.912 million
– interchange Increase 4.882 million
2020–21Decrease 13.985 million
– interchange Decrease 1.746 million
2021–22Increase 28.182 million
– interchange Increase 3.184 million
2022–23Increase 44.137 million
– interchange Increase 5.524 million
2023–24Increase 56.571 million
– interchange Increase 5.542 million
Key dates
20 June 1839Opened by ECR
4 December 1946Central line started
31 August 1987DLR started
14 May 1999Jubilee line started
Other information
External links
Coordinates51°32′32″N 0°00′12″W / 51.5422°N 0.0033°W / 51.5422; -0.0033
London transport portal

Stratford is a major multi-level interchange station serving the town of Stratford and the mixed-use development known as Stratford City, in the London Borough of Newham, East London for London Underground, London Overground, Docklands Light Railway (DLR) and Elizabeth line services. National Rail services also operate on the West Anglia Main Line and the Great Eastern Main Line, 4 miles 3 chains (6.5 km) from Liverpool Street.

It is the fifth busiest railway station in Britain, the busiest station in London outside the London station group, and is the busiest station on the London Underground network outside Travelcard Zone 1.

On the London Underground, the station is on the Central line between Mile End and Leyton stations. It is also the eastern terminus of the Jubilee line and the next station towards west is West Ham. On the DLR, it is a terminus for some trains and for others it is a through-station between Stratford High Street and Stratford International. On the Overground, it is the terminus of the Mildmay line; on the main line it is served by Elizabeth line stopping services between Paddington and Shenfield and by medium- and longer-distance services operated by Greater Anglia to and from numerous destinations in the East of England. There are also limited off-peak services operated by c2c connecting to the London, Tilbury and Southend line to Shoeburyness.

The station was opened in 1839 by the Eastern Counties Railway. Today it is owned by Network Rail and is in Travelcard zone 2/3. To distinguish it from Stratford-upon-Avon in Warwickshire it is sometimes referred to as Stratford (London), or as Stratford Regional to differentiate it from Stratford International, which is some 400 yards (370 m) to the north. Stratford served as a key travel hub for the 2012 Olympic and Paralympic Games held in London.

London Overground
Cheshunt National Rail
Theobalds Grove
Enfield TownTurkey StreetRomford National Rail Elizabeth Line
Bush Hill ParkSouthburyEmerson Park
Upminster National Rail London Underground
National Rail Edmonton Green
Silver StreetChingford
White Hart LaneHighams Park
Watford Junction National RailBruce GroveWood Street
WatfordSeven Sisters National Rail London UndergroundWalthamstow Central London Underground
High StreetHarringayBlackhorse Road London UndergroundWalthamstow Queen's Road
Bushey National RailGreen Lanes
Carpenders ParkCrouch HillSouth TottenhamSt. JamesLeyton Midland Road
Hatch EndUpper (Archway tube station)Stamford HillStreetLeytonstone
Headstone LaneHollowayStoke NewingtonClaptonHigh Road
Harrow & National RailKentish Town WestRectory RoadWanstead Park (Forest Gate railway station)
WealdstoneGospel OakCamden Road (Camden Town tube station)Hackney National RailWoodgrange Park (Manor Park railway station)
Kenton (Northwick Park tube station)Caledonian RoadCanonburyDownsBarking National Rail London Underground
South Kenton& BarnsburyBarking Riverside (Barking Riverside Pier)
NorthNational Rail London Underground Highbury & IslingtonDalston KingslandHackney
Central
WembleyHampstead HeathDalston
Wembley National RailFinchley Road & Frognal (Finchley Road tube station)JunctionLondon Fields
CentralWest Hampstead (West Hampstead Thameslink railway station West Hampstead tube station)HaggerstonCambridgeHomerton
StonebridgeBrondesburyHoxtonHeathHackney Wick
ParkBrondesbury ParkShoreditch High StreetBethnal GreenStratford National Rail Elizabeth Line London Underground Docklands Light Railway
HarlesdenKensal Rise
Kensal GreenNational Rail Elizabeth Line London Underground LiverpoolWhitechapel Elizabeth Line London Underground
Willesden London UndergroundQueen's Park London UndergroundStreetShadwell (Shadwell DLR station)
JunctionKilburn High RoadWapping
South HampsteadRotherhithe
Shepherd's Bush National Rail (Shepherd's Bush tube station)Euston National Rail London Underground (Euston Square tube station)Canada Water London Underground
Kensington (Olympia) London UndergroundSurrey Quays
West Brompton London UndergroundBattersea Park National Rail
Imperial Wharf (Chelsea Harbour Pier)(limited service)New Cross National Rail
National Rail ClaphamNational Rail Queens Road PeckhamNew Cross Gate National Rail
JunctionNational Rail Thameslink Peckham RyeBrockley
Acton CentralWandsworth RoadNational Rail Thameslink Denmark HillHonor Oak Park
South Acton(Clapham North tube station) ClaphamForest Hill
Gunnersbury London UndergroundHigh StreetSydenham National Rail
Kew Gardens
Richmond National RailNational Rail Crystal PalacePenge West
Anerley
Norwood Junction National Rail Thameslink
West Croydon National Rail (West Croydon station)
Legend
StationNational RailNational RailLiberty line
Accessible stationThameslinkThameslinkLioness line
Interchange stationElizabeth LineElizabeth lineMildmay line
Accessible interchangeDocklands Light RailwayDocklands Light RailwaySuffragette line
Internal interchangeLondon UndergroundLondon UndergroundWeaver line
Out-of-station interchangeTramlinkLondon TramsWindrush line
(   )Nearby interchangeLondon River ServicesLondon River Services

The new London Overground line names and colours were introduced across the London rail network in November 2024

History

Early days: 1839–62

Stratford station was opened on 20 June 1839 by the Eastern Counties Railway (ECR) with the first station building being located on Angel Lane which crossed the line on an over-bridge to the east of the station. The Northern and Eastern Railway opened a section of its authorised line from Broxbourne to join the ECR at Stratford on 15 September 1840. As well as a station, a railway works was built adjacent to the line to Broxbourne. This and the engine shed later expanded into the area to the west of the station which is now occupied by a shopping centre and Stratford International station.

The ECR tracks were originally set to a gauge of 5 ft (1,524 mm) on the recommendation of engineer John Braithwaite. At this time there was no legislation dictating the choice of gauge and indeed the directors favoured the Great Western Railway's broad gauge 7 ft (2,134 mm). Braithwaite persuaded the directors otherwise on the grounds of additional cost but recommended the 5 ft gauge in an effort to reduce wear on locomotive parts. This choice meant that the Northern & Eastern Railway who were planning to share the ECR line between Stratford and Bishopsgate were forced to adopt the same gauge.

With the extension of the ECR in the early 1840s it became apparent that standard gauge 4 ft 8+1⁄2 in (1,435 mm) was a more realistic choice and subsequently between September and October 1844 the gauge conversion was carried out. At the same time the associated Northern & Eastern Railway was also converted.

New station buildings were built in 1847 replacing the original structure on Angel Road. These were located in the V between the Cambridge and Colchester lines and access was via Station Road.

The line through the low level platforms first opened in 1846 as a goods only branch as far as Thames Wharf. The bridge under the main line was too low for many locomotives, so a number of engines were equipped with hinged chimneys in order they could operate the line. On opening there was also a line that linked what is now known as the Great Eastern Main Line directly to the docks enabling through running from Colchester to Thames Wharf. The docks and associated railway networks expanded with passenger services to North Woolwich starting in 1847.

There was an accident at Stratford station on 18 July 1846 when an up goods train ran into the back of a passenger train from Ipswich. There were 10 passengers seriously injured one of whom later died.

In 1854 the newly opened London Tilbury and Southend Railway served Stratford joining the main line at Forest Gate Junction a few miles north. Their services generally served Fenchurch Street and were routed via the Bow Road route (although that station was not opened at this time) although some carriages were detached at Stratford for onward working to Bishopsgate. This practice was discontinued in 1856 as passengers preferred the more conveniently sited (for the city) Fenchurch Street.

In connection with the introduction of the new LTSR services a third line was built from Stratford to Bow Junction which was used by down Fenchurch Street services and a new platform face opened.

It soon became apparent that congestion was a problem at Stratford and by 1856 permission was sought to build a line from Barking to Gas Factory Junction (Bow) which was opened in 1858. After that LTSR trains were no longer routed via Stratford.

By 1855 there were links from both the low and high-level stations to the North London Line as well as a spur that enabled trains from Liverpool Street to North Woolwich to avoid Stratford altogether (although this served Stratford Market station) which was a short distance away. Services from the North London line normally started from Victoria Park and ran through to Stratford Market. This service operated from 1866 until 1874 and was operated by the GER and North London Railway in alternate years up until 31 October 1874.

The North London Railway was also running through Stratford high level with two return trains per day from Hampstead Road (later renamed Chalk Farm) via Victoria Park and Forest Gate Junctions to Tilbury which commenced on 1 July 1855 and finished 30 September.

Services to Loughton commenced on 22 August 1856 and used the Lea Valley platforms, leaving the main line at Loughton Branch Junction half a mile north of Stratford. Initially nine trains per day operated to Fenchurch Street (Bishopsgate on Sundays) on this route.

By the 1860s the railways in East Anglia were in financial trouble, and most were leased to the ECR; they wished to amalgamate formally, but could not obtain government agreement for this until 1862, when the Great Eastern Railway was formed by amalgamation. Thus Stratford became a GER station in 1862.

Great Eastern Railway: 1862–1923

The Loughton branch was extended to Ongar on 24 April 1865 and by 1874 there were a total of 40 trains each day (10 terminating at Loughton, 18 at Epping and 12 at Ongar) with most serving the newly opened Liverpool Street although a few peak hour services continued to serve Fenchurch Street.

Even after LTSR services were routed away from Stratford in 1858 working remained intense. Following an accident in 1866 the accident report noted that "Stratford needs complete re-arranging, extending and fitting with modern improvements for working points and signals, as in its present state it appears to be quite insufficient for the traffic that passes through it". Although one of the signal boxes had interlocking fitted soon after, the poor state of GER finances saw little further work until 1877 when a significant rebuilding of Stratford took place.

Another short-lived North London Railway service operated in September and October 1866, linking Chalk Farm with Barking (again routed via Victoria Park and Forest Gate Junctions). This service was withdrawn due to congestion, and one of the services was involved in a collision on 10 September 1866 with 20 passengers being injured.

The 1877 rebuilding saw a number of changes made, which were:

  • A fourth line was added from Bow Junction to Stratford;
  • Western Junction (where a spur to towards the Woolwich line existed along with various crossovers) was moved further west;
  • New Goods lines added on the down (north) side of the line between Western Junction and the Cambridge line platforms – changes made at Central Junction to accommodate these;
  • New Goods lines between Western Junction and Maryland Point signal box (west of the current 2015 Maryland station);
  • Eastern curve (which allowed up goods trains from the main line to directly access the low level line towards the docks) was re-aligned; and
  • New signal boxes at Eastern, Central and Western Junctions.

Between 1886 and 1887, improvements were made to the station buildings and the canopies extended.

On 26 December 1886, a train was derailed at Stratford station as facing points had not been properly locked into position. Fortunately there was no loss of life.

By 1889, traffic on the GER had grown to such an extent, that quadrupling the section from Bethnal Green to Bow Junction and from Maryland Point-Romford was proposed. Once again significant changes which were implemented between 1891 and 1893 and included:

  • Two additional lines from Bow Junction resulting in six tracks in total (named Up and Down Local, Up and Down Through and Up and Down Fenchurch Street);
  • To accommodate these the Up and Down Fenchurch Street lines were slewed to the south of the formation;
  • The 1877 signal boxes at Western, Central and Eastern Junctions were all replaced between 1891 and 1893; and
  • Carpenters Road curve added at this time (Western Junction to Carpenters Road Junction)

In 1896, the low-level line was lowered under the main line so locomotives no longer required hinged chimneys.

By July 1897, it was apparent that the decision not to include platforms on both Through lines was causing some operational difficulty. To address this a new platform serving the Up Through line was opened in 1900.

The Fairlop Loop opened on 1 May 1903 and services generally ran as an out and back circle from either Liverpool Street or Fenchurch Street. The routing of these services was Liverpool Street – Stratford – Ilford – Fairlop Loop – Woodford – Stratford – Liverpool Street) and Liverpool Street – Stratford – Woodford – Fairlop Loop – Ilford – Stratford – Liverpool Street in the reverse direction.

Railway lines around Stratford in 1914

On 1 January 1923, the GER became part of the London & North Eastern Railway.

London and North Eastern Railway: 1923–47

By the 1930s electric tramways were taking a lot of traffic from the railway and proposals were drawn up to electrify the lines from Liverpool Street to Shenfield using the 1500 V DC system. By 1938 the major contracts were let and work started. Despite the commencement of the Second World War in 1939, work was initially continued on the scheme, however, the scheme was postponed in late 1940. In February 1946, the LNER announced work would recommence. On 5 October 1946, the new interchange platforms with the Central line (see below) were opened.

London Underground Central line services started on 4 December 1946, extended from Liverpool Street station in new tunnels after being delayed due to the Second World War. The line was further extended to Leyton on 5 May 1947 and then to the former Great Eastern Railway branch lines to Epping, Ongar and Hainault progressively until 1957. Prior to this date trains to and from Epping and Ongar had used the currently numbered platforms 11 and 12 and diverged from the Broxbourne line about half a mile north of the station. Trains for the Hainault loop used either these platforms or the currently numbered platform 5 (up) or 8 (down) diverging from the Great Eastern Main Line at a junction between Ilford and Seven Kings which has since been redeveloped as part of the Ilford Carriage sheds.

British Railways: 1948–96

Stratford low level platforms in 1987

The nationalisation of Britain's railways saw the operation of Stratford station pass to British Railways Eastern Region. A new station building was designed by Thomas Bennett and opened in 1948.

Progress on electrification that had been halted by the Second World War resumed after the end of hostilities. The line between Liverpool Street and Stratford was electrified from 3 December 1946, and the full electrification of the Shenfield line at 1500 V DC was completed in September 1949. The electric service between Liverpool Street to Shenfield was inaugurated on 26 September 1949 but services were run to steam timings with a number of steam trains still operating. The full electric service officially commenced on 7 November 1949 (although a full dummy run had taken place the previous day). Two days earlier services to Fenchurch Street via Bow Road were withdrawn.

On 8 April 1953, 12 people were killed and 46 were injured as a result of a rear-end collision in a tunnel just to the east of Stratford station, caused by driver error after a signal failure.

Between 1960 and 1961, the 1,500 V DC electrification to Shenfield line which had been extended to Southend and Chelmsford was converted to 6.25kV ac.

In the autumn of 1980, conversion of the overhead electrification from 6.25kV ac to the standard supply of 25kV ac of the Liverpool St. to Shenfield line.

The Docklands Light Railway (DLR) opened on 31 August 1987 reusing redundant rail routes through the Bow and Poplar areas to reach the new Docklands developments on the Isle of Dogs. Initially the line used one of the south facing bays which had been built for the Fenchurch street via Bow Road service (but never used).

Privatisation era: 1996–present

South entrance of the station in 2005

In the 1990s, the low-level station was substantially rebuilt as part of the Jubilee Line Extension works. This work included three additional surface platforms and a train crew building (designed by Troughton McAslan) and a large steel and glass building that encloses much of the low-level station, providing a new ticket hall (designed by Wilkinson Eyre). The old ticket hall, at the eastern end of the station and connected via a subway, has since been demolished. The Jubilee line opened to passengers on 14 May 1999 as far as North Greenwich station, and to Green Park and Stanmore in November 1999.

In preparation for the 2012 Olympic and Paralympic Games, the capacity of the station was tripled at a cost of around £200m, with construction work funded by the Olympic Delivery Authority (£125m) and Westfield. It was estimated that around 120,000 people would use the station at peak periods during the Games.

Construction took place between 2005 and 2011, and work included:

  • New high level DLR platforms, allowing three-car trains to use the station. These platforms were designed by Will Alsop, and opened in December 2007.
  • Expansion, reopening and refurbishment of interchange subways
  • Provision of step free access to all platforms, including 14 new lifts
  • Widened and lengthened platforms
  • New mezzanine entrance on the south side of the station, connecting to a unpaid pedestrian link bridge over the railway funded by Westfield
  • New platforms for London Overground (newly built high-level platforms 1 & 2, moving from the original low-level platforms 1 & 2). These opened in spring 2009.
  • Additional Spanish solution westbound platform for the Central line. This opened in September 2010.
  • New northern ticket hall built as part of the Westfield Stratford City development, adjacent to Stratford City bus station
  • An extension of the DLR to Stratford International station using the old North London line route from Canning Town, using the platforms vacated by the North London line. This opened in August 2011.

Since the turn of the millennium, "passenger movements" have risen from around 40 million a year in 2006 to 128 million in 2019, making it one of Britain's major rail interchanges.

From 6 November 2022, Elizabeth line services enter the central tunnel built as part of the Crossrail project, allowing direct trains to Heathrow and Reading via Paddington. All trains, save for some early morning, late night and peak hour services, go via Whitechapel.

Work started in 2023 to add a new entrance to the station at its southwestern corner, adjacent to the Jubilee line concourse, allowing access to the Carpenters Estate. This will reducing walking time for local residents by up to 20 minutes. The new entrance opened on 10 July 2024.

Station layout

A 360° view taken in October 2005 of the canopy structure housing the ticket hall. The high-level station is through the windows in the centre, the low-level station is on the right, with the gates to the Jubilee line (now removed) on the far left.
The same view in August 2008. Note the new DLR platforms on the left, and the additional westbound Central line platform under construction through the windows in the left-centre.

High-level platforms

Stratford stations
Legend
Stratford International
Docklands Light Railway DLR via Canning Town
National Rail High Speed 1
HL Stratford
London Overground North London line
National Rail West Anglia Main Line
National Rail Great Eastern Main Line
Elizabeth line Elizabeth line
Central line (London Underground) Central line
Docklands Light Railway DLR via Poplar
Jubilee Line Jubilee line
LL Docklands Light Railway DLR via Canning Town
Stratford Market depot
Docklands Light Railway Stratford High Street
Source

The high-level platforms run at right angles to the low-level, roughly east–west. The Docklands Light Railway serving platforms 16 and 17 passes beneath the high-level station. Except for platforms 4A and 4B, access from the main station entrance is via subways, one of which links the Jubilee line platforms directly to platforms 3 and 5 to 10. Another subway, which had served the old entrance to the station, was re-opened in September 2010.

  • Platforms 1 and 2 are used by the London Overground's Mildmay line. They comprise an island platform with a step-free link to platform 12 and the subways linking to platforms 3 to 11. The platforms can accommodate trains with up to six carriages, though at present, due to short platforms elsewhere, shorter trains are used.
  • Platforms 3, 3A and 6 are used by the London Underground Central line, which rise from their tunnels onto the overground here and then immediately descend back underground upon departure from Stratford. Platforms 3 and 6 are island platforms providing cross-platform interchange with the Elizabeth line and weekend c2c services operating from platforms 5 and 8 respectively, while platform 3A has a direct step-free connection at mezzanine level, facilitating easier interchange with Jubilee line trains on platforms 13 to 15 and DLR trains on platforms 4A and 4B. Westbound Central line trains travelling towards central London open doors on both sides so that passengers can alight and board trains from either platform, reducing dwell times and peak-hour congestion in the passageways.
  • Platforms 4 and 7 are disused. When the main line to Shenfield was electrified in the 1940s there was an intention to run a shuttle service from Fenchurch Street to Stratford, calling at Stepney East (now Limehouse) and Bow Road, which would have terminated at these bay platforms. However, this service was never introduced (despite all the works required being carried out). From the 1980s platform 4 was used as the terminus of the DLR while platform 7 remained abandoned. In 2007, platform 4 was abandoned again as the DLR moved to two new platforms to the south of platform 4, though these are signposted as "platform 4" within the station.
  • Platforms 4A and 4B (signposted as "platform 4") are used by the DLR for services to Poplar, Canary Wharf, Greenwich and Lewisham. They are formed of an island platform, and are not accessed by the subways but through a separate entrance on the upper level of the main concourse.
  • Platforms 5 and 8 are used by Elizabeth line stopping services on the electric line between Paddington and Shenfield. They may also be used by some Greater Anglia-operated main line trains to and from Southend Victoria. Weekend c2c trains call on the way to or from Liverpool Street connecting to or from the London, Tilbury and Southend line via Barking. Cross-platform interchange is available with the Central line running from platforms 3 and 6 respectively.
  • Platforms 9, 10 and 10A are used by Greater Anglia services on the main line out of Liverpool Street towards Norwich and intermediate stations and branch lines. Originally there were only two platforms here, but in the 1990s the station buildings on platform 9 were demolished to make an island platform with faces on both sides. The new face became number 9, the former 9 became 10, and the previous platform 10 became 10A.
  • Platforms 11 and 12 are used for the Greater Anglia services to Bishop's Stortford that start from Stratford. There is currently a half-hourly service Mondays to Saturdays, with additional services to and from Hertford East, Harlow Town, Broxbourne or Cambridge in the peak hours with a half-hourly service to Hertford East on Sundays. In 2021 these platforms were additionally used for London Overground's North London line.

Low-level platforms

These platforms are at ground level and run north–south. Platforms 13 to 16 are served by a footbridge (with lifts and escalators) from the main station entrance, while platform 17 adjoins directly onto the main station concourse.

  • Platforms 13 to 15 were built in the late 1990s to serve the Jubilee line when it was extended to Stratford in 1999. All three are bay platforms. A footbridge joins the platforms at the southern end, away from the main station building. Since 2018, almost all trains use platforms 14 and 15 (an island platform), with platform 13 only seeing a few trains at either end of the day (including Night Tube services).
  • Platforms 16 and 17 (known as platforms 1 and 2 until 2009) originally served trains from Palace Gates in north London to North Woolwich, but this service has since been discontinued. In the 1980s, North London line trains from Richmond to Broad Street were diverted to run via these platforms to North Woolwich. Following the closure of the line to North Woolwich in 2006, these effectively became terminus platforms, with trains departing westbound only towards Richmond. Following the North London line trains moving to new platforms 1 and 2 on the high level, they were converted in 2011 for use by DLR services: platform 16 is for northbound trains to Stratford International and platform 17 is for southbound trains via Canning Town to Woolwich Arsenal. The new platforms have also been built with a reversing siding immediately to the south, accessible from both running lines. This enables trains from Stratford International to terminate at Stratford and trains from Canning Town to also terminate here. There is also a crossover immediately to the north, allowing trains from the southbound platform to reverse onto the northbound line back to Stratford International.

Services

(Photos taken in 2008) Different platform signage, clockwise from top left: on London Overground platforms, Docklands Light Railway, Jubilee line, and main line (National Express East Anglia)

Stratford is a major rail hub with services operated by Greater Anglia, London Overground (on the Mildmay line), the Elizabeth line and London Underground (on the Central and Jubilee lines). The typical off-peak service in trains per hour (tph) is:

Operator/line Frequency to destination
London Underground
Central line
9 tph to Ealing Broadway
9 tph to West Ruislip
3 tph to Northolt
3 tph to White City
9 tph to Hainault (via Newbury Park)
3 tph to Newbury Park
9 tph to Epping
3 tph to Loughton
London Underground
Jubilee line
12 tph to Stanmore
4 tph to Wembley Park
4 tph to Willesden Green

4 tph to West Hampstead

Elizabeth line 6 tph to Paddington
2 tph to Heathrow Terminal 5
8 tph to Shenfield
London Overground
Mildmay line
4 tph to Richmond
4 tph to Clapham Junction
Docklands Light Railway 12 tph to Canary Wharf via Poplar
8 tph to Stratford International
8 tph to Woolwich Arsenal via London City Airport
Greater Anglia 7 tph (+ 1 tph to set down only) to London Liverpool Street
East Anglia
3 tph to Southend Victoria
1 tph to Norwich (pick up only)
1 tph to Braintree
1 tph to Clacton-on-Sea
1 tph to Colchester Town
1 tph to Ipswich
West Anglia
2 tph to Bishop's Stortford
2 tph to Meridian Water
c2c (weekends only) 2tph to Shoeburyness
2tph to London Liverpool Street
Preceding station London Underground Following station
Mile Endtowards Ealing Broadway or West Ruislip Central line Leytontowards Epping, Hainault or Woodford via Newbury Park
West Hamtowards Stanmore Jubilee line Terminus
Preceding station Docklands Light Railway DLR Following station
Pudding Mill Lanetowards Lewisham Docklands Light Railway Terminus
Stratford InternationalTerminus Stratford High Streettowards Woolwich Arsenal
Preceding station London Overground Following station
Hackney Wicktowards Clapham Junction or Richmond Mildmay lineNorth London line Terminus
Preceding station Elizabeth line Following station
Whitechapeltowards Heathrow Terminal 5 Elizabeth line Marylandtowards Shenfield
Liverpool StreetTerminus
Preceding station National Rail National Rail Following station
London Liverpool StreetGreater AngliaGreat Eastern Main LineRomford
Shenfield
TerminusGreater AngliaTemple Mills branch lineLea Bridge
London Liverpool Streetc2cConnection to LTS Line
(Limited services)
Barking
Disused Railways
Coborn Road for Old Ford
Line open, station closed
  Great Eastern Railway
Great Eastern Main Line
  Maryland Point
Line and station open
  Great Eastern Railway
Lea Valley lines
  Lea Bridge
Line and station open
  Great Eastern Railway
Eastern Counties Railway
Loughton branch
  Leyton
Line closed, station open
Ilford   Great Eastern Railway
Hall Farm Curve
  Lea Bridge
Coborn Road for Old Ford    
Bow Road   Great Eastern Railway
Bow Curve
  Terminus
Stratford Market   Great Eastern Railway
Palace Gates line
  Lea Bridge
Coborn Road for Old Ford    
Hackney Wick   Silverlink
North London line
  West Ham
Highbury & Islington   Anglia Railways
London Crosslink
  Romford

Electrification

All lines at Stratford are electrified, although a few passenger and freight services which pass through this station are hauled by diesel locomotives. At one time there were four different systems of electrification in use, a record for any station in London. However, since the diversion of the North London line from the low-level to the new high-level platforms these trains have changed the electrical system they use while at this station. The remaining systems used are:

In 1949, the Great Eastern Main Line through Stratford was electrified at 1,500 V DC overhead before being converted to 6.25 kV AC 50 Hz overhead in 1960 and converted again to 25 kV in about 1976.

Geography

Channelsea River

The Channelsea River is a culverted major tidal stream that is one of the Bow Back Rivers that flow into the Bow Creek part of the River Lea. It flows under Stratford station and rises along the Jubilee line platforms to the south. It was diverted in the 19th century by the Great Eastern Railway and again during construction of the Jubilee line platforms in the 1990s.

Nearby facilities

Goods facilities

There were three primary goods facilities in the Stratford area in the steam age, although the nearby Stratford Works and engine shed generated their own traffic. A short distance to the north of Stratford station (on the line to Cambridge) there were marshalling yards at Temple Mills. There was a small goods yard north of the station on the east side of the line which occupied a constrained site. The mainstay of traffic was domestic coal although shortly before closure in the 1960s the site was used as a reception point for concrete components for the building of tower blocks in Newham.

There was a small depot at Carpenters Road about a quarter of a mile south of Stratford station. Opened in 1900, the depot consisted of four long sidings and primarily dealt with coal and building materials. It was closed on 7 December 1964.

There was a large depot at Stratford Market railway station. All of these three facilities were operated by the Great Eastern Railway up until 1923 before being taken over by the London & North Eastern Railway until nationalisation in 1948 when they became part of British Railways Eastern Region.

There was also a goods terminal at Bow operated by the Midland Railway which is still open today mostly for building materials. This yard operated as the terminal for building materials for the adjacent Olympics site.

Between Stratford and Maryland stations Windmill Lane cattle pens existed on the down side of the line whilst four private sidings belonging to Young & Martens were located on the up side.

During the 1960s part of the Stratford Works site was converted to the London International Freight Terminal (LIFT) which opened in 1967 and there was a freight liner terminal that operated on the far side of the Stratford railway complex (on the Channelsea Loop line) between 1967 and 1994. The former site is now occupied by the international station and shopping centre.

Stratford International

Main article: Stratford International station

The nearby Stratford International station opened on 30 November 2009 (for preview services only). Since 13 December 2009 Southeastern began its full domestic high-speed service between London St Pancras, directly to Ebbsfleet International and Ashford in Kent. The Docklands Light Railway 'Stratford International' extension has provided a link between the two stations since 31 August 2011. There is also a walking route between the two stations passing through Westfield Stratford City Shopping Centre.

Despite Stratford International's name, no international trains call there, and Eurostar (currently the only international operator) has no plans to do so. Passengers instead interconnect on high-speed trains travelling to either London St Pancras or Ebbsfleet in Kent, there are a number of other potential operators that may use the station for international services. These include Deutsche Bahn's proposed London-Frankfurt/Amsterdam service.

Stratford City

Main article: Stratford City

In preparation for the Olympics and the Stratford City development, a new north-facing exit and ticket hall has been built. Both existing passenger subways have been extended north to connect with the ticket hall, and the abandoned subway at the eastern end of the station, which formed part of the old station complex, has been reopened and refurbished to allow interchange between platforms 3–12 and the new high-level platforms 1 & 2. A new pedestrian bridge has also been built to connect Stratford shopping centre with the Stratford City development. This also connects the mezzanine-level ticket hall with the northern one. The northern ticket hall and the footbridge opened along with Westfield Stratford City on 13 September 2011.

Bus stations

Main articles: Stratford bus station and Stratford City bus station

Stratford bus station is to the south of the station and Stratford City bus station is to the north. Both are served by bus services right across London and to the Queen Elizabeth Olympic Park.

Future proposals

Stansted Express may call at Stratford in the future via the West Anglia Main Line, reconnecting the two to each other.

The Hall Farm Curve link could be reinstated allowing a Liverpool Street to Chingford service via Stratford. Designs for new services have been suggested to reduce journey times between Chingford and Stratford to 20 minutes, and high-frequency journeys between Walthamstow Central and Stratford to 12 minutes from the current duration of about 35 minutes.

Rebuild of station

In the 2020s, work is underway planning a rebuild of the station. "Passenger movements" have grown by 90 million in 13 years, and this is predicted to rise by 60% by 2041, leading to overcrowding. Three different plans have been outlined, ranging from "modest changes to a major redevelopment of the station". Redevelopment would also include transit-oriented development including new homes and offices.

Notes

  1. Refers to the number of people who use the station, including those who only change train or Tube lines.
  2. Refers to the number of people who use the station, including those who only change train or Tube lines.

References

  1. ^ "Stratford Regional Station". London 2012 Olympic Organising committee. Archived from the original on 2 December 2009. Retrieved 14 December 2009.
  2. ^ "Station Facilities: Stratford". National Rail Enquiries. 26 November 2009. Archived from the original on 5 January 2010. Retrieved 11 December 2009.
  3. ^ "Sub-committee Minutes". Rail & Underground Sub-committee. London TravelWatch. 16 May 2006. Archived from the original on 10 December 2006. Retrieved 8 December 2009.
  4. "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
  5. "London and South East" (PDF). National Rail. September 2006. Archived from the original (PDF) on 6 March 2009.
  6. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  7. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
  8. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  9. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
  10. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
  11. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Retrieved 9 January 2022.
  12. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 9 January 2022.
  13. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  14. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 20 October 2023.
  15. "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
  16. ^ "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
  17. ^ "Estimates of station usage | ORR Data Portal".
  18. "Stratford station improvements". Network Rail. Retrieved 20 October 2023.
  19. Archived 18 October 2015 at the Wayback Machine Stratford to be 're-zoned' to bring its three stations into transport zones 2/3. 21 July 2014. Retrieved 10 November 2015
  20. London 2012: Stratford Regional station Archived 16 September 2010 at the Wayback Machine. Retrieved 9 September 2010.
  21. White, H.P. (1987). Thomas, David St John (ed.). A Regional History of the Railways of Great Britain – Volume 3: Greater London (3rd ed.). Dawlish, UK: David & Charles.
  22. Brooks, Lyn (October 1993). "Broad gauge on the Eastern Counties Railway". Great Eastern Journal: 34.
  23. ^ Kay, Peter (1996). Great Eastern in Town and Country Vol 3. Clophill, UK: Irwell Press. p. 18. ISBN 1-871608-74-0.
  24. ^ Brooks, Lyn D; Watling J; et al. (1987). Return to North Woolwich. North Woolwich: PEMT/Great Eastern Railway Society. p. 4. ISBN 0-906123-09-7.
  25. Brooks, Lyn D; Watling J; et al. (1987). Return to North Woolwich. North Woolwich: PEMT/Great Eastern Railway Society. pp. 24–25. ISBN 0-906123-09-7.
  26. Cock, Chris; Roger Farrant (August 2006). "Hall's panel signals on the ECR". Great Eastern Journal. 128: 128.20.
  27. Connor, J. E. (1998). Fenchurch Street to Barking. Midhurst UK: Middleton Press. p. x. ISBN 1-901706-20-6.
  28. Borley, H V (1993). The memories and writings of a London railway man. Mold: Railway & Canal Historical Society. p. 76. ISBN 0-901461-16-4.
  29. ^ Borley, Harold V (1993). The memories and writings of a North London Railwayman. Clwyd, UK: Railway and Canal History Society. p. 77. ISBN 0-901461-16-4.
  30. Jackson, Alan A (1999). London's Local Railways (Second ed.). Harrow Weald UK: Capital Transport Publishing. p. 382. ISBN 1-85414-209-7.
  31. Vaughan, Adrian (1997). Railwaymen, Politics and Money. London: John Murray. pp. 134, 135. ISBN 0-7195-5150-1.
  32. Jackson, Alan A (1999). London's Local Railways (Second ed.). Harrow Weald UK: Capital Transport Publishing. pp. 384, 387. ISBN 1-85414-209-7.
  33. Kay, Peter (1996). London,Tilbury & Southend Railway. Teignmouth, United Kingdom: Peter Kay. p. 40. ISBN 1-899890-10-6.
  34. Vosiey, F (July 1986). "Accidents on the Great Eastern part 13". Great Eastern Journal: 47.21.
  35. Kay, Peter (1996). Great Eastern in Town and Country Vol 3. Clophill, UK: Irwell Press. pp. 18, 19. ISBN 1-871608-74-0.
  36. Jackson, Alan A (1999). London's Local Railways (Second ed.). Harrow Weald UK: Capital Transport Publishing. pp. 395, 396. ISBN 1-85414-209-7.
  37. Baker, John (April 1992). "The Great Eastern Section electrification part 1". Great Eastern Journal: 70.9–70.12.
  38. Croome, Desmond F.; Jackson, Alan A. (1993). Rails through the clay: a history of London's tube railways (2nd ed.). Harrow Weald: Capital Transport. p. 286. ISBN 978-1-85414-151-4.
  39. Croome, Desmond F.; Jackson, Alan A. (1993). Rails through the clay: a history of London's tube railways (2nd ed.). Harrow Weald: Capital Transport. pp. 294–297. ISBN 978-1-85414-151-4.
  40. Lawrence, David (2018). British Rail Architecture 1948-97. Crecy Publishing Ltd. p. 18. ISBN 9780860936855.
  41. Baker, John (July 1992). "The Great Eastern Section electrification part 2". Great Eastern Journal: 71.8–71.9.
  42. McMullen, D.; London Transport Executive (October 1953). Ministry of Transport (ed.). Report on the Collision which occurred on 8th April 1953 near Stratford on the Central Line (PDF). Railway Accidents (Report). Her Majestry's Stationery Office.
  43. "Tube Train Crash – Stratford" (black & white newsreel). Pathé News. 1953. Archived from the original on 4 June 2012. Retrieved 12 June 2012.
  44. Cowley, Ian (1987). Anglia East. Newton Abbot: David & Charles. p. 11. ISBN 9780715389782.
  45. Cowley, Ian (1987). Anglia East. Newton Abbot: David & Charles. p. 59. ISBN 9780715389782.
  46. Pearce, Alan (2000). Docklands Light Rail : official handbook. Brian Hardy, Colin Stannard (4th ed.). Harrow: Capital Transport. p. 8. ISBN 1-85414-223-2. OCLC 456423124.
  47. Cross, David (1 September 1987). "Enthusiasts flock to busy opening day: Docklands Light Railway". The Times. London.
  48. Jolly, Stephen; Bayman, Bob (1987). Docklands Light Railway Official Handbook (1st ed.). Capital Transport. ISBN 9780904711806.
  49. ^ Bennett, David (2004). Architecture of the Jubilee Line Extension. London: Thomas Telford. ISBN 0727730886. OCLC 51870430.
  50. Horne, M (2000). The Jubilee Line. Capital Transport Publishing. p. 79.
  51. "Prescott launches Dome tube link". BBC News. 14 May 1999. Retrieved 25 March 2023.
  52. ^ "£100 million work begins on upgrading Stratford Station". insidethegames.biz. 29 August 2009. Retrieved 14 October 2023.
  53. "Stratford station will be the gateway to 2012 Games". BBC News. 1 June 2011. Retrieved 14 October 2023.
  54. ^ "Stratford Regional Station". London 2012. Archived from the original on 16 September 2010. Retrieved 14 October 2023.
  55. "Stratford station will be the gateway to 2012 Games". BBC News. 1 June 2011. Retrieved 14 October 2023.
  56. "Stratford Station Upgrade". adamshendry.co.uk. Retrieved 14 October 2023.
  57. "Stratford DLR Station — aLL Design International Architects". all.design. 30 August 2018. Retrieved 14 October 2023.
  58. "Stratford station is given £104m". BBC News. 16 March 2007. Retrieved 14 October 2023. 14 new lifts
  59. "New £211m DLR extension connecting Olympic venues opens". BBC News. 31 August 2011. Archived from the original on 1 September 2011.
  60. ^ "Stratford: Business case submitted to improve 'confusing' railway station". BBC News. 1 August 2023. Retrieved 14 October 2023.
  61. "Elizabeth Line set to further transform travel with direct links to central London". Crossrail. 23 August 2022. Archived from the original on 23 August 2022. Retrieved 23 August 2022.
  62. ^ "New Stratford Station entrance opens up the potential for Carpenters Estate". Newham.gov.uk. 16 May 2023.
  63. "New Carpenters Estate Entrance to Stratford Station Now Open". Newham.gov.uk. 10 July 2024.
  64. Detailed map of London Tube, Underground, Overground, DLR, Tramlink & National Rail
  65. "Transport Big Build – Complete" (PDF). Olympic Delivery Authority. June 2011. p. 7. Archived from the original (PDF) on 1 December 2011. Retrieved 14 December 2011.
  66. ^ London Overground: Statford Platform Changes Archived 18 January 2012 at the Wayback Machine (Information leaflet, TfL January 2009)
  67. "National Express West Anglia Timetable 18 – Cambridge/Bishop's Stortford to Stratford" (PDF). National Express East Anglia. December 2011. Retrieved 20 January 2012.
  68. "Stratford Station". Commission for Architecture and the Built Environment (CABE). Archived from the original on 18 January 2011. Retrieved 1 March 2008.
  69. "Stratford Station" (PDF). Archived from the original (PDF) on 7 October 2009. Retrieved 16 August 2009.
  70. Glover, John (2003). Eastern Electric. London: Ian Allan. ISBN 0-7110-2934-2.
  71. Watling, John (July 1984). "London Goods stations of the Great Eastern Railway Part 1". Great Eastern Journal (39): 12,13.
  72. Watling, John (July 1984). "London Goods stations of the Great Eastern Railway Part 1". Great Eastern Journal (39): 13.
  73. "Bow Midland Yard". London Reconnections. Archived from the original on 2 January 2014. Retrieved 31 December 2013.
  74. Brennand, D (2011). London's East End Railways. Nottingham, UK: Booklaw Publications. p. 8. ISBN 978-1-907094-74-3.
  75. Shannon, Paul (23 December 2015 – 5 January 2016). "Freightliner's 50 years". Rail. Vol. 790. p. 72.
  76. "Ebbsfleet interconnecting station for international trains". Archived from the original on 15 February 2015. Retrieved 30 June 2012.
  77. "Docklands Light Railway extension marks one year to go to the London 2012 Paralympic Games". Retrieved 31 August 2011.
  78. Jameson, Angela (10 March 2010). "Deutsche Bahn may run London to Frankfurt service". The Times. London. Archived from the original on 29 June 2011. Retrieved 2 April 2010.
  79. "Stratford Station Upgrade: Proposed Subway Level Layout" (PDF). Transport for London. Archived (PDF) from the original on 4 June 2011. Retrieved 11 February 2009.
  80. "Stansted targets 40-minute train trip to London". Archived from the original on 2 July 2015.
  81. Curtis, Joe (26 June 2012). "CHINGFORD: Return of Hall Farm Curve to be 'seriously considered'". Waltham Forest Guardian. Archived from the original on 14 December 2012. Retrieved 1 October 2012.
  82. ^ Vickers, Noah (1 August 2023). "Plans for major upgrade at Stratford Station revealed". Evening Standard. Retrieved 14 October 2023.
  83. Spocchia, Gino (21 August 2023). "5th Studio unveils first concepts for Stratford Station redesign". The Architects’ Journal. Retrieved 14 October 2023.

External links

Stratford station
Transport in London
Companies and
organisations
Transport for
London
(TfL)
London Underground
London Rail
London Buses
Other
Bus operators
River operators
Train operators
Other
Airports
Within London
Outside London
Major stations
Central area
Other
Roads
Motorways
Ring roads
Charging
Ticketing
Other
Former BR sectors
Central line
Stations
Epping branch
Hainault loop
Ealing branch
Ruislip branch
Rolling stock
History
Former stations
Former companies
Abandoned plans
Richmond extension (1913)
Richmond extension (1920)
Denham extension
Former rolling stock
Proposed stations
Depots

London transport portal

Jubilee line
Stations
Rolling stock
Depots
History
Jubilee Line Extension
Former lines
Former stations
Abandoned plans
Phase 2 (1971)
Phase 3 (1971/72)
Phase 3 (1980)
Former rolling stock
London Overground
Mildmay line
West London line
North London line
Other topics
Future plans
Planned and proposed stations
  • Brent Cross West
  • Castle Green
  • Thamesmead
  • Abbey Wood National Rail
  • East Brixton
  • Maiden Lane
  • Junction Road
  • Surrey Canal
  • Old Oak Common Lane
  • Hythe Road
  • Primrose Hill
  • Planned and proposed routes
    Rolling stock
    Current
    Former
    Operations
    History
    London transport portal
    Docklands Light Railway
    Stations
    Bank/Tower Gateway – Canning Town
    Lewisham branch
    Stratford branch
    Beckton branch
    Woolwich Arsenal branch
    Stratford International branch
    Future
    Extensions
    Stations
    Rolling stock
    Rolling stock
    Depots
    Lea Valley lines and Hertford East branch line
    Cheshunt line
    (via Stamford Hill and Southbury)
    Chingford line
    (via Clapton and Walthamstow Central)
    Enfield Town
    (via Stamford Hill and Seven Sisters)
    Hertford East line
    (via Hackney Downs and Tottenham Hale)
    Elizabeth line
    Stations
    Heathrow branch
    Reading branch
    Central core
    Abbey Wood branch
    Shenfield branch
    Proposed stations
    Rolling stock
    Operations
    Related routes
    London transport portal
    Major railway stations in Great Britain
    Managed by Network Rail
    Managed by train operator
    London
    Managed by Network Rail (termini)
    Managed by train operator
    Termini
    Through stations
    Railway stations served by Greater Anglia
    Stations listed in italics are limited service on the line specified. They are also request stops if on Regional.
    Inter-City
    Great Eastern
    Main Line
    Shenfield–Southend
    Crouch Valley
    Braintree branch
    Gainsborough
    Sunshine Coast
    Mayflower
    West Anglia
    Main Line
    Lea Valley
    Hertford East branch
    Cambridge and Ely
    Stansted Express
    Regional
    Rail transport in the United Kingdom
    WilkinsonEyre
    Bridges
    Cultural
    Education
    Public buildings
    Tall buildings
    Arenas
    Categories: