Misplaced Pages

British Rail Class D3/14

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Class of diesel-electric shunting locomotive

LNER DES2
British Rail Class D3/14
Type and origin
Power typeDiesel-electric
BuilderLondon and North Eastern Railway’s Doncaster Works
Build date1947
Total produced1
Specifications
Configuration:
 • Whyte0-6-0DE
 • UICC
Gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
Wheel diameter4 ft 0 in (1.219 m)
Loco weight51.20 long tons (52.02 t; 57.34 short tons)
Prime moverPetter SS4
Traction motorsBrush Traction, 2 off
MU workingNot fitted
Train heatingNone
Train brakesVacuum
Performance figures
Power outputEngine: 360 bhp (270 kW)
Tractive effort32,000 lbf (142.3 kN)
Career
OperatorsLondon and North Eastern Railway,
British Railways
ClassLNER: DES2; BR: DEJ2; later D3/14; later 3/2
NumbersLNER: (none);
BR: 15004
Axle load classRoute availability 5
RetiredSeptember 1962
DispositionScrapped, Doncaster Works

British Rail Class D3/14 was a diesel-electric locomotive built by the London and North Eastern Railway at its Doncaster Works. It had a Petter engine, and Brush Traction electricals. It was absorbed by British Railways on nationalisation, but was withdrawn in the pre-TOPS era.

History

Originally laid down as a D3/9, the frames were moved from Doncaster Works to Brush Traction's Falcon Works in Loughborough for final assembly. It was completed in September 1947 and undertook trials with LNER in November 1947. In January 1948, it was moved to Temple Mills Yard in London for further trials. It was then moved to March Whitemoor Yard. In December 1948, it was returned to Loughborough and was acquired by British Rail upon nationalisation.

In April 1949, it was delivered to March shed. Whilst based at March, it was used on short freight services between Ferme Park and Herne Hill. It moved to Hornsey Depot in December 1951, however it was moved to Crewe Works later that month. It returned to March in January 1952 and returned to Hornsey in around 1955. In January 1957, it worked at Woodford Halse Shed and New England Shed in Peterborough where it remained until withdrawal in October 1962.

Upon withdrawal, it was moved to Doncaster Works, and was finally scrapped in July 1963.

See also

Sources

  1. "D3/14 0-6-0". Brdatabase.info. Retrieved 4 August 2022.
  2. ^ The Allocation History of BR Diesel Shunters. Heritage Shunters Trust. 2018. pp. 33–34.
  • Brush Diesel & Electric Locomotive Works List (reprint ed.). Industrial Railway Society. 1999.
  • Ian Allan ABC of British Railways Locomotives (Winter 1962–3 ed.). p. 227.
  • Strickland, David C. (1982). Locomotive Directory, every single one there has ever been. Camberley, Surrey: Diesel and Electric Group. p. 62. ISBN 978-0-906375-10-5.
London and North Eastern Railway locomotives
Pre-grouping
railway designs
Great Central
Great Eastern
Great North of Scotland
Great Northern
North British
North Eastern
North Eastern
(ex Hull & Barnsley)
LNER designs
Gresley (1923–1941)
Thompson (1941–1946)
Peppercorn (1946–1947)
Other designs
Proposed designs
  • P10 2-8-2T (Nov 1929)
  • B 4-6-0 (Nov 1936)
  • ? 4-8-2 (1939)
  • Q 0-8-0 (June 1930)
  • ? 4-8-4 (Feb 1946)
  • ? 4-8-2 (Feb 1946)
  • K 2-6-0 (Aug 1947)
see also
British Railways steam locomotives
GWR locomotives
LMS locomotives
Southern Railway locomotives
British railway locomotives and miscellany, 1948 to present
Diesel shunters
Diesel shunters
(pre-TOPS)
Main-line diesels:
Main-line diesels
(pre-TOPS)
Electrics
Electrics
(pre-TOPS)
Multi-modes
Departmental
Prototypes
Getlink locomotives
Steam locomotives
Ships


Stub icon

This diesel locomotive-related article is a stub. You can help Misplaced Pages by expanding it.

Categories: