Misplaced Pages

Bukasa Inland Port

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.

Port in Uganda
Bukasa Inland Port
Click on the map for a fullscreen view
Location
CountryUganda
LocationBukasa, Kira Town, Wakiso District
Coordinates00°17′23″N 32°40′14″E / 0.28972°N 32.67056°E / 0.28972; 32.67056
Details
Owned byGovernment of Uganda
Type of harbourNatural/Artificial
The map showing Wakiso District were Bukasa Inland port is being constructed

Bukasa Inland Port is an inland port ubder construction in Uganda. Construction of the first phase began on 2 May 2024 with completion expected in 2025.

Location

The port is located along the northern shores of Lake Victoria, on approximately 400 hectares (1.5 sq mi) in the neighborhood of Bukasa in Wakiso District, about 16 kilometres (10 mi), by road, south-east of the central business district of Kampala, the capital and largest city of Uganda. When fully functional, the port is expected to occupy a bigger land area. Efforts to secure more land are underway.

In February 2019, the Daily Monitor reported that the project area had been increased to 465 hectares (1,149 acres).

Overview

When completed the inland port is designed to handle up to 5.2 million tonnes of freight annually. The port will facilitate movement of goods from the Tanzanian ports of Dar es Salaam and Tanga, via rail to the port of Mwanza on Lake Victoria. Barges would then bring the cargo over the lake to Bukasa. This would reduce Uganda's near-total dependence on the port of Mombasa, Kenya.

Funding

Two German financial institutions agreed to lend US$48 million towards the construction of this port. The Uganda government will contribute US$8.5 million to this project. The funding for the construction of the port is as depicted in the table below:

Bukasa Inland Port Funding
Rank Name of Funder Dollars Funded (Millions) Percentage Funding
1 European Export and Trade Bank 24.0 42.48
2 Commerzbank 24.0 42.48
3 Government of Uganda 8.5 15.04
Total 56.5 100.00

Totals may be off slightly, due to rounding.

Construction

As of February 2018, GAUFF Gmbh & Co. Engineering KG, a German firm that is performing the consultancy work for the construction of the port, is finalizing the master design of the development. In July 2018, dredging of the swamps is expected to commence. Physical construction of the administration unit and the shipping facilities called Roll-on/Roll-off (RoRo) is expected to commence in June 2019, and last until April 2022. More development and expansion will continue until 2030. Construction of the initial phase is expected to last three years.

In February 2019, the National Environment Management Authority of Uganda (NEMA), approved the construction of this inland port. Construction will be phased.

Phase I

The first phase will involve construction of the port, administration jetty, free trade zone, shunting yard, a two-berth multipurpose terminal and a two berth Roro terminal.

Phase II

The second phase, expected to be complete by 2030, will extend the multipurpose terminal by additional two berths to a total quay length of 540 metres (1,772 ft).

Phase III

The third phase, to be completed by 2040, will extend the quay length of the multipurpose terminal to 960 metres (3,150 ft). All three phases will require the dredging Lake Victoria.

Developments

The engineering, procurement and construction (EPC) contract for the first phase was awarded to "Coppieters JV", at a contract price of €14.9 million. Gauff Consulting Engineers from Germany are the supervising consultants.

See also

References

  1. ^ Misairi Thembo Kahungu (15 February 2018). "Construction of Bukasa Inland Port starts next year". Daily Monitor. Kampala, Uganda. Retrieved 15 February 2018.
  2. ^ Samuel Balagadde (3 May 2024). "Construction of Bukasa Port Starts". New Vision. Kampala, Uganda. Retrieved 3 May 2024.
  3. "Road Distance Between Central Bank of Uganda, Kampala Road, Kampala, Central Region, Uganda and Kirombe, Kampala, Central Region, Uganda" (Map). Google Maps. Retrieved 3 May 2024.
  4. ^ 256BN (25 April 2016). "Bukasa Inland Port secures funding". 256 Business News (256BN). Retrieved 2 August 2016.{{cite web}}: CS1 maint: numeric names: authors list (link)
  5. Musisi, Frederic (26 February 2013). "Bukasa Inland Port survey scheduled for next month". Daily Monitor. Kampala. Retrieved 2 August 2016.
  6. ^ Tajuba, Paul (25 February 2019). "Nema okays Kampala port construction". Daily Monitor. Kampala. Retrieved 26 February 2019.
  7. Biryabarema, Elias (12 February 2013). "Uganda to build inland port to reduce reliance on Kenya". Reuters.com. Archived from the original on 17 August 2016. Retrieved 2 August 2016.
  8. Asiimwe, Dicta (30 April 2016). "Kampala borrows $48m to build inland port on shores of Lake Victoria". The EastAfrican. Nairobi. Retrieved 2 August 2016.
  9. "Bukasa Port - GAUFF Engineering Kompetenz in Infrastruktur". www.gauff.net. Retrieved 5 February 2021.
  10. Vision Reporter (12 February 2013). "Uganda to build inland port to reduce reliance on Kenya". New Vision. Kampala. Retrieved 15 February 2018.

External links


Wakiso District
Capital: Wakiso
Counties and
sub-counties
  • Kyaddondo County
  • Busiro County
Parishes
  • Busukuma
  • Entebbe
  • Gombe
  • Kakiri
  • Katabi
  • Kasanje
  • Kira
  • Masulita
  • Maya
  • Mutundwe
  • Nabweru
  • Namayumba
  • Nangabo
  • Nansana
  • Nsangi
  • Ssabagabo
  • Ssisa
  • Wakiso
  • Towns and villages
    Economy
    Banking
    Hotels & resorts
    Notable landmarks
    Transport
    Energy
    Education
    Health
    Notable people

    00°17′23″N 32°40′14″E / 0.28972°N 32.67056°E / 0.28972; 32.67056

    Categories: