Misplaced Pages

Line 20 (Shenzhen Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Metro line in Shenzhen, China
Line 20
Overview
Other name(s)Fuyong line
(福永线; 福永線; Fúyǒng xiàn; fuk1 wing5 sin3)
Native name二十号线; 二十號線; Èrshí hào xiàn; ji6 sap6 hou6 sin3
StatusOperational
OwnerShenzhen Metro Group
LocaleShenzhen, China
Termini
Stations5 (Phase 1)
Color on map     Cyan (#88dbdf)
Service
TypeRapid transit
SystemShenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Rolling stockCRRC Changchun (2001-2009) (Type A, 8 cars)
History
Opened28 December 2021; 2 years ago (2021-12-28)
Technical
Line length8.43 km (5.24 mi) (Phase 1)
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1,500 V DC (overhead lines)
Route map

Legend
Convention & Exhibition City
12 Right arrow to Waterlands Resort East
Shenzhen World North 12
Shenzhen World 12
Shenzhen World South
Suishen intercity railway to Xintangnan Right arrow
Airport North Stabling Yard (Line 11)
connection to Line 11
Airport North Depot (Line 20)
11 Right arrow to Bitou
Airport North 11 Shenzhen Airport North railway station
11 Down arrow to Gangxia North
Down arrow Suishen intercity railway to Shenzhenjichang
Airport East 1 12
Hangcheng Hospital
Hangcheng OSI to 12 Xixiang Taoyuan)
Hangcheng Depot
Xixiang Park 15
15
Left arrow anti-clockwise
clockwise Right arrow
Shangchuan 1st Road
5
Left arrow to Chiwan
to Huangbeiling Right arrow
Xin'an Old Town
Zhongshan Park West
12 Left arrow to Zuopaotai East
Nantou Ancient City 12
15
Left arrow clockwise
anti-clockwise Right arrow
Shenzhen University 1 13
13
Left arrow to Shenzhen Bay Checkpoint
to Shangwu Right arrow
Hi-Tech Park 1
Baishizhou 1 29
29
Left arrow to Hongshuwan South
to Xingdong Right arrow
Future extension
1 Down arrow to Luohu
This diagram:

Line 20 is a rapid transit line in the Shenzhen Metro system. The line connects Airport North with the Convention & Exhibition City.

Construction started on 24 November 2016. The National Development and Reform Commission approved the project in March 2020. It opened on 28 December 2021, after being delayed since 2018.

Stations

Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Convention & Exhibition City 会展城 0.0 0.0 Bao'an
Shenzhen World North 国展北 12 B892 M515 1.6 1.6
Shenzhen World 国展 12 615 B892 M515 0.8 2.4
Shenzhen World South 国展南 M341 1.3 3.7
Airport North 机场北 11 Shenzhen Bao'an International Airport SZX 4.4 8.1

Phase 2

  • Phase 2 of Line 20 will add 14 stations from Airport North to Futian Bonded Area South. The line is 24.9 km in length. Construction started on the section between Airport North and Baishizhou on 10 October 2023, and this section is expected to open in February 2029. The remaining section between Baishizhou and Futian Convention and Exhibition Centre is still under planning, and the section between Futian Convention and Exhibition Centre and Futian Bonded Area South has not been submitted for approval.
Station name Connections Location
English Chinese
Airport East 机场东 1 12 Bao'an
Hangcheng Hospital 航城医院
Hangcheng 航城
Xixiang Park 西乡公园  15 
Shangchuan 1st Road 上川一路
Xin'an Old Town 新安老城
Zhongshan Park West 中山公园西 Nanshan
Nantou Ancient City 南头古城 12
Shenzhen University 深大 1  13 
Hi-Tech Park 高新园 1
Baishizhou 白石洲 1  29 
Down arrow Under Planning (Phase 2 remaining section) Down arrow
Window of the World 世界之窗 1 2 8 Nanshan
Xiangmihu West 香蜜湖西  14   22  Futian
Futian Convention & Exhibition Center 福田会展
Huanggang Checkpoint 皇岗口岸 7
Futian Checkpoint 福田口岸 4 10
Futian Bonded Area South 福保南  22 

Rolling stock

Line 20 train

Line 20 currently uses 9 sets of Size A subway trains in eight car sets (no. 2001–2009) with a maximum speed of 120 km/h (75 mph). It's the first time that Shenzhen Metro use GoA4 automatic train operation. The GoA4 construction standard is applied to Phase I of Shenzhen Metro Line 20, which can fully achieve the automatic operation of unattended trains after opening, and the trains can also automatically sleep, wake up and conduct self inspection. In addition, the train also has more than ten functions, such as train stop control, door platform door alignment isolation, etc.

Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2020 - 2021 A-size stock 9 2001-2009 Tc+Mp+M+Mp+M+M+Mp+Tc Manufactured by CRRC Changchun Railway Vehicles

References

  1. "深圳地铁四期建设规划调整方案获批". 2020-04-11.
  2. ^ "深圳市地铁20号线全线开工". 2016-11-24.
  3. "深圳国际会展中心配套市政项目总体设计专家评审会顺利召开". www.mp.weixin.qq.com. Retrieved 2016-07-08.
  4. Colston, Paul (6 January 2022). "Shenzhen World now connected by Metro Line 20". Exhibition World. Archived from the original on 2 February 2022. Retrieved 23 October 2023.
  5. "国家发展改革委关于调整深圳市城市轨道交通第四期建设规划方案的批复". 2020-03-26. Retrieved 2020-04-26.
  6. "铁建南方领导到20号线检查工作". 铁建南方.
  7. "市规划和自然资源局关于深圳市城市轨道交通20号线交通详细规划(草案)的公示". 2021-11-22.
  8. "无人驾驶!20号线一期首列车本月抵深,通车时间为……". 2021-04-15.
Shenzhen Metro lines
Lines in operation
Under construction
Under planning
Shenzhen Metro stations
Current stations
Line 20 SZM
Future development
Line 20
Stations that are proposed, under planning or under construction are shown in italics. English names of these stations are not yet confirmed.
Categories: