Misplaced Pages

Line 25 (Shenzhen Metro)

Article snapshot taken from Wikipedia with creative commons attribution-sharealike license. Give it a read and then ask your questions in the chat. We can research this topic together.
Future Shenzhen Metro line
Line 25
25
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
Stations14 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
Technical
Line length16.2km (Phase 1)
CharacterUnderground
Operating speed80km/h

Line 25 of the Shenzhen Metro is a line under construction, which will connect across Shenzhen through the districts of Luohu, Longhua, Longgang and Bao'an for 38.5 kilometers and 30 stations. Construction started on 26 February 2024. The first phase of Line 25 will run from Jihua Hospital in Longgang District to Shilong in Bao'an District, with 14 stations and 16.2 kilometers of track. The line is proposed to use 6 car type B trains.

Stations (Phase 1)

Station name Connections Location
English Chinese
Jihua Hospital 吉华医院  27  Longgang
Bei'er Road 贝尔路 10
Huangjun Hill 黄君山
Shangyousong 上油松 Longhua
Yousong 油松  22 
Youfu 油福  27 
Jinglong 景龙
Longhua 龙华 4
Longhua Park 龙华公园
Huafu 华富
Huachang 华昌
Shi'ao 石凹
Creative City 创意城
Shilong 石龙 Bao'an

References

  1. 多条地铁规划涉及宝安!深圳市城市轨道交通第五期建设规划公示. www.sznews.com. 2022-08-27.
  2. 新增13条地铁!深圳轨道交通第五期规划环评首次公示,速看. mp.weixin.qq.com. 2022-08-28.
  3. 地铁五期13条线路规划公布. www.sz.gov.cn. 2022-09-07.
Shenzhen Metro lines
Lines in operation
Under construction
Under planning
Categories: